HomeMy WebLinkAbout2.b. Capital Improvement PlanEXECUTIVE SUMMARY City Council Work Session: November 7, 2016 AGENDA ITEM: Capital Improvements Plan AGENDA SECTION: Discussion PREPARED BY: Dwight Johnson, City Administrator AGENDA NO. 2.b. ATTACHMENTS: 10 year CIP APPROVED BY: ddj RECOMMENDED ACTION: Review and provide direction to staff BACKGROUND Each year, the City reviews and updates its 10 year Capital Improvements Plan (CIP). There are three major capital improvement funds in addition to the Utility funds: the Street CIP, the Equipment CIP, and the Building and Facilities CIP. After initial review and direction on the proposed CIP, it should be reviewed again by the Parks and Recreation Commission and the Planning Commission before it is brought back to the Council for formal action in December. DISCUSSION OF SIGNIFICANT UPDATES Most of the significant updates for the CIP update involve revisions in planned parks and recreation projects, City buildings and facilities, major road improvements, and utility projects. These changes are discussed separately below. Parks and Recreation Projects The City held a referendum for parks improvements including a new indoor ice sheet in May, 2016 which did not pass. Staff believes that a new sheet of ice cannot be accomplished without either a major partnership with one or more other entities and/or bonding and is therefore outside of the scope of this CIP update which focuses on the allocation of existing revenues. After several meetings with our athletic associations and the Park and Recreation Commission, the following major projects are proposed for the next few years in the Building and Facilities CIP fund: •2017: Restoration of Carroll’s Woods $200,000 •2017-2018: Completion of UMore ballfield complex except for the large field. •2020-2021: Completion of Flint Hills fields •2022: Central Park improvements Other projects proposed include new splash pad play features ($12,000) in 2017, dugout covers for UMore and Erickson Parks ($70,000) in 2018, and baseline fencing for three fields ($30,000) in 2019. 2 City Buildings and Facilities For the first time in a number of years, it is proposed that $1,000,000 be allocated in 2017 for improvements in core City facilities including Public Works, Police and City Hall spaces. Staff believes that we are quickly approaching or at our capacity in all three facilities. Future strategies could include: 1. A series of relatively small improvements to each space to buy time, perhaps up to five years. 2. Plan for one or more major new facilities such as a new Police station, a new City Hall, or a new Public Works campus. 3. Build an addition on to City Hall over the top of the police garage to add office and conference room space (first proposed in the early 2000’s). *approximate 3000 square foot addition. The $1,000,000 allocation could be enough for either item 1 or item 3, or provide a start on planning for item 2 facilities, or some combination of strategies to be determined. Some short term needs that could be met through item 1 or item 3 include: Public Works : a wash bay, a clean out area, a salt and brine shed, and additional fencing/security. Police : Larger spaces for evidence room and crime lab, more interview rooms, larger briefing room, larger Women’s locker space, larger lobby area and more office spaces. * Some of these needs could be met by reconfiguring existing spaces. City Hall: large conference room, several small conference rooms, and more office spaces/work stations. *Some of the meeting room spaces could be shared between Police, City Hall, and City Council needs. Major Road Improvements Staff has reviewed our Minnesota State Aid funds and identified the priority projects as follows: 2017: County Road 42/Highway 52 interchange. 2018: McAndrews improvements including turn lanes and a possible underpass for the regional trail at Dodd Road. Federal funds have been received for a part of this project. 2018: Bonaire Path from Akron Ave. east across the RR tracks, including Quiet Zone improvements. Improvement will serve the city park, new development and provide a quiet zone extension. 2020: Biscayne from Boulder Trail south to County 46. UMore Park pays half of the amount. 2022: County Road 73 from Bonaire Path to north City limit. Utility Projects Some proposed utility projects in the next several years include: 2017: Keegan Lake flood control project. 2019: Possible water storage and treatment plan facilities. 2022: Well #17 construction. RECOMMENDATION The Council should review the proposed projects, direct staff on any changes and to proceed with further review by the Parks and Recreation Commission and the Planning Commission before taking final action. 1 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2017 1 Replace Ice Edger Arena 6,000 (1)6,000 2017 2 Restroom Rehab - Upper Arena 30,000 (1)30,000 2017 3 PC Workstation Upgrades (From 2012) (Police, Fire, P.W.)Finance 69,000 69,000 2017 4 Technology Upgrades Station #1 (New)Fire 10,000 10,000 2017 5 Hose Truck (Replace 1-Ton Truck) (New)Fire 55,000 55,000 2017 6 City-Wide Software Gen'l. Govt.25,000 25,000 2017 7 Business Park Sign Gen'l. Govt.25,000 25,000 2017 8 Indoor Recreational Facilities Gen'l. Govt.500,000 500,000 2017 9 City Facilities Improvements Gen'l. Govt.1,000,000 1,000,000 2017 10 Parks Master Plan Update Park & Rec 20,000 20,000 2017 11 Dunmore Park Development Park & Rec 150,000 150,000 2017 12 Horsehoe Lake Park - Phase 1 Park & Rec 200,000 200,000 2017 13 Greystone Park Development Park & Rec 500,000 500,000 2017 14 Additional Splash Pad Features Park & Rec 12,000 12,000 2017 15 Carroll's Woods Master Plan & Restoration Park & Rec 210,000 210,000 2017 16 UMore Ball Field Improvements - Phase 1 Park & Rec 900,000 900,000 2017 17 Replace Police Portable Radio Batteries (New)Police 4,500 4,500 2017 18 Body Cameras Police 14,000 10,000 (2)24,000 2017 19 Portable Alarm Replacements Police 15,000 15,000 2017 20 Squad Set Up and Equipment Installation Police 20,000 20,000 2017 21 Replace Squad Laptops (5) / Printers / Netmotion (2019 Combined)Police 70,000 70,000 2017 22 2 Squads (Sell Back 2 - #3560 & #3570)Police 64,000 18,000 (3)82,000 2017 23 PW Building Addition Lease/Purchase (Year 19 of 20)Pub Works 24,000 10,000 10,000 44,000 2017 24 Pedestrian Improvements Program Pub Works 125,000 125,000 2017 25 PMP (Shannon Hills B, Shannon Parkway A)Pub Works 944,367 83,137 1,027,504 2017 26 County Road 38 - CSAH 31 to TH 3 (ROW Costs) Pub Works 100,000 (4)100,000 2017 27 Bonaire Path - Akron Avenue to Greystone (with Quiet Zone)Pub Works 200,000 (5)200,000 2017 28 CSAH 42 Bridge at TH 52 (Includes Watermain Extension)Pub Works 1,305,000 800,000 (6)2,105,000 2017 29 Keegan Lake Drainage Improvements (New)Pub Works 118,750 356,250 475,000 2017 30 Cartegraph OMS Implementation & Licensing (New)Pub Works 42,900 10,700 10,700 10,700 75,000 2017 31 6" Trash Pump (Replace #8088) (Purchased 1989)Pub Works 7,000 7,000 8,000 22,000 2017 32 Dump & Clean Station for Vactor / Mowers (New)Pub Works 40,000 40,000 2017 33 Broom Attach for #8071 & #8072 (Replace #0146) (1995) (New)Pub Works 5,000 5,000 2017 34 Paint Mixer Pub Works 12,000 12,000 2017 35 RTV Kubota (Replace #8401) (Purchased 2004)Pub Works 18,000 2,000 (7)20,000 2017 36 Ford Focus - Inspections (Replace #8612) (2000 Vehicle)Pub Works 23,000 2,000 (7)25,000 2017 37 Minivan (Replace #8621) (1998 Vehicle)Pub Works 28,500 1,500 (7)30,000 2017 38 1-Ton Pickup (Replace #8315) (2006 Vehicle)Pub Works 31,000 4,000 (7)35,000 2017 39 1-Ton Pickup (Replace #8333) (2003 Vehicle)Pub Works 10,000 11,000 10,000 4,000 (7)35,000 2017 40 JD Tractor & Broom Attachment (Replace #8408 & 0139) (2002)Pub Works 65,700 16,000 (7)81,700 2017 41 Sweeper (Replace #8444) (Purchased 2005)Pub Works 99,000 99,000 12,000 (7)210,000 2017 42 Grader (Replace #8413 & #0192) (Purchased 2001)Pub Works 260,000 40,000 (7)300,000 2,671,000 1,069,367 931,600 83,137 870,000 1,605,000 800,000 0 118,750 37,700 38,700 523,950 0 145,500 8,894,704 Total CIP Funding Requirements - Year 2017 $4,671,967 $0 (1)Ice Edger & Upper Restroom Rehab funding comes from Arena Fund operations/reserves. (2)Other funding for Body Cameras comes from assigned funds. (3)Other funding for Squad Cars comes from auction sales of old vehicles. (4)Other funding for County Road 38 project for County's share and the City of Apple Valley's share of project are not included. Costs are for Right of Way purchases and are Rosemount's share only. (5) Other funding for Bonaire Path project are not included. Costs are Rosemount's share only. (6)Other funding for CSAH 42 Bridge at TH 52 project for County State Aid share and Federal Funding share of project are not included. Construction costs are Rosemount's share only. (7) Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2017 is $24,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2017 is $811,400. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives. Total Equipment CIP levy for 2017 is $580,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 2 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2018 1 Restroom Rehab - Lower Arena 25,000 (1)25,000 2018 2 Paint Arena Ceiling Arena 85,000 (1)85,000 2018 3 Replace Council & Staff Tablets (New)Finance 12,500 12,500 2018 4 City-Wide Software Gen'l. Govt.25,000 25,000 2018 5 Covered Dugouts at UMore Ball Field & Erickson Park Park & Rec 70,000 70,000 2018 6 UMore Ball Field Improvements - Phase 2 Park & Rec 900,000 900,000 2018 7 Koch Trail Restoration Park & Rec 50,000 (2)50,000 2018 8 Trail Plans & Design Park & Rec 30,000 30,000 2018 9 Horsehoe Lake Park - Phase 1 Park & Rec 300,000 300,000 2018 10 Replace Speed Trailers Police 15,000 15,000 2018 11 Evidence Processing Room Equipment Upgrades (Software)Police 30,000 30,000 2018 12 Squad Set Up and Equipment Installation Police 39,000 39,000 2018 13 Replace Squad Mobile Radios Police 54,000 54,000 2018 14 3 Squads (Sell Back 3 - #3520, #3580 & #35120)Police 96,000 18,000 (3)114,000 2018 15 PW Building Addition Lease/Purchase (Year 20 of 20)Pub Works 24,000 10,000 10,000 44,000 2018 16 Pedestrian Improvements Program Pub Works 125,000 125,000 2018 17 PMP (Motz, Biscayne Pointe A, Biscayne Avenue C)Pub Works 730,660 243,741 974,401 2018 18 County Road 38 - CSAH 31 to TH 3 (Construction) Pub Works 800,000 (4)800,000 2018 19 Bonaire Path - Akron Avenue to Greystone (with Quiet Zone)Pub Works 2,000,000 (5)2,000,000 2018 20 Blower Attach for #8071 & #8072 (Replace #0119) (2001)(New)Pub Works 7,500 7,500 2018 21 1/2-Ton Ex-Cab Pickup (Replace #8329) (2006 Vehicle)Pub Works 29,000 6,000 (6)35,000 2018 22 1-Ton Pickup w/Dump (Replace #8310) (2003 Vehicle)Pub Works 52,500 7,500 (6)60,000 2018 23 Groundsmaster Mower (Replace #8068) (Purchased 2008)Pub Works 77,000 8,000 (6)85,000 2018 24 Sidewalk Trac & Blower (Replace #8417 & 0121) (Purchased 2003)Pub Works 95,000 15,000 (6)110,000 2018 25 Single-Axle Dump Truck (Replace #8436) (2005 Vehicle)Pub Works 140,000 35,000 (6)175,000 2018 26 Sno Go Blower (Replace #0130) (Purchased 1987)Pub Works 150,000 150,000 2018 27 1-Ton Pickup (Replace #8345) (2007 Vehicle)Pub Works 48,000 7,000 (6)55,000 2018 28 Jetter (Replace #8445) (2006 Vehicle)Pub Works 92,500 92,500 25,000 (6)210,000 994,000 855,660 822,500 243,741 330,000 2,800,000 0 0 0 58,000 102,500 92,500 0 281,500 6,580,401 Total CIP Funding Requirements - Year 2018 $2,672,160 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Lower Restroom Rehab & Paint Arena Ceiling funding comes from Arena Fund operations/reserves. (2)Koch Trail Restoration funding will come from a grant. (3)Other funding for Squad Cars comes from auction sales of old vehicles. (4)Other funding for County Road 38 project for County's share and the City of Apple Valley's share of project are not included. Costs are for construction and are Rosemount's share only. (5)Other funding for Bonaire Path project are not included. Costs are Rosemount's share only. (6) Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2018 is $24,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2018 is $843,856. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives. Total Equipment CIP levy for 2018 is $600,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 3 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2019 1 Replace Chiller Barrel Arena 55,000 (1)55,000 2019 2 Replace Cooling Tower Arena 75,000 (1)75,000 2019 3 PC Workstation Upgrades (From 2014) (Admin, Park & Rec)Finance 83,000 83,000 2019 4 Replace Air Compressor @ Station #1 (New)Fire 60,000 60,000 2019 5 City-Wide Software Gen'l. Govt.25,000 25,000 2019 6 Baseline Fencing for 3 Fields Park & Rec 30,000 30,000 2019 7 Community Center / Armory Remodel Park & Rec 150,000 150,000 2019 8 Develop Park N-5 Park & Rec 200,000 200,000 2019 9 Squad Set Up and Equipment Installation Police 40,000 40,000 2019 10 3 Squads (Sell Back 3 - #3590, #35100 & #35110)Police 96,000 18,000 (2)114,000 2019 11 Replace Police Portable Radios (Encrypted)Police 138,000 138,000 2019 12 Pedestrian Improvements Program Pub Works 125,000 125,000 2019 13 PMP (O'Leary's A&B, Carrollton C, Oak Ridge Estates, 145th St. C)Pub Works 863,905 276,613 1,140,518 2019 14 Blower Attach for #8418 & #8420 (Replace #0123) (2008)(New)Pub Works 7,500 7,500 2019 15 Bobcat Trailer (Replace #0503) (Purchased 1999)Pub Works 10,000 10,000 2019 16 1/2-Ton Ex-Cab Pickup (Replace #8346) (2006 Vehicle)Pub Works 29,000 6,000 (3)35,000 2019 17 Full Size Van - Park & Rec (Replace #8601) (2003 Vehicle)Pub Works 31,000 4,000 (3)35,000 2019 18 Bobcat (Replace #8418) (2008 Vehicle)Pub Works 45,000 5,000 (3)50,000 2019 19 Bobcat (Replace #8420) (2008 Vehicle)Pub Works 45,000 5,000 (3)50,000 2019 20 Pavement Roller (Replace #8129) (Purchased 2003)Pub Works 48,000 2,000 (3)50,000 2019 21 1-Ton Pickup w/Dump (Replace #8340) (2006 Vehicle)Pub Works 54,000 6,000 (3)60,000 2019 22 Sweeper (Replace #8443) (Purchased 2007)Pub Works 100,000 100,000 12,000 (3)212,000 2019 23 6" Trash Pump (Replace #8089) (Purchased 1995)Pub Works 7,000 7,000 8,000 22,000 2019 24 Generator (Replace #8057) (Purchased 1996)Pub Works 28,500 28,500 5,000 (3)62,000 2019 25 Utility Pickup w/Crane (Replace #8342) (2007 Vehicle)Pub Works 32,000 32,000 31,000 15,000 (3)110,000 2019 26 Water Storage Facility (New)Pub Works 5,000,000 (4)5,000,000 2019 27 Water Treatment Facility Pub Works 8,500,000 8,500,000 (4)17,000,000 180,000 988,905 811,500 276,613 200,000 0 13,500,000 0 0 8,567,500 67,500 139,000 0 208,000 24,939,018 Total CIP Funding Requirements - Year 2019 $1,980,405 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Chiller Barrel & Cooler Tower funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. (4)Funding for the Water Storage Facility and the Water Treatment Facility will come from a Water Revenue bond issue. Total Building CIP levy for 2019 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2019 is $877,610. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2019 is $620,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 4 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2020 1 Scoreboards Arena 40,000 (1)40,000 2020 2 Phone Server Replacements (From 2015)Finance 20,000 20,000 2020 3 Replace Fire Department Mobile Computers (From 2016)Finance 35,000 35,000 2020 4 PC File Server Replacements & Backup System (From 2015)Finance 120,000 120,000 2020 5 Aerial Platform Truck Replacement (Purchased in 2020)Fire (#)0 2020 6 City-Wide Software Gen'l. Govt.25,000 25,000 2020 7 Flint Hills Field Improvements - Phase 1 Park & Rec 2,100,000 2,100,000 2020 8 Replace 1/2 of AED's (5)Police 8,000 8,000 2020 9 Squad Set Up and Equipment Installation Police 52,000 52,000 2020 10 4 Squads (Sell Back 4 - #3540, #3550, #35150 & #35170)Police 128,000 24,000 (2)152,000 2020 11 Pedestrian Improvements Program Pub Works 125,000 125,000 2020 12 PMP (West Ridge A, Chippendale A)Pub Works 621,041 98,875 719,916 2020 13 Biscayne Avenue - Boulder Trail to CR 46 (1/2 from U of M)Pub Works 2,000,000 (3)2,000,000 2020 14 Ford Ranger - Inspections (Replace #8615) (2008 Vehicle)Pub Works 26,500 3,500 (4)30,000 2020 15 Single-Axle Dump Truck (Replace #8430) (2009 Vehicle)Pub Works 145,000 35,000 (4)180,000 2,100,000 746,041 559,500 98,875 0 2,000,000 0 0 0 0 0 0 0 102,500 5,606,916 Total CIP Funding Requirements - Year 2020 $3,405,541 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Scoreboards funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Biscayne Avenue project for the University of Minnesota are not included. Costs are Rosemount's share only. (The University needs a 2-year notice prior to project start) (4)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2020 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2020 is $912,715. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2020 is $640,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 5 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2021 1 Arena Refrigeration / Rink System Arena 375,000 (1)375,000 2021 2 Aerial Platform Truck Replacement (Year 1 of 5)Fire 252,000 252,000 2021 3 City-Wide Software Gen'l. Govt.25,000 25,000 2021 4 Flint Hills Field Improvements - Phase 2 Park & Rec 600,000 600,000 2021 5 Replace Less Lethal Weapons Police 6,000 6,000 2021 6 Squad Set Up and Equipment Installation Police 45,000 45,000 2021 7 Replace Squad Video System Police 120,000 120,000 2021 8 3 Squads (Sell Back 3 - #3530, #3570 & #35140)Police 100,000 18,000 (2)118,000 2021 9 Pedestrian Improvements Program Pub Works 125,000 125,000 2021 10 PMP (West Ridge C, Shannon Pond, Dodd, Biscayne B, >>)Pub Works 1,437,990 383,921 1,821,911 2021 11 Shop Hoist (Replace #0002) (Purchased 2006)Pub Works 55,000 5,000 (3)60,000 PMP (Cont.-Rosemount Hills B, Jay Simons) 600,000 1,562,990 603,000 383,921 0 0 0 0 0 0 0 0 0 398,000 3,547,911 Total CIP Funding Requirements - Year 2021 $2,765,990 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Arena Refrigeration / Rink System funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2021 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2021 is $949,223. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2021 is $660,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 6 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2022 1 Replace Zamboni Batteries Arena 15,000 (1)15,000 2022 2 Replace Compressors Arena 70,000 (1)70,000 2022 3 PC Workstation Upgrades (From 2017) (Police, Fire, P.W.)Finance 70,000 70,000 2022 4 Aerial Platform Truck Replacement (Year 2 of 5)Fire 252,000 252,000 2022 5 City-Wide Software Gen'l. Govt.25,000 25,000 2022 4 Central Park Improvements Park & Rec 1,200,000 1,200,000 2022 6 Replace Police Portable Radio Batteries Police 5,000 5,000 2022 7 Squad Set Up and Equipment Installation Police 45,000 45,000 2022 8 Replace Squad Laptops (5) / Printers / Netmotion Police 55,000 55,000 2022 9 3 Squads (Sell Back 3 - #3520, #3560 & #3580)Police 100,000 18,000 (2)118,000 2022 10 Pedestrian Improvements Program Pub Works 125,000 125,000 2022 11 PMP (Wensmann A/B/C, December Trail, Stonebridge, >>)Pub Works 2,408,824 752,215 3,161,039 2022 12 County Road 73 - Bonaire Path to IGH (Construction) Pub Works 2,500,000 (3)2,500,000 2022 13 Blower Attach for #8409 (Replace #0122) (2001) (New)Pub Works 15,000 15,000 2022 14 Crash Attenuator (Replace #0049) (Purchased 2007)Pub Works 20,000 20,000 2022 15 Well #17 Construction Pub Works 1,500,000 (4)1,500,000 PMP (Cont.-Deepwoods, White Lake Acres) 1,200,000 2,533,824 587,000 752,215 0 2,500,000 1,500,000 0 0 0 0 0 0 103,000 9,176,039 Total CIP Funding Requirements - Year 2022 $4,320,824 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Zamboni Battery Replacements & Compressors funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for County Road 73 project for County's share and the City of Inver Grove Heights' share of project are not included. Costs are for construction and are Rosemount's share only. (4)Funding for Well #17 will come from a Water Revenue bond issue. Total Building CIP levy for 2022 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2022 is $987,192. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2022 is $680,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 7 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2023 1 Replace Ice Edger Arena 8,000 (1)8,000 2023 2 Replace Skate Tile Arena 90,000 (1)90,000 2023 3 Aerial Platform Truck Replacement (Year 3 of 5)Fire 252,000 252,000 2023 4 City-Wide Software Gen'l. Govt.25,000 25,000 2023 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2023 6 3 Squads (Sell Back 2 - #35100 & #35110 & 1 New Addition)Police 105,000 12,000 (2)117,000 2023 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2023 8 PMP (Geronime Pond, Town Center, Cameo & 143rd, McNamara)Pub Works 811,581 225,016 1,036,597 2023 9 Aerator (Replace #0157) (Purchased 2013)Pub Works 18,000 2,000 (3)20,000 2023 10 1-Ton Pickup Extended Cab (Replace #8330) (2011 Vehicle)Pub Works 30,000 10,000 (3)40,000 2023 11 1-Ton Pickup (Replace #8341) (2011 Vehicle)Pub Works 30,000 10,000 (3)40,000 2023 12 Generator (Replace #8059) (Purchased 2003)Pub Works 35,000 35,000 5,000 (3)75,000 0 936,581 505,000 225,016 0 0 0 0 0 35,000 35,000 0 0 137,000 1,873,597 Total CIP Funding Requirements - Year 2023 $1,441,581 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Edger & Skate Tile funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2023 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2023 is $1,026,680. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2023 is $700,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 8 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2024 1 Replace Skate Sharpener Arena 20,000 (1)20,000 2024 2 Replace Fire Department Mobile Computers (From 2020)Finance 35,000 35,000 2024 3 PC Workstation Upgrades (From 2019) (Admin, Park & Rec)Finance 70,000 70,000 2024 4 Aerial Platform Truck Replacement (Year 4 of 5)Fire 252,000 252,000 2024 5 City-Wide Software Gen'l. Govt.25,000 25,000 2024 6 Squad Set Up and Equipment Installation Police 45,000 45,000 2024 7 3 Squads (Sell Back 3 - #3510, #3540 & #3590)Police 105,000 18,000 (2)123,000 2024 8 Pedestrian Improvements Program Pub Works 125,000 125,000 2024 9 PMP (Boomfield B, O'Leary's Hills C, Connemara A, >>)Pub Works 1,222,832 305,817 1,528,649 2024 10 Groundsmaster Mower (Replace #8066) (Purchased 2015)Pub Works 87,000 8,000 (3)95,000 2024 11 Groundsmaster Mower (Replace #8073) (Purchased 2015)Pub Works 87,000 8,000 (3)95,000 2024 12 Single-Axle Dump Truck (Replace #8432) (2012 Vehicle)Pub Works 151,000 39,000 (3)190,000 PMP (Cont.-Auburn Ave., 145th St. A) 0 1,347,832 857,000 305,817 0 0 0 0 0 0 0 0 0 93,000 2,603,649 Total CIP Funding Requirements - Year 2024 $2,204,832 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Skate Sharpener funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2024 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2024 is $1,067,747. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2024 is $720,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 9 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2025 1 Phone Server Replacements (From 2020)Finance 20,000 20,000 2025 2 PC File Server Replacements & Backup System (From 2020)Finance 120,000 120,000 2025 3 Aerial Platform Truck Replacement (Year 5 of 5)Fire 252,000 252,000 2025 4 City-Wide Software Gen'l. Govt.25,000 25,000 2025 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2025 6 3 Squads (Sell Back 3 - #3570, 35140 & #35170)Police 110,000 18,000 (2)128,000 2025 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2025 8 PMP (Bloomfield A, West Ridge B, Country Hills A, >>)Pub Works 1,044,591 351,968 1,396,559 2025 9 Caravan - Parks (Replace #8603) (2013 Vehicle)Pub Works 31,500 3,500 (3)35,000 2025 10 Water Truck (Replace #8431) (2013 Vehicle)Pub Works 180,000 20,000 (3)200,000 2025 11 Dump Tandem (Replace #8434) (2013 Vehicle)Pub Works 195,000 35,000 (3)230,000 2025 12 Loader, Wing & Plow (Replace #8419) (Purchased 2005)Pub Works 275,000 50,000 (3)325,000 PMP (Cont.-Conley, Chippendale B) 0 1,169,591 1,253,500 351,968 0 0 0 0 0 0 0 0 0 126,500 2,901,559 Total CIP Funding Requirements - Year 2025 $2,423,091 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Arena item funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2025 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2025 is $1,110,457. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2025 is $740,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 10 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2026 1 Replace Ice Resurfacer Arena 120,000 (1)120,000 2026 2 Phone Server Replacements (From 2020)Finance 20,000 20,000 2026 3 PC File Server Replacements & Backup System (From 2020)Finance 120,000 120,000 2026 4 City-Wide Software Gen'l. Govt.25,000 25,000 2026 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2026 6 3 Squads (Sell Back 3 - #3530, 3550 & #3580)Police 110,000 18,000 (2)128,000 2026 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2026 8 PMP (Country Hills B, Hawkins Pond, Broback Park, >>)Pub Works 883,238 318,103 1,201,341 2026 9 John Deere Trailer (Replace #0525) (Purchased 2010)Pub Works 12,000 12,000 2026 10 Wood Chipper (Replace #8161) (Purchased 2014)Pub Works 45,000 5,000 (3)50,000 2026 11 Groundsmaster Mower (Replace #8068) (Purchased 2017)Pub Works 85,000 10,000 (3)95,000 2026 12 JD Tractor & Blower (Replace #8406 & #0128) (2006 & 2011)Pub Works 108,000 7,000 (3)115,000 PMP (Cont.-Biscayne A, Autumn Path) 0 1,008,238 570,000 318,103 0 0 0 0 0 0 0 0 0 160,000 2,056,341 Total CIP Funding Requirements - Year 2026 $1,578,238 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Resurfacer funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2026 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2026 is $1,154,875. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2026 is $760,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 11 of 11 MSA 11/4/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost Future 1 Public Works / City Hall Building Expansion / Police Council 4,000,000 (1)4,000,000 Future 2 Tender Truck (Addition) Fire 180,000 (2)180,000 Future 3 Engine Truck (Addition) Fire 700,000 (3)700,000 Future 4 Add Fire Station #3 (Same time as additional Engine Truck)Fire (3) Future 5 ADA Compliant Upgrades Study Park & Rec 20,000 20,000 Future 6 Erickson Park Tennis Courts - Phase 2 Park & Rec 350,000 350,000 Future 7 Community Center Covered Walk Park & Rec 175,000 175,000 Future 8 Splash Pad - Phase 2 Park & Rec 1,000,000 1,000,000 Future 9 Umore Ball Fields - Phase 2 Park & Rec 2,600,000 2,600,000 Future 10 Flint Hills Athletic Fields Improvements - Phases 2 & 3 Park & Rec 3,200,000 3,200,000 Future 11 TH 3 Aesthetic Improvements Pub Works 448,500 (5)448,500 Future 12 North Central Sanitary Sewer Extension Pub Works (6) Future 13 Street Construction - Boulder Avenue Extension Pub Works 3,000,000 (7)3,000,000 Future 14 Shannon Pond Outlet Pub Works (8) Future 15 Gravel Road Improvements Pub Works (8) 2027 16 1/2-Ton Pickup (Replace #8307) (2015 Vehicle)Pub Works 31,000 4,000 (9)35,000 2027 17 1/2-Ton Pickup (Replace #8335) (2015 Vehicle)Pub Works 31,000 4,000 (9)35,000 2027 18 1-Ton Pickup (Replace #8331) (2015 Vehicle)Pub Works 34,000 6,000 (9)40,000 2027 19 1-Ton Pickup (Replace #8332) (2015 Vehicle)Pub Works 35,000 5,000 (9)40,000 2027 20 Dump Single (Replace #8437) (2014 Vehicle)Pub Works 160,000 40,000 (9)200,000 Future 21 Soccer Goal Trailer (Replace #0501) (Purchased 1980)Pub Works 12,000 12,000 Future 22 Hose Trailer (Replace #0502) (Purchased 1990)Pub Works 12,000 12,000 Future 23 Barricade Trailer (Replace #0510) (Purchased 1986)Pub Works 12,000 12,000 Future 24 Hose Trailer (Replace #0517) (Purchased 1995)Pub Works 12,000 12,000 Future 25 Striper Trailer (Replace #0518) (Purchased 1994)Pub Works 12,000 12,000 Future 26 Easement Trailer (Replace #0521) (Purchased 2003)Pub Works 12,000 12,000 Future 27 Akron Avenue South of County Road 42 Pub Works 1,250,000 1,250,000 6,975,000 0 1,083,000 0 350,000 0 0 0 0 0 0 0 0 7,687,500 16,095,500 Total CIP Funding Requirements - Future Years $8,058,000 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Funding for the City Hall Expansion ($1,000,000) & PW Building Expansion ($3,000,000) will come from a general bond issue. (2)Funding and timing of purchase of Tender Truck (Addition) still to be determined. (3)Timing for Fire Station #3 and Additional Engine Truck still to be determined. (4)Other funding for Squad Cars comes from auction sales of old vehicles. (5)Other funding for TH 3 projects will come from grants or other incentives. (6)Future costs associated with the sanitary sewer will include extensive street reconstruction on the following streets: 124th St, 125th St, Blanca Ave W, 128th St, Bolivia Ave, 130th St W, Biscayne Ave, Bengal Ave, 129th St W, CR 38, 132nd Court and Bonnaire Path. Costs and funding are not available at this time. (7)Other funding for Boulder Avenue extension will come from a Port Authority bond issue. (8)Costs and funding are not available at this time. (9)Other funding for Public Works equipment comes from trade-in value of old vehicles. MEMORANDUM To: Dwight Johnson, City Administrator From: Dan Schultz, Parks and Recreation Director Date: October 18, 2016 Subject: Outdoor Facility Needs Staff recently met with representatives from the Rosemount Area Athletic Association (RAAA) and REV Soccer to discuss their outdoor facility needs. Listed below are the details about the input they provided to staff. RAAA RAAA uses facilities that are provided by the City of Rosemount, ISD 196, the City of Lakeville and the City of Apple Valley. Two key facility issues that were brought up by leadership at RAAA and were the quality and safety of facilities used by the association. RAAA has indicated that most of the facilities provided by the City of Rosemount are well kept and safe to play on. They have requested the City consider adding baseline fencing at Camfield, Twin Puddles, Kidder and Chippendale parks. The feedback that we received for each RAAA sport that uses our outdoor facilities is listed below: • In-House Baseball – They are currently at capacity for this program. They are looking to try and secure fields at Red Pine Elementary (ISD 196) for 2017. They have also requested 3 more fields with permanent base pegs as well. One with a base distance of 60 feet for 4th/5th graders, similar to Winds and two fields for 6th-8th grades with bases 75ft and pitching distance of 52 ft (mound preferred). These requests are based on program growth and trying to keep teams to a manageable size. • In-House Softball – They have enough fields but are facing some quality issues at ISD 196 facilities. The field at Rosemount Elementary is not used because of lack of maintenance by ISD 196. In-house softball is planning to have their older girl’s teams join the South Metro Slow pitch league this year as there aren't enough girls to keep it all in-house. They have requested a nicer field as they will be playing games against other cities. • Traveling Baseball – They have enough fields for the program, although at the 13 year old level only one field is available. They would like to see more batting cages and covered dugouts added to City of Rosemount parks. • Traveling Softball – They could use another field to practice on. They have enough fields for games. • In-House Football (grades 3-6) – Football currently has enough fields with the space the City provides at Shannon Park. • Lacrosse – Lacrosse is currently having challenges finding enough fields and also to find fields that allow for safe play because the sport needs several feet of clearance at the ends of the field to contain the small hard ball that is used. • In-House and Traveling Tennis – They are doing okay with facilities but the RHS tennis court complex went from 8 courts down to 7 with their recent reconstruction. • In-House Soccer – In-house soccer was able to secure enough fields for their program. REV SOCCER REV Soccer mainly uses fields provided by the City of Rosemount, City of Apple Valley, ISD 196 and the one field from the City of Eagan. Representatives from REV indicated that playability is a big factor in the ability to keep games happening as scheduled. They indicated that the conditions at the Flint Hills Athletic Complex are ideal because the fields drain so well after it rains. They typically do not have to cancel games because of field conditions at the Flint Hills Complex. • REV Soccer – They are currently finding enough facilities for their programs but are concerned they will not have enough fields for any future growth. Fields with lights are valuable because their older kids can play games late into the evening under the lights. REV Soccer is also very interested in an artificial turf field with lights. This type of facility would allow for expanded use in the spring, summer and fall seasons. Attached is a spreadsheet that shows the participation numbers by sport for RAAA. Also attached is a spreadsheet that identifies the participation numbers for REV Soccer. Staff Recommendation Staff is recommending that we continue to pursue the development of the four green fields at the Flint Hills Athletic Complex, two additional baseball/softball fields at UMore and the one large baseball field at UMore. Staff also recommends that we consider including athletic facilities in some our future neighborhood parks. As our community continues to grow, staff expects that RAAA and REV Soccer will see an increase in participation levels. The increase in participation numbers will require additional facilities. Listed below is a projection developed by staff for the future needs based on the recent participation trends of RAAA and REV Soccer. Type of Field/Range of Years 1 – 2 years 3 - 4 years 5 – 6 years Youth Baseball/Softball 1 2 1 Greenfield (soccer, lacrosse or football) 1 2 1 13 year old baseball field 1 2 0 Large baseball field 0 1 0 Please let me know if you have any questions regarding this memo. RAAA Participation Numbers Program 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 In-House Baseball 470 482 550 530 547 586 552 564 557 572 637 666 Traveling Baseball 144 167 196 205 205 191 227 259 246 286 237 251 In-House Softball 150 176 200 190 186 179 202 207 166 158 165 149 Traveling Softball 73 63 90 67 82 91 95 100 90 105 106 108 In-House Soccer 833 900 898 940 919 905 868 830 824 904 1,050 1,130 In-House Tennis 44 57 72 92 105 106 73 93 116 131 135 140 Traveling Tennis 36 35 42 45 43 46 53 54 42 38 36 53 Lacrosse - Summer ---139 230 198 250 234 198 250 376 318 Lacrosse - Spring -----88 164 124 107 129 97 79 Football (3 - 6 grade)247 254 264 284 270 298 274 334 303 263 249 244 Track 236 291 302 311 314 318 421 490 491 475 487 581 Cross Country (new in 201 ---------43 65 55 REV SOUTH Participation # REV Soccer South NA NA NA NA 755 791 833 902 932 1021 1,145 1,270 MEMORANDUM To: Dwight Johnson, City Administrator From: Dan Schultz, Parks and Recreation Director Date: November 2, 2016 Subject: Parks and Recreation Commission Priority Projects The Parks and Recreation Commission recently discussed future parks and recreation projects. Identified below is a draft list of projects that the Commission felt should be priorities for the City. They have not yet ranked these projects to identify the order in which they should be developed but plan to do so at their meeting on Monday, November 28, 2016. • Flint Hills Athletic Fields – Include 3 natural grass fields, 1 artificial turf field with lights, a track and dome, and pickle-ball courts. • UMore Ball Field Project – 2 youth fields and concession stand. • Central Park/Splash Pad – Plaza, fire pit and playground. • Skate Park Equipment Replacement – New pad and equipment. • Restore Natural Resources in Carroll’s Woods/Schwarz Pond Park – Develop a natural resources management plan and restore the natural resources/remove buckthorn. • Addition of a Full Size Indoor Ice Sheet – Develop a new full size ice sheet. Please let me know if you have any questions regarding this memo. MEMORANDUM TO: Dwight Johnson, City Administrator FROM: Mitchell Scott, Chief of Police SUBJECT: Police Facility Inclusion in Capital Improvement Plan DATE: December 15, 2015 As the City of Rosemount continues to grow, facility needs should be considered. The City has done an excellent job in the past with observing the needs of the residents with regards to Parks and Recreation, Fire Stations and water treatment needs. Taking into consideration the needs of the City and growth of the Police Department, the current Police Department has reached a threshold where a new facility is needed. As the City has continued to grow, so has the police force. In 1986 the City of Rosemount built the current City Hall with the Police Department attached on the lower level. The Police Department occupied approximately 1400 sq. ft. During that time the Police Department had 8 sworn officers and 1 records personnel. In 2001 the City completed a remodel of City Hall and the Police Department. The Police Department increased their square footage from approximately 1400 sq. ft. to approximately 7358 sq. ft. of office space. During that time the Police Department had 15 sworn officers, 3 records personnel and 1 community service officer. In 2015, to accommodate a more cohesive work space for patrol officers, a wall was knocked down; however, the Police Department did not gain any additional square footage. The Police Department’s current staffing consists of 23 sworn officers, 3 records personnel and 2 community service officers. We are still operating within the square footage of approximately 7358 sq. ft. that was established in 2001. Although space for staff is an important factor, it is not the only factor that has been taken into consideration with regards to the need for a new facility. In the following paragraphs I will discuss the issues and needs of areas within the Police Department. It has not been perceived that any one area has more importance than the other; they are all areas of concern. Parking Lot: As we have discussed in the past, staff is extremely concerned with the parking lot. With the addition of the splash pad, the amount of traffic during the summer months has increased drastically. Several times I have witnessed young children running to cars ahead of their parents. On one occasion an officer opened the garage door only to see a young child standing directly in front of the garage door area. While officers are always cautious when leaving the garage, some urgent calls require a more rapid response. It is our concern that a child may be struck by a squad car. The police garage entrance should be a secure area. Property Room (Evidence): Currently we are scrambling to find space for evidence. The property room is not large enough to handle what we are required by law to store as evidence. Utilizing fenced areas for long term storage is not a practical solution and could potentially result in challenges to evidence in criminal trials. A single secured room should be large enough to store all the evidence for now and into the future. Evidence for person crimes such as Criminal Sexual Conducts and Deaths must be kept in perpetuity or, if a suspect is convicted, through the end of their sentence. Evidence for other crimes must be held for the longer of 3 years or until the end of the sentence of any conviction. This problem will only increase as we continually take in evidence. In addition, during the course of investigations we conduct search warrants. At times the evidence collected from the search warrants can be overwhelming and require a secure storage area for larger items such as appliances, tools, and equipment (sometimes the content of an entire storage container or garage). We currently do not have a location to securely store large evidentiary items. The final issue regarding the property room would be ventilation. The property room is not vented properly and the odor of marijuana is sometimes overbearing as it seeps into other rooms. Crime Lab: The facility for processing physical evidence is not sufficient. Chemicals are often required in processing physical evidence and the lack of ventilation is an important factor. There is also a significant lack of work space as only 1 tech may work in this room at a time which causes issues when personnel are trying to process larger cases. There is also a lack of storage space for the processing equipment. Interview rooms: The amount of interview rooms we currently have is not sufficient for both secured (in custody persons) and non-secured (juveniles and investigative interviews). We have had multiple instances where we have more people to hold than current space allows. This can be a safety issue for the officers and the subjects and can expose the department to liability. We currently have 2 non-secured areas and 1 secured area. Handling more than 2 juveniles in custody for non-violent offenses requires leaving the juveniles in police vehicles. Having multiple secured suspects for an investigation is impossible if there are more than 3. We have had several cases where we need to take 4-5 people into custody for robberies or burglaries. In the last few years we have been faced with several major incidents with several individuals involved. Due to the lack of space, we were not able to isolate the individuals. Bigger Lobby: The current lobby is not adequate. It can become crowded very quickly especially when someone brings their family in to report a crime. Currently we only have one interview room in the lobby which often becomes an issue when we have multiple individuals wanting to speak with an officer or requesting paperwork. Officers often have no choice but to speak with someone in the lobby where other people may overhear personal issues of the person with whom they are speaking. Briefing room/ Emergency Operations Center: Our current briefing room, although it is one of the bigger rooms we have in the Police Department, is still small. We currently utilize this room for several things: equipment storage, officer mail, and briefings/conferences. Unfortunately the room cannot accommodate a large amount of people. This becomes an issue when we are conducting warrants within our city with other agencies. A briefing of assisting officers occurs before the execution of any search warrant. Due to the small size of this room, assisting officers often need to stand in the hallway to listen to the briefing. Also, if this room is being utilized for a conference, other personnel are forced to disturb the group if they are in need of supplies or equipment. In a new facility a much larger room would also be utilized for other functions, such as training and as an Emergency Operations Center. Locker Rooms: With our current staffing the locker rooms have reached their maximum and there is limited room. The females’ locker room is extremely tight and the ventilation is extremely poor. To quote an officer, “Due to the proximity of the locker rooms and evidence room, the smell constantly bleeds into our locker rooms. It can be a bit much at times, but you always know when someone has gotten a recent drug arrest.” Office Space: An argument could be made that an officer’s office is their squad car and I would not dispute this; however, I believe this would only apply to patrol officers. I would also state that it is not their entire office. With technology growing and the police vehicles losing space, we still need to provide a work area for patrol officers to safely write reports and conduct investigations. The space needed for the future must be addressed. With regards to the officers working investigations or other specialty assignments, we are currently out of space. With the current case loads and the trend of our investigation unit, I am anticipating the need for another investigator in 2017; unfortunately, we have no space for them. We have already combined office spaces where possible to accommodate our needs; our school resource officer and community resource officer share the same small office space. Unfortunately, due to several of the existing offices containing curved walls, any potential reconfigurations are limited. Investigations can be very demanding and at times a detective could have over 60 cases they are actively working. It is important for them to have privacy and space to work their cases. Through my research and speaking with other Chief Law Enforcement Officers who have built new facilities, it has been expressed how important it is to understand that this is a several-year process. We are currently struggling in many areas within our current facility and it will only become worse as time moves on. It is my recommendation that we add a new police facility into the capital improvement plan and initiate a planning process to accomplish that goal. Please contact me if you have questions. Sincerely Mitchell Scott Chief of Police