EXECUTIVE SUMMARY
City Council Regular Meeting: June 21, 2016
AGENDA ITEM: MS4 Annual Report AGENDA SECTION:
Consent
PREPARED BY: Christine Watson, Public Works
Coordinator AGENDA NO. 6.n.
ATTACHMENTS: MS4 Annual Report for 2015 APPROVED BY: ddj
RECOMMENDED ACTION: Motion to approve the MS4 Annual Report for 2015 and
authorize its submittal to the MPCA.
BACKGROUND
Attached for your information is the Municipal Separate Storm Sewer System (MS4) Annual Report for
2015. This report outlines the requirements for the maintenance and operation of the storm sewer system,
as well as the city’s actions towards meeting those requirements in 2015. This report is required by the
Minnesota Pollution Control Agency to be submitted by June 30 of each year as part of the City’s National
Pollutant Discharge Elimination System (NPDES) Permit.
A requirement of the NPDES Permit is to conduct an annual public informational meeting to invite public
input on the City’s Stormwater Pollution Prevention Plan (SWPPP). This meeting was held on April 27,
2015. There we no attendees.
SUMMARY
Staff recommends that City Council approve the 2015 MS4 Annual Report and authorize the submittal of
the report to the MPCA.
You are currently logged in as:
Rosemount City MS4
If this is correct, click the 'Next' button. If this information is incorrect, contact Cole
Landgraf (651-757-2880, cole.landgraf@state.mn.us) or Rachel Stangl (651-757-
2879, rachel.stangl@state.mn.us).
Before you begin...
A fillable Microsoft Word document with all of the questions is available at
https://www.pca.state.mn.us/sites/default/files/wq-strm4-06a.doc (for personal use
only, not for submittal).
The MS4 Annual Report for 2015 will automatically save your answers when you
hit the ‘Next’ button at the bottom of each page.
If you wish to leave the MS4 Annual Report for 2015 and complete the document
at another time, you may do so by hitting ‘Next’ at the bottom of your current page
to save your progress before exiting the document. Return to the survey by
following the previously used web link, and again login using your email and
assigned password credentials. Once you successfully log in, your previous
answers will appear.
The MPCA will email a PDF of your MS4 Annual Report for 2015 information to
you in a confirmation email within three business days after you submit this form.
You may print a copy of the MS4 Annual Report for 2015 for your records at any
time by pressing the ‘Print’ button at the bottom of the page.
Additionally, it is possible to save a PDF copy of the MS4 Annual Report for 2015 if
you are working on a computer with OneNote (a program often included in
Microsoft Office packages). Detailed saving instructions are available at
stormwater.pca.state.mn.us/index.php/Guidance_for_saving_MS4_annual_reports.
MS4 Annual Report for 2015
Page 1 of 15Thursday, June 16, 2016
MS4 Annual Report for 2015
Reporting period: January 1, 2015 to December 31, 2015
Due: June 30, 2016
Instructions: Complete this annual report to provide a summary of your activities
under the 2013 MS4 Permit (Permit) between January 1, 2015 and December 31,
2015. MPCA staff may contact you for additional information.
Fillable document available at https://www.pca.state.mn.us/sites/default/files/wq-
strm4-06a.doc (for personal use only, not for submittal).
Questions: Contact Cole Landgraf at 651-757-2880 or cole.landgraf@state.mn.us
or Rachel Stangl at 651-757-2879 or rachel.stangl@state.mn.us.
MS4 General Contact Information
Full name Christine Watson
Title Public Works Coordinator
Mailing
address 2875 145th Street West
City Rosemount
State MN
Zip code 55068
Phone 651-322-2091
Email christine.watson@ci.rosemount.mn.us
Preparer Contact Information (if different from the MS4 General Contact)
Full name
Title
Organization
Mailing
address
City
State
Zip code
Phone
Email
MS4 Annual Report for 2015
Page 2 of 15Thursday, June 16, 2016
MCM 1: Public Education and Outreach
The following questions refer to Part III.D.1. of the Permit.
Q2 Did you select a stormwater-related issue of high priority to be emphasized during
this Permit term? [Part III.D.1.a.(1)]
Yes
No
Q3 What is your stormwater-related issue(s)? Check all that apply.
TMDL(s)
Local businesses
Residential BMPs
Pet waste
Yard waste
Deicing materials
Household chemicals
Construction activities
Post-construction activities
Other
Q4 Have you distributed educational materials or equivalent outreach to the public
focused on illicit discharge recognition and reporting? [Part III.D.1.a.(2)]
Yes
No
Q5 Do you have an implementation plan as required by the Permit? [Part III.D.1.b.]
Yes
No
Q6 How did you distribute educational materials or equivalent outreach? Check all that
apply and provide circulation/audience associated with each item. [Part III.D.1.a.]
Brochure
Newsletter
Utility bill insert
Newspaper ad
Radio ad
Television ad
Cable access channel
Stormwater-related event
School presentation or project
Website
Other (1)
Other (2)
Other (3)
Q7 Intended audience? Check all that apply.
MS4 Annual Report for 2015
Page 3 of 15Thursday, June 16, 2016
Residents Local
Businesses
Developers Students Employees Other
Newsletter
School
presentation
or project
Website
Q8 Enter the total circulation/audience (if unknown, use best estimate):
Newsletter 7500
School
presentation
or project
65
Website 100
Provide a brief description of each activity related to public education and outreach
(e.g. rain garden workshop, school presentation, public works open house) held
and the date each activity was held from January 1, 2015 to December 31, 2015.
[Part III.D.1.c.(4)]
Q9Date of activity Q10Description of activity
Date
(mm/dd/yyyy)11/13/2015
Stormwater Pollution Prevention
presentation with Rosemount Elementary
School fifth grade
Date
(mm/dd/yyyy)03/11/2015 Annual Public Meeting held at City Hall
(no attendees)
Date
(mm/dd/yyyy)07/01/2015
Rosemount City News newsletter article -
Easy Ways We Can All Help Reduce Water
Pollution
Date
(mm/dd/yyyy)11/01/2015 Rosemount City News newsletter article -
Limit Your Salt Use This Winter
Date
(mm/dd/yyyy)03/01/2015 Rosemount City News newsletter article -
MS4 Pond Maintenance
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Date
(mm/dd/yyyy)
Q11 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your public education and outreach program?
[Part IV.B.]
Yes
MS4 Annual Report for 2015
Page 4 of 15Thursday, June 16, 2016
No
MCM 2: Public Participation/Involvement
The following questions refer to Part III.D.2.a. of the Permit.
Q12 You must provide a minimum of one opportunity each year for the public to provide
input on the adequacy of your Stormwater Pollution Prevention Program (SWPPP).
Did you provide this opportunity between January 1, 2015 and December 31,
2015? [Part III.D.2.a.(1)]
Yes
No
Q13 What was the opportunity that you provided? Check all that apply.
Public meeting
Public event
Other
Q14 Did you hold a stand-alone meeting or combine it with another event?
Stand-alone
Combined
Enter the date
of the public
meeting
(mm/dd/yyyy):
3/11/2015
Enter the
number of
citizens that
attended and
were informed
about your
SWPPP:
0
Q17 Between January 1, 2015 and December 31, 2015, did you receive any input
regarding your SWPPP?
Yes
No
Q19 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your public participation/involvement
program? [Part IV.B.]
Yes
No
MCM 3: Illicit Discharge Detection and Elimination
The following questions refer to Part III.D.3. of the Permit.
MS4 Annual Report for 2015
Page 5 of 15Thursday, June 16, 2016
Q20 As of December 31, 2015, have you enacted a regulatory mechanism which
prohibits non-stormwater discharges to your MS4?
Yes
No
Q21 Provide either a website address to the above regulatory mechanism or upload a
copy. How will you provide this regulatory mechanism?
Website address
Upload
Q22 Website address:
http://sterlingcodifiers.com/codebook/index.php?
book_id=452&chapter_id=57112#s534716
Q24 Did you identify any illicit discharges between January 1, 2015 and December 31,
2015? [Part III.D.3.h.(4)]
Yes
No
Q25 Enter the number of illicit discharges detected:
3
Q26 How did you discover these illicit discharges? Check all that apply and enter the
number of illicit discharges discovered by each category.
Public complaint
Staff
Q28 Enter the number discovered by staff:
3
Q29 Did any of the discovered illicit discharges result in an enforcement action (this
includes verbal warnings)?
Yes
No
Q30 What type of enforcement action(s) was taken and how many of each action were
issued between January 1, 2015 and December 31, 2015? Check all that apply.
Verbal warning
Notice of violation
Fines
Criminal action
Civil penalties
Other
Enter the number of
verbal warnings
issued:
3
MS4 Annual Report for 2015
Page 6 of 15Thursday, June 16, 2016
Q31 Did the enforcement action(s) taken sufficiently address the illicit discharge(s)?
Yes
No
Q33 Do you have written Enforcement Response Procedures (ERPs) to compel
compliance with your illicit discharge regulatory mechanism(s)? [Part III.B.]
Yes
No
Q34 Provide either a website address to the above ERPs or upload a copy. How will
you provide these ERPs?
Website address
Upload
Q36 Click the "up arrow" icon below to upload a file. When it has uploaded successfully,
a unique ID will appear in the box. Only files less than 10 MB in size will upload.
ref:0000000052:Q36
Q37 Did you train all field staff in illicit discharge recognition (including conditions which
could cause illicit discharges) and reporting illicit discharges for further
investigations? [Part III.D.3.e.]
Yes
No
Q38 How did you train your field staff? Check all that apply.
Email
PowerPoint
Presentation
Video
Field Training
Other
The following questions refer to Part III.C.1. of the Permit.
Q39 Did you update your storm sewer system map between January 1, 2015 and
December 31, 2015? [Part III.C.1.]
Yes
No
Q40 Does your storm sewer map include all pipes 12 inches or greater in diameter and
the direction of stormwater flow in those pipes? [Part III.C.1.a.]
Yes
No
Q41 Does your storm sewer map include outfalls, including a unique identification (ID)
number and an associated geographic coordinate? [Part III.C.1.b.]
MS4 Annual Report for 2015
Page 7 of 15Thursday, June 16, 2016
Yes
No
Q42 Does your storm sewer map include all structural stormwater BMPs that are part of
your MS4? [Part III.C.1.c.]
Yes
No
Q43 Does your storm sewer map include all receiving waters? [Part III.C.1.d.]
Yes
No
Q44 In what format is your storm sewer map available?
Hardcopy only
GIS
CAD
Other
Q45 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your illicit discharge detection and elimination
(IDDE) program? [Part IV.B.]
Yes
No
MCM 4: Construction Site Stormwater Runoff Control
The following questions refer to Part III.D.4. of the Permit.
Q46 As of December 31, 2015, have you enacted a regulatory mechanism that is at
least as stringent as the Agency's general permit to Discharge Stormwater
Associated with Construction Activity (CSW Permit) No. MN R100001
(http://www.pca.state.mn.us/index.php/view-document.html?gid=18984) for
erosion and sediment controls and waste controls? [Part III.D.4.a.]
Yes
No
Q47 Have you developed written procedures for site plan reviews as required by the
Permit? [Part III.D.4.b.]
Yes
No
Q48 Have you documented each site plan review as required by the Permit? [Part
III.D.4.f.]
Yes
No
MS4 Annual Report for 2015
Page 8 of 15Thursday, June 16, 2016
Q49 Enter the number of site plan reviews conducted for sites an acre or greater of soil
disturbance between January 1, 2015 and December 31, 2015:
9
Q50 What types of enforcement actions do you have available to compel compliance
with your regulatory mechanism? Check all that apply and enter the number of
each used from January 1, 2015 to December 31, 2015.
Verbal warnings
Notice of violation
Administrative orders
Stop-work orders
Fines
Forfeit of security of bond money
Withholding of certificate of occupancy
Criminal actions
Civil penalties
Other
Enter the number of
verbal warnings
issued:
13
Enter the number of
notice of violations
issued:
7
Enter the number of
stop-work orders
issued:
4
Q51 Do you have written Enforcement Response Procedures (ERPs) to compel
compliance with your construction site stormwater runoff control regulatory
mechanism(s)? [Part III.B.]
Yes
No
Q52 Enter the number of active construction sites an acre or greater that were in your
jurisdiction between January 1, 2015 and December 31, 2015:
8
Q53 Do you have written procedures for identifying priority sites? [Part III.D.4.d.(1)]
Yes
No
Q54 How are sites prioritized? Check all that apply.
Site topography
Soil characteristics
Types of receiving water(s)
Stage of construction
Compliance history
MS4 Annual Report for 2015
Page 9 of 15Thursday, June 16, 2016
Weather conditions
Other
Q55 Do you have a checklist or other written means to document site inspections when
determining compliance? [Part III.D.4.d.(4)]
Yes
No
Q56 Enter the number of site inspections conducted for sites an acre or greater
between January 1, 2015 and December 31, 2015:
128
Q57 Enter the frequency at which site inspections are conducted (e.g. daily, weekly,
monthly): [Part III.D.4.d.(2)]
Weekly
Q58 Enter the number of trained inspectors that were available for construction site
inspections between January 1, 2015 and December 31, 2015:
3
Q59 Provide the contact information for the inspector(s) and/or organization that
conducts construction stormwater inspections for your MS4. List your primary
construction stormwater contact first if you have multiple inspectors.
(1) Inspector name Meghan Litsey
Organization WSB & Associates, Inc
Phone (Office)763-287-7155
Phone (Work Cell)612-723-9166
Email mlitsey@wsbeng.com
Preferred contact
method Email
(2) Inspector name Rich Lonnquist
Organization City of Rosemount
Phone (Office)651-322-2055
Phone (Work Cell)651-485-1834
Email rich.lonnquist@ci.rosemount.mn.us
Preferred contact
method Email
(3) Inspector name Mitch Hatcher
Organization WSB & Associates, Inc
Phone (Office)651-322-2015
Phone (Work Cell)612-360-1316
Email mitch.hatcher@ci.rosemount.mn.us
MS4 Annual Report for 2015
Page 10 of 15Thursday, June 16, 2016
Preferred contact
method
email
Q60 What training did inspectors receive? Check all that apply.
University of Minnesota Erosion and Stormwater Management Certification Program
Qualified Compliance Inspector of Stormwater (QCIS)
Minnesota Laborers Training Center Stormwater Pollution Prevention Plan Installer or
Supervisor
Minnesota Utility Contractors Association Erosion Control Training
Certified Professional in Erosion and Sediment Control (CPESC)
Certified Professional in Stormwater Quality (CPSWQ)
Certified Erosion, Sediment and Storm Water Inspector (CESSWI)
Other
Q61 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your construction site stormwater runoff
control program? [Part IV.B.]
Yes
No
MCM 5: Post-Construction Stormwater Management
The following questions refer to Part III.D.5. of the Permit.
Q62 As of December 31, 2015, have you enacted a regulatory mechanism to
incorporate all requirements as specified in Part III.D.5.a. of the Permit?
Yes
No
Q63 What approach are you using to meet the performance standard for Volume, Total
Suspended Solids (TSS), and Total Phosphorus (TP) as required by the Permit?
[Part III.D.5.a.(2)]
Check all that apply.
Refer to the link http://www.pca.state.mn.us/index.php/view-document.html?
gid=17815 for guidance on stormwater management approaches.
Retain a runoff volume equal to one inch times the area of the proposed increase of
impervious surfaces on-site
Retain the post-construction runoff volume on site for the 95th percentile storm
Match the pre-development runoff conditions
Adopt the Minimal Impact Design Standards (MIDS)
An approach has not been selected
Other method (Must be technically defensible--e.g. based on modeling, research and
acceptable engineering practices)
Other, describe:
The City's policy for developments and redevelopments greater than 1 acre in
which the City will not be providing a regional storm water system, is to
provide storage for the runoff from the 100 year, 24 hour storm event on-site.
MS4 Annual Report for 2015
Page 11 of 15Thursday, June 16, 2016
Developments will be required to provide 1/12 of an acre-foot/acre/day of
infiltration for the entire site's acreage.
Q64 Do you have written Enforcement Response Procedures (ERPs) to compel
compliance with your post-construction stormwater management regulatory
mechanism(s)? [Part III.B.]
Yes
No
Q65 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your post-construction stormwater
management program? [Part IV.B.]
Yes
No
MCM 6: Pollution Prevention/Good Housekeeping for Municipal Operations
The following questions refer to Part III.D.6. of the Permit.
Q66 Enter the total number of structural stormwater BMPs, outfalls (excluding
underground outfalls), and ponds within your MS4 (exclude privately owned).
Structural
stormwater
BMPs
1697
Outfalls 161
Ponds 65
Q67 Enter the number of structural stormwater BMPs, outfalls (excluding underground
outfalls), and ponds that were inspected from January 1, 2015 to December 31,
2015 within your MS4 (exclude privately owned). [Part III.D.6.e.]
Structural
stormwater
BMPs
1697
Outfalls 31
Ponds 13
Q68 Have you developed an alternative inspection frequency for any structural
stormwater BMPs, as allowed in Part III.D.6.e.(1) of the Permit?
Yes
No
Q69 Based on inspection findings, did you conduct any maintenance on any structural
stormwater BMPs? [Part III.D.6.e.(1)]
Yes
No
MS4 Annual Report for 2015
Page 12 of 15Thursday, June 16, 2016
Q70 Briefly describe the maintenance that was conducted:
Clean sump man holes if over 50% full.
Q71 Do you own or operate any stockpiles, and/or storage and material handling
areas? [Part III.D.6.e.(3)]
Yes
No
Q72 Did you inspect all stockpiles and storage and material handling areas quarterly?
[Part III.D.6.e.(3)]
Yes
No
Q73 Based on inspection findings, did you conduct maintenance at any of the
stockpiles and/or storage and material handling areas?
Yes
No
Q74 Briefly describe the maintenance that was conducted:
Maintained stockpiles as needed.
Q75 Between January 1, 2015 and December 31, 2015, did you modify your BMPs,
measurable goals, or future plans for your pollution prevention/good housekeeping
for municipal operations program? [Part IV.B.]
Yes
No
Partnerships
Q84 Did you rely on any other regulated MS4s to satisfy one or more Permit
requirements?
Yes
No
Additional Information
If you would like to provide any additional files to accompany your annual report,
use the space below to upload those files. For each space, you may attach one
file. You may provide additional explanation and/or information in an email with the
subject YourMS4NameHere_2015AR to ms4permitprogram.pca@state.mn.us.
Q86 Click the "up arrow" icon below to upload a file. When it has uploaded successfully,
a unique ID will appear in the box. Only files less than 10 MB in size will upload.
MS4 Annual Report for 2015
Page 13 of 15Thursday, June 16, 2016
Q87 Click the "up arrow" icon below to upload a file. When it has uploaded successfully,
a unique ID will appear in the box. Only files less than 10 MB in size will upload.
Q88 Click the "up arrow" icon below to upload a file. When it has uploaded successfully,
a unique ID will appear in the box. Only files less than 10 MB in size will upload.
Q89 Optional, describe the file(s) uploaded:
Owner or Operator Certification
The person with overall administrative responsibility for SWPPP implementation
and Permit compliance must certify this MS4 Annual Report. This person must be
duly authorized and should be either a principal executive (i.e., Director of Public
Works, City Administrator) or ranking elected official (i.e., Mayor, Township
Supervisor).
I certify under penalty of law that this document and all attachments were prepared
under my direction or supervision in accordance with a system designed to assure
that qualified personnel properly gathered and evaluated the information
submitted. Based on my inquiry of the person or persons who manage the system,
or those persons directly responsible for gathering the information, the information
submitted is, to the best of my knowledge and belief, true, accurate, and complete
(Minn. R. 7001.0070). I am aware that there are significant penalties for submitting
false information, including the possibility of fine and imprisonment (Minn. R.
7001.0540).
Yes
By typing my name in the following box, I certify the above statements to be true and
correct, to the best of my knowledge, and that information can be used for the
purpose of processing my MS4 Annual Report.
Name:Patrick Wrase
Title:Director of Public Works / City Engineer
06/15/2016
MS4 Annual Report for 2015
Page 14 of 15Thursday, June 16, 2016
Date:
(mm/dd/yyyy)
When you are ready to submit, you must click the
'Submit' button at the bottom of this page.
Provide the email(s) of the individual(s) you would like to receive the MS4 Annual
Report for 2015 submittal confirmation email from the MPCA. After you click the
Submit button below, please allow up to three business days to receive this email.
Email
(1)christine.watson@ci.rosemount.mn.us
Email
(2)pwadm@ci.rosemount.mn.us
Email
(3)mlitsey@wsbeng.com
Print or save a copy of your completed MS4 Annual Report for 2015 for your
records. The MPCA will email a PDF of your MS4 Annual Report for 2015
information in a confirmation email within three business days after you
submit this form to the email(s) you provided above.
You may print a copy of the MS4 Annual Report for 2015 for your records by
pressing the ‘Print’ button at the bottom of the page.
Additionally, it is possible to save a PDF copy of the MS4 Annual Report for 2015 if
you are working on a computer with OneNote (a program often included in
Microsoft Office packages). Detailed saving instructions are available at
stormwater.pca.state.mn.us/index.php/Guidance_for_saving_MS4_annual_reports.
If you have any questions, contact MPCA staff Cole Landgraf
(cole.landgraf@state.mn.us, 651-757-2880) or Rachel Stangl
(rachel.stangl@state.mn.us, 651-757-2879).
MS4 Annual Report for 2015