Loading...
HomeMy WebLinkAbout6.i Receive Bids/Award Contract - Meadows of Bloomfield 3rd Street & Utility Improvements, City Project #380AGENDA ITEM: Receive Bids /Award Contract- Meadows of Bloomfield 3rd Addition Street Utility Improvements, City Project #380 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer 1 AG e ATTACHMENTS: None. APPROVED BY: RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION REC ING BIDS AND AWARDING CONTRACT FOR MEADOWS OF BLOOMFIELD 3rd ADDITION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #380. ACTION: CITY OF ROSEMOUNT EXECUTIVE SIJMM "RY FOR ACTION CITY COUNCIL MEETING DATE: May 3, BACKGROUND: On Friday, April 29, 2005 bids for the referenced project were received and read aloud publicly. The bids will then be reviewed for accuracy before a recommendation can be made. This project includes the construction of streets and utilities to serve 118 dwelling units within the Meadows of Bloomfield 3rd Addition development. The Developer, Centex Homes, will fund all costs associated with the project with the exception of trunk utility oversizing costs for the watermain. The watermain oversizing costs are proposed to be funded by the Water Core Fund. SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. � J . � . � � . . . . . . O City of Rosemount �-�-em (� t I , DATE: May 3, 2005 TO: City Council and City Staff FROM: Jamie Verbrugge, City Administrator RE: Additional Information for City Couneil Agenda May 3, 2005 Consent Agenda, Item 6. i. The bid results were received on Apri129th for City Project 380,Meadows of Bloomfield 3a-d Addition Street and Utility Improvements. . The low bidder was Northdale Construction Company, Inc. in the amount of$1,580,315.70 which was $150,000 below the engineer's estimate. Staff recommends that City Council adopts the resolution receiving the bid and awarding the contract for Meadow of Bloamfield 3rd Addition. ` « . r CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2005 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR MEADOWS OF BLOOMFIELD 3RD ADDITION STREET AND UTILITY IMPROVEMENTS � CITY PROJECT#380 � BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Meadows of Bloomfield 3�d Addition Street and Utility Improvements are hereby received and tabulated.� 2. The bid of Northdale Construction Company, Inc., in the amount of $1,580,315.70 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. ADOPTED this 3�d day of May, 2005. William H. Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by: Seconded by: Voted in favor: Voted against: . " . . � '` ��� �. �� . , .�.. i : �.�. a.. �.. , �� � . 'a -a �s'- . i T.�_ . PROJECT: Meadows of Bloomfield 3rd Addition Street and Utility Construction and Appurtenant Work . City of Rosemount Project No. 380 LOCATION: Rosemount, MN WSB PROJECT NO.: 1556-31 Bids Opened: Friday, Apri129, 2005 at 10:00 a.m. .� Addendum Contractor Received Bid Security Total Bid 1 Northdale Construction Company, Inc. N!A X ����$1,580,315.�0 �� � � � �2 Three Rivers Construction, Inc. N/A�� � X ����1,594,1�8`3�4���� � 3 S. M. Hentges &Sons, Inc. N/A X $1,598,698.70 4 S.J. Louis Construction, inc. N/A X $1,617,773J8 5 � Contractors Edge, Inc. � � NIA � X ���$�,62� �g6;24 � 6 Richard Knutson, lnc. N/A X �����'k�,629��5�i7�_� � 7 Barbarossa and Sons, inc. N/A X $1,803,231.20 Engineer's Opinion of Cost $1,830,363.00 I hereby certify that this is a true and correct tabulation of the bids as received on April 29,2005. � Anthony . Aderhold, P.E., Project Manager : Denotes corrected figure K:101556-31tAdminlConstrucf(on AdmJn17556-3f Btd Tab Summaryx/s , -r � I.� �� � � . . . ,� . -_ Infrastructure 1 En ineerin 1 Plannin 1 Construction 701 Xenia Avenue South &Associates,Inc. 9 g g Suite 300 Minneapolis,MN 55416 May 2, 20�5 Tel:763-541-4800 Fax:763-541-1700 Honorable Mayor and City Council City of Rosemaunt 2875— 145�' Street West Rosemount, MN 55068 Re: Meadows of Bloomfield 3�'Addition Street and Utility Construction and Appurtenant Work City of Rosemount Project No. 380 WSB Project No. 1556-31 Dear Mayor and Council Members: Bids were received for the above-referenced project on Friday,April 29, 2005, and were opened and read aloud. A total of seven bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $1,830,363.00. Please find enclosed the bid tabulation indicating the low bidder as Northdale Construction Company, Inc., Rogers, Minnesota in the amount of$1,580,315.70. We recommend that the City Council consider these bids and award a contract to Northdale Construction Company, Inc. based on the results of the bids received. Sincerely, WSB &Associates, Inc. �J � �'� Anthony A. Aderhold,P.E. Project Manager Enclosure cc: Phil Lesnar, Northdale Construction Company, Inc. Andy Brotzler, City of Rosemount Cindy Dorniden, City of Rosemount srb Minneapolis 1 St.Cloud K�Ot 556-31Wdmin�Conuruction AdminVtEC LTR-hmcc-050205.dot Equal Opportunity Employer .