HomeMy WebLinkAbout6.j. Receive Bids Award Contract – Safe Routes to School ProjectI:\City Clerk\Agenda Items\Approved Items\6.j. Receive Bids Award Contract – Safe Routes to School Project.docx EXECUTIVE SUMMARY City Council Regular Meeting: July 19, 2016 AGENDA ITEM: Receive Bids/Award Contract – Safe Routes to School Project, City Project ENG 180 AGENDA SECTION: Consent PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.j. ATTACHMENTS: Resolution; Letter of Recommendation; Bid Summary APPROVED BY: ddj RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Safe Routes to School Project, City Project ENG 180. BACKGROUND: On Tuesday, June 21, 2016, three bids were received for the Safe Routes to School Project and read aloud publicly. The low bidder is Max Steininger, Inc. who submitted a base bid in the amount of $450,549.57. The low base bid amount of $450,549.57 is 4.1% lower than the estimated construction cost of $469,700. The project involves the construction of a 5’ sidewalk along the north side of 144th Street from Chili Avenue to Cameo Avenue, an 8’ trail at Shannon Park Elementary School, and an LED crosswalk sign at Evermoor Parkway and Creggs Circle. It is anticipated that the portion of the work in front of Rosemount Elementary and Shannon Park Elementary will be completed by September 2, 2016. The remaining work is anticipated to be completed by September 30, 2016 SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract to Max Steininger, Inc. for the Safe Routes to School Project, City Project ENG 180. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2014 – A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE SAFE ROUTES TO SCHOOL PROJECT CITY PROJECT ENG 180 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Safe Routes to School Project are hereby received and tabulated. 2. Based on the Base Bid, the bid of Max Steininger, Inc. in the amount of $450,549.57 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 19th day of July, 2016. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk BuildingalegacyΑ ǤƚǒƩ legacy.701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 June13,2016 HonorableMayorandCityCouncil CityofRosemount th 2875145StreetWest Rosemount,MN55068 Re:RosemountSafeRoutestoSchoolProject CityofRosemountProjectNo.ENG180 WSBProjectNo.0192892 DearMayorandCouncilMembers: BidswerereceivedfortheabovereferencedprojectonTuesday,June21,2016,andwereopenedand readaloud.Atotalofthreebidswerereceived.Thebidswerecheckedformathematicalaccuracyand tabulatedandtherearenoerrorsmadeontheProposalForm.The9ƓŭźƓĻĻƩ͸ƭEstimatewas $469,711.70.ThebidtabulationindicatesthelowbidderasMaxSteininger,Inc.,Eagan,MN,inthe amountof$450,549.57. WerecommendthattheCityconsiderthesebidsandawardacontracttoMaxSteininger,Inc.,basedon theresultsofthebidsreceived. Sincerely, WSB&Associates,Inc. NicholasHentges,PE ProjectManager Enclosure cc:KevinKraus,MaxSteininger,Inc. PhilOlson,CityofRosemount AndyBrotzler,WSB&Associates,Inc. rh Equal Opportunity Employer wsbeng.com K:\\01928-920\\Admin\\Construction Admin\\01928-92 CST_LOR 20160713.docx PROJECT: OWNER: City of Rosemount, MN WSB PROJECT NO.: 1928-920 Bids Opened: June 21, 2016, 10:00 a.m. Contractor DBE Goal Bid Security (5%) Grand Total Bid 1 Max Steininger, Inc. 12% X $450,549.57 2 Pember Companies, Inc. 9.5% X $465,365.50 3 McNamara Contracting, Inc. 16.8% X $469,999.99 Engineer's Opinion of Cost $469,711.70 Denotes corrected figure Nicholas Hentges, PE Project Manager BID TABULATION SUMMARY I hereby certify that this is a true and correct tabulation of the bids as received on June 21, 2016. Rosemount Safe Routes to School Project C.P. ENG180 S.P. 208-591-002, Minn. Proj. No. TA 1916 (121) K:\01928-920\Admin\Construction Admin\01928-92 CST Bid Tab Summary_20160621 6/21/2016 WSBProject Bid AbstractProject Name: Safe Routes to School (144thStreet)Contract No.: Client: City of RosemountProject No.: 01928-92Bid Opening: Owner: MinneapolisProject: 01928-92 - Safe Routes to School (144th Street) Engineers Estimate Max Steininger, Inc. Pember Companies, Inc. McNamaraContracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceBase Bid 1 2021.501 MOBILIZATION LS 1$20,000.00$20,000.00$54,923.00$54,923.00$30,300.00$30,300.00$23,500.00$23,500.002 2101.501 CLEARING ACRE 0.02$5,000.00$100.00$5,350.44$107.01$8,500.00$170.00$5,250.00$105.003 2101.502 CLEARING TREE 4$260.00$1,040.00$802.57$3,210.28$700.00$2,800.00$800.00$3,200.004 2101.506 GRUBBING ACRE 0.02$4,000.00$80.00$5,350.44$107.01$8,500.00$170.00$5,250.00$105.005 2101.507 GRUBBING TREE 4$150.00$600.00$802.57$3,210.28$700.00$2,800.00$800.00$3,200.006 2104.501 REMOVE WATER MAIN L F 13$12.00$156.00$107.01$1,391.13$16.00$208.00$27.00$351.007 2104.501 REMOVE CURB & GUTTER L F 823$6.00$4,938.00$11.64$9,579.72$7.00$5,761.00$8.50$6,995.508 2104.501 REMOVE RETAINING WALL L F 3$20.00$60.00$161.48$484.44$30.00$90.00$180.00$540.009 2104.501 REMOVE CONCRETE RETAINING WALL L F 6$75.00$450.00$158.27$949.62$60.00$360.00$360.00$2,160.0010 2104.501 REMOVE WOOD RETAINING WALL L F 26$15.00$390.00$28.26$734.76$15.00$390.00$70.00$1,820.0011 2104.501 REMOVE WOOD FENCE L F 21$10.00$210.00$34.99$734.79$9.00$189.00$18.00$378.0012 2104.503 REMOVE CONCRETE WALK S F 1379$3.50$4,826.50$2.93$4,040.47$1.25$1,723.75$1.50$2,068.5013 2104.503 REMOVE BITUMINOUS WALK S F 729$3.00$2,187.00$2.93$2,135.97$0.40$291.60$2.00$1,458.0014 2104.503 REMOVE CONCRETE DRIVEWAY PAVEMENT S F 2916$2.00$5,832.00$3.52$10,264.32$1.25$3,645.00$2.50$7,290.0015 2104.503 REMOVE BITUMINOUS PAVEMENT S F 1521$1.60$2,433.60$5.92$9,004.32$0.80$1,216.80$2.00$3,042.0016 2104.503 REMOVE BITUMINOUS DRIVEWAY PAVEMENT S F 235$9.00$2,115.00$3.52$827.20$0.60$141.00$4.00$940.0017 2104.509 REMOVE CONCRETE STEPS EACH 2$200.00$400.00$484.65$969.30$90.00$180.00$200.00$400.0018 2104.509 REMOVE LIGHT FOUNDATION EACH 2$400.00$800.00$277.01$554.02$350.00$700.00$350.00$700.0019 2104.509 REMOVE HYDRANT EACH 1$800.00$800.00$1,070.09$1,070.09$350.00$350.00$400.00$400.001 Project: 01928-92 - Safe Routes to School (144th Street) Engineers Estimate Max Steininger, Inc. Pember Companies, Inc. McNamara Contracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price20 2104.509 REMOVE GUARD POST EACH 4$100.00$400.00$53.50$214.00$50.00$200.00$3,150.00$12,600.0021 2104.509 REMOVE SIGN TYPE C EACH 4$35.00$140.00$37.46$149.84$37.00$148.00$37.00$148.0022 2104.511 SAWING CONCRETE PAVEMENT (FULL DEPTH) L F 175$6.00$1,050.00$5.83$1,020.25$4.00$700.00$2.00$350.0023 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 864$5.00$4,320.00$2.39$2,064.96$3.85$3,326.40$2.00$1,728.0024 2104.523 SALVAGE LIGHTING UNIT EACH 2$750.00$1,500.00$1,153.66$2,307.32$1,000.00$2,000.00$1,000.00$2,000.0025 2104.523 SALVAGE SIGN TYPE C EACH 10$50.00$500.00$37.46$374.60$37.00$370.00$37.00$370.0026 2104.523 SALVAGE SIGN TYPE SPECIAL EACH 2$200.00$400.00$37.46$74.92$37.00$74.00$37.00$74.0027 2104.523 SALVAGE CASTING EACH 6$250.00$1,500.00$374.53$2,247.18$115.00$690.00$50.00$300.0028 2104.523 SALVAGE MAIL BOX SUPPORT EACH 18$40.00$720.00$37.46$674.28$37.00$666.00$37.00$666.0029 2104.601 REMOVE MISCELLANEOUS STRUCTURES LS 1$10,000.00$10,000.00$565.93$565.93$500.00$500.00$1,500.00$1,500.0030 2104.602 REMOVE EDGER BLOCK EACH 33$5.00$165.00$16.79$554.07$20.00$660.00$35.00$1,155.0031 2104.601 SALVAGE LANDSCAPE ROCK SY 15$20.00$300.00$53.50$802.50$15.00$225.00$12.00$180.0032 2104.618 REMOVE BRICK PAVERS S F 14$10.00$140.00$39.58$554.12$13.00$182.00$20.00$280.0033 2104.618 SALVAGE BRICK PAVERS S F 11$10.00$110.00$32.11$353.21$13.00$143.00$25.00$275.0034 2105.501 COMMON EXCAVATION C Y 1417$20.00$28,340.00$27.72$39,279.24$46.00$65,182.00$25.00$35,425.0035 2105.507 SUBGRADE EXCAVATION C Y 447$22.00$9,834.00$27.72$12,390.84$30.00$13,410.00$25.00$11,175.0036 2105.522 SELECT GRANULAR BORROW (CV) C Y 150$38.00$5,700.00$30.52$4,578.00$27.00$4,050.00$30.00$4,500.0037 2105.522 SELECT GRANULAR BORROW MOD 10% (CV) C Y 44$40.00$1,760.00$34.79$1,530.76$45.00$1,980.00$30.00$1,320.0038 2105.523 COMMON BORROW (CV) C Y 15$50.00$750.00$37.97$569.55$25.00$375.00$30.00$450.0039 2123.610 STREET SWEEPER (WITH PICKUP BROOM) HOUR 30$120.00$3,600.00$75.00$2,250.00$120.00$3,600.00$50.00$1,500.0040 2123.610 1.5 CU YD BACKHOE HOUR 5$250.00$1,250.00$158.11$790.55$190.00$950.00$200.00$1,000.0041 2130.501 WATER MGAL 20$50.00$1,000.00$38.61$772.20$50.00$1,000.00$50.00$1,000.0042 2211.503 AGGREGATE BASE (CV) CLASS 5 C Y 446$45.00$20,070.00$15.00$6,690.00$65.20$29,079.20$70.00$31,220.0043 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,B) TON 52$150.00$7,800.00$149.83$7,791.16$225.00$11,700.00$180.00$9,360.0044 2402.585 PIPE RAILING L F 64$140.00$8,960.00$135.90$8,697.60$150.00$9,600.00$160.00$10,240.0045 2411.511 STRUCTURE EXCAVATION CLASS U C Y 59$50.00$2,950.00$22.67$1,337.53$52.00$3,068.00$75.00$4,425.0046 2411.607 CONCRETE STEPS C Y 0.2$2,000.00$400.00$481.53$96.31$2,500.00$500.00$2,500.00$500.0047 2411.618 MODULAR BLOCK RETAINING WALL S F 293$52.00$15,236.00$36.65$10,738.45$40.00$11,720.00$40.00$11,720.0048 2502.601 IRRIGATION SYSTEM PROVISION LS 1$50,000.00$50,000.00$3,210.26$3,210.26$2,000.00$2,000.00$4,500.00$4,500.0049 2502.602 CONNECT TO EXISTING PIPE DRAIN EACH 2$500.00$1,000.00$588.55$1,177.10$300.00$600.00$370.00$740.002 Project: 01928-92 - Safe Routes to School (144th Street) Engineers Estimate Max Steininger, Inc. Pember Companies, Inc. McNamara Contracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price50 2503.511 4" PVC PIPE SEWER L F 55$15.00$825.00$80.26$4,414.30$24.00$1,320.00$30.00$1,650.0051 2503.541 12" RC PIPE SEWER DES 3006 CL V L F 117$65.00$7,605.00$53.50$6,259.50$46.00$5,382.00$41.00$4,797.0052 2503.602 CONNECT INTO EXISTING DRAINAGE STRUCTURE EACH 2$1,500.00$3,000.00$802.57$1,605.14$625.00$1,250.00$1,200.00$2,400.0053 2504.602 HYDRANT EACH 1$5,200.00$5,200.00$6,420.52$6,420.52$4,800.00$4,800.00$6,100.00$6,100.0054 2504.602 ADJUST HYDRANT EACH 1$2,500.00$2,500.00$802.57$802.57$750.00$750.00$1,000.00$1,000.0055 2504.602 6" GATE VALVE & BOX EACH 1$2,000.00$2,000.00$2,140.17$2,140.17$1,600.00$1,600.00$2,800.00$2,800.0056 2504.602 CONNECT TO EXISTING WATER MAIN EACH 1$2,000.00$2,000.00$1,605.13$1,605.13$1,500.00$1,500.00$1,300.00$1,300.0057 2504.603 6" WATERMAIN DUCTILE IRON CL 52 L F 16$60.00$960.00$160.51$2,568.16$70.00$1,120.00$55.00$880.0058 2506.502 CONST DRAINAGE STRUCTURE DESIGN SPECIAL EACH 2$1,750.00$3,500.00$2,675.21$5,350.42$1,150.00$2,300.00$2,000.00$4,000.0059 2506.516 CASTING ASSEMBLY EACH 2$900.00$1,800.00$615.30$1,230.60$700.00$1,400.00$1,000.00$2,000.0060 2506.521 INSTALL CASTING EACH 6$350.00$2,100.00$374.53$2,247.18$300.00$1,800.00$650.00$3,900.0061 2521.501 4" CONCRETE WALK S F 8620$5.00$43,100.00$4.98$42,927.60$5.00$43,100.00$4.00$34,480.0062 2521.501 6" CONCRETE WALK S F 2107$8.00$16,856.00$7.87$16,582.09$7.00$14,749.00$9.00$18,963.0063 2521.511 3" BITUMINOUS WALK S F 3491$3.50$12,218.50$1.93$6,737.63$2.60$9,076.60$2.25$7,854.7564 2531.501 CONCRETE CURB & GUTTER DESIGN B618 L F 879$28.00$24,612.00$29.43$25,868.97$34.50$30,325.50$23.00$20,217.0065 2531.507 6" CONCRETE DRIVEWAY PAVEMENT S Y 211$65.00$13,715.00$66.34$13,997.74$65.00$13,715.00$80.00$16,880.0066 2531.618 TRUNCATED DOMES S F 169$52.00$8,788.00$64.20$10,849.80$39.00$6,591.00$40.00$6,760.0067 2540.602 INSTALL MAIL BOX SUPPORT EACH 18$50.00$900.00$107.01$1,926.18$105.00$1,890.00$105.00$1,890.0068 2540.604 INSTALL LANDSCAPE ROCK S Y 15$20.00$300.00$53.50$802.50$26.00$390.00$120.00$1,800.0069 2540.618 INSTALL BRICK PAVERS S F 11$10.00$110.00$32.11$353.21$35.00$385.00$55.00$605.0070 2545.515 LIGHT FOUNDATION DESIGN P MOD EACH 2$900.00$1,800.00$3,108.80$6,217.60$2,715.00$5,430.00$2,700.00$5,400.0071 2545.602 INSTALL LIGHTING UNIT EACH 2$1,200.00$2,400.00$1,912.64$3,825.28$1,675.00$3,350.00$1,700.00$3,400.0072 2563.601 TRAFFIC CONTROL LS 1$5,000.00$5,000.00$3,477.78$3,477.78$9,000.00$9,000.00$36,983.24$36,983.2473 2564.531 SIGN PANELS TYPE C S F 44.5$40.00$1,780.00$42.81$1,905.05$45.00$2,002.50$42.00$1,869.0074 2564.537 INSTALL SIGN TYPE C EACH 10$150.00$1,500.00$107.01$1,070.10$105.00$1,050.00$105.00$1,050.0075 2564.537 INSTALL SIGN TYPE SPECIAL EACH 2$175.00$350.00$133.76$267.52$135.00$270.00$135.00$270.0076 2565.616 PEDESTRIAN CROSSWALK FLASHER SYSTEM SYS 1$20,000.00$20,000.00$12,922.78$12,922.78$13,000.00$13,000.00$15,000.00$15,000.0077 2571.502 DECIDUOUS TREE 3" CAL B&B TREE 3$1,100.00$3,300.00$695.56$2,086.68$1,000.00$3,000.00$475.00$1,425.0078 2572.505 PRUNE TREES HOUR 20$300.00$6,000.00$214.02$4,280.40$300.00$6,000.00$185.00$3,700.0079 2573.502 SILT FENCE, TYPE MS L F 3249$2.40$7,797.60$1.87$6,075.63$2.45$7,960.05$4.00$12,996.003 Project: 01928-92 - Safe Routes to School (144th Street) Engineers Estimate Max Steininger, Inc. Pember Companies, Inc. McNamaraContracting, Inc. Line No. Item Units QuantityUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal PriceUnit PriceTotal Price80 2573.530 STORM DRAIN INLET PROTECTION EACH 10$250.00$2,500.00$125.00$1,250.00$100.00$1,000.00$300.00$3,000.0081 2573.533 SEDIMENT CONTROL LOG TYPE WOOD FIBER L F 1835$5.00$9,175.00$3.80$6,973.00$2.90$5,321.50$6.00$11,010.0082 2574.525 BOULEVARD TOPSOIL BORROW C Y 60$50.00$3,000.00$49.66$2,979.60$35.00$2,100.00$42.00$2,520.0083 2575.505 SODDING TYPE LAWN S Y 2925$6.50$19,012.50$5.89$17,228.25$12.00$35,100.00$5.00$14,625.0084 2575.571 RAPID STABILIZATION METHOD 3 MGAL 3.9$600.00$2,340.00$428.03$1,669.32$590.00$2,301.00$550.00$2,145.0085 2582.503 CROSSWALK PREF THERMO S F 311$14.00$4,354.00$17.61$5,476.71$15.60$4,851.60$16.00$4,976.00Total Base Bid: $469,711.70 $450,549.57 $465,365.50 $469,999.99 Total Base Bid: $469,711.70 $450,549.57 $465,365.50 $469,999.99 Totals for Project 01928-92 $469,711.70 $450,549.57 $465,365.50 $469,999.99 % of Estimate for Project 01928-92 -4.08% -0.93% 0.06%I hereby certify that this is an exact reproduction of bids received.Certified By: License No. ate: 4