Loading...
HomeMy WebLinkAbout8.a. City Projects UpdateCity Project NumberProject NameCouncil Authorizes Plans/SpecsPublic HearingCouncil Receives Plans/Specs Authorize Ad For BidOpen BidsAward ContractStart DateAssessment HearingContractorContract AmountPayments To Date% CompleteSummary416 Well 16 10/01/13 N/A 11/18/14 02/27/15 03/17/15 05/26/15 N/AE.H. Renner & Sons, Inc.$433,105 $380,658 88% Drilling of the production well is complete. Well house design is underway, with construction scheduled for 2017.447145th Street Pedestrian Improvements at RR Crossing01/02/13 N/A N/AUPRR, CPRR, TBDEasement Agreement recently signed by Canadian Pacific. Agreement already in place with Union Pacific. Railroad work for UP will begin soon. An agreement with CP for the track extensions can be established now that the easement agreement has been executed. Upon execution of the agreement with CP for the track extensions, work will begin. Sidewalk work will begin after railroad work.453Danbury Way Reconstruction07/21/15 07/21/15 01/19/16 02/19/16 04/19/16 June 2016 04/19/16McNamara Contracting$1,234,504 $1,143,634 93% Project is substantially complete. Punch list items remain.464 Bella Vista 3rd N/A N/A 08/03/15 N/A SR Weidema Project is substantially complete. Punch list items remain.465132nd Street West ImprovementsN/ACouncil received the feasibility report and assessment agreement on October 6, 2015. This project is on hold until the status of the Dunmore project is determined.466Horseshoe Lake Lift Station05/05/15 N/A 08/18/15 09/04/15 09/15/15 10/19/15 N/ARyan Contracting$656,571 $651,571 99% Project is substantially complete. Lift station is online and running. Punch list items remain.467Dunmore 1st AdditionN/AThis development includes 30 single-family homes by developer Copper Creek. Copper Creek is expected to administer the contract privately, but the project is temporarily on hold.468Prestwick Place 12thN/A N/A N/ADouglas Kerr UndergroundProject is substantially complete. Punch list items remain.469 Bella Vista 4th N/A N/A N/A SR Weidema Installation of wear course paving remain. 473Prestwick Place 13thN/A N/A N/AThis development includes 28 single-family homes by developer KRB Development I, Inc. The developer will administer the contract privately. Construction is underway. Utilities, curb, and base course paving are expected to be complete by Nov 1. Sidewalks and wear course will be completed Spring 2017. 474 Greystone 5th N/A N/A N/AThis development includes 23 single-family homes by developer CalAtlantic Homes (formerly Ryland Homes). The developer will administer the contract privately. Final plat approval is expected in October, 2016. ENG-180Safe Routes to School10/20/15 04/05/16 06/21/16 08/02/16August 2016Max Steininger, Inc.$450,550 $234,358 52% Project is substantially complete. Punch list items remain.ENG-181Wells 4 & 5 Sealing, New Observation WellN/A 09/01/15 09/29/15 11/17/15 On Hold N/AKeys Well Drilling$39,250 $29,331 75%Well 4 has been converted to an observation well. Site restoraion remains. Well 5 has been drilled out, ready to be sealed in the future. Site restoration remains. ENG-183East Side Utility StudyN/A N/A N/A 11/12/15 N/A 11/23/15 N/AShort Elliot and Hendrickson (SEH)$35,505 $43,096 121%An RFP was distributed to three engineering firms to conduct a utility study for the area of Rosemount east of US52. SEH is the selected engineering consultant for the study. The study is necessary in order to provide adequate service for a possible large industrial site development, and to use the opportunity to prepare trunk utility facilities for additional future development.ENG-186 ENG-188Parking Lot MaintenanceN/A N/A N/A N/A N/ASpring 2017N/AThe Connemara Park and City Hall parking lots are scheduled for maintenance in 2016. In-house staff is working on the design for the Connemara Park lot; WSB is doing the design for the City Hall lot. Both projects will be bid together and will include curb & gutter enhancements/replacement, as well as full pavement replacement. Construction is expected in spring 2017.City Projects UpdatePRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEPRIVATEG:\ENGPROJ\Project Tracking\Project UpdateUpdated: 10/12/2016