HomeMy WebLinkAbout6.i Receive Bids/Award Contract - Meadows of Bloomfield 3rd Street & Utility Improvements, City Project #380AGENDA ITEM: Receive Bids /Award Contract- Meadows of
Bloomfield 3rd Addition Street Utility Improvements, City
Project #380
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer 1
AG
e
ATTACHMENTS: None.
APPROVED BY:
RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION REC ING BIDS
AND AWARDING CONTRACT FOR MEADOWS OF BLOOMFIELD 3rd ADDITION
STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #380.
ACTION:
CITY OF ROSEMOUNT
EXECUTIVE SIJMM "RY FOR ACTION
CITY COUNCIL MEETING DATE: May 3,
BACKGROUND:
On Friday, April 29, 2005 bids for the referenced project were received and read aloud
publicly. The bids will then be reviewed for accuracy before a recommendation can be
made.
This project includes the construction of streets and utilities to serve 118 dwelling units
within the Meadows of Bloomfield 3rd Addition development. The Developer, Centex
Homes, will fund all costs associated with the project with the exception of trunk utility
oversizing costs for the watermain. The watermain oversizing costs are proposed to be
funded by the Water Core Fund.
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award will be
provided at the Council meeting.
� J
. � . � � . . . . . .
O
City of Rosemount
�-�-em (� t I ,
DATE: May 3, 2005
TO: City Council and City Staff
FROM: Jamie Verbrugge, City Administrator
RE: Additional Information for City Couneil Agenda May 3, 2005
Consent Agenda, Item 6. i.
The bid results were received on Apri129th for City Project 380,Meadows of Bloomfield 3a-d Addition
Street and Utility Improvements. .
The low bidder was Northdale Construction Company, Inc. in the amount of$1,580,315.70 which was
$150,000 below the engineer's estimate.
Staff recommends that City Council adopts the resolution receiving the bid and awarding the contract
for Meadow of Bloamfield 3rd Addition.
` «
.
r
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2005 —
A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT
FOR MEADOWS OF BLOOMFIELD 3RD ADDITION
STREET AND UTILITY IMPROVEMENTS �
CITY PROJECT#380 �
BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows:
1. All bids on construction of the Meadows of Bloomfield 3�d Addition Street and
Utility Improvements are hereby received and tabulated.�
2. The bid of Northdale Construction Company, Inc., in the amount of
$1,580,315.70 for the construction of said improvements are in accordance with
the plans and specifications and advertisement for bids is the lowest responsible
bid and shall be and hereby is accepted.
3. The Mayor and Clerk are hereby authorized and directed to enter into a contract
with said bidder for the construction of said improvements for and on behalf of
the City of Rosemount.
4. The City Clerk is hereby authorized and directed to return forthwith to all bidders
the deposits made with their bids, except that the deposit of all successful bidder
and the next two lowest bidders shall be retained until a contract has been
executed.
ADOPTED this 3�d day of May, 2005.
William H. Droste, Mayor
ATTEST:
Linda Jentink, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against:
. "
.
.
� '` ��� �. ��
. , .�.. i :
�.�. a.. �..
, �� �
. 'a -a �s'- . i T.�_ .
PROJECT:
Meadows of Bloomfield 3rd Addition
Street and Utility Construction and Appurtenant Work
. City of Rosemount Project No. 380
LOCATION:
Rosemount, MN
WSB PROJECT NO.:
1556-31
Bids Opened: Friday, Apri129, 2005 at 10:00 a.m.
.�
Addendum
Contractor Received Bid Security Total Bid
1 Northdale Construction Company, Inc. N!A X ����$1,580,315.�0 �� �
� � �2 Three Rivers Construction, Inc. N/A�� � X ����1,594,1�8`3�4���� �
3 S. M. Hentges &Sons, Inc. N/A X $1,598,698.70
4 S.J. Louis Construction, inc. N/A X $1,617,773J8
5 � Contractors Edge, Inc. � � NIA � X ���$�,62� �g6;24 �
6 Richard Knutson, lnc. N/A X �����'k�,629��5�i7�_� �
7 Barbarossa and Sons, inc. N/A X $1,803,231.20
Engineer's Opinion of Cost $1,830,363.00
I hereby certify that this is a true and correct tabulation of the bids as received on April 29,2005.
�
Anthony . Aderhold, P.E., Project Manager
: Denotes corrected figure
K:101556-31tAdminlConstrucf(on AdmJn17556-3f Btd Tab Summaryx/s
, -r
� I.� �� � � . . . ,� .
-_ Infrastructure 1 En ineerin 1 Plannin 1 Construction 701 Xenia Avenue South
&Associates,Inc. 9 g g
Suite 300
Minneapolis,MN 55416
May 2, 20�5 Tel:763-541-4800
Fax:763-541-1700
Honorable Mayor and City Council
City of Rosemaunt
2875— 145�' Street West
Rosemount, MN 55068
Re: Meadows of Bloomfield 3�'Addition
Street and Utility Construction and Appurtenant Work
City of Rosemount Project No. 380
WSB Project No. 1556-31
Dear Mayor and Council Members:
Bids were received for the above-referenced project on Friday,April 29, 2005, and were opened
and read aloud. A total of seven bids were received. The bids were checked for mathematical
accuracy and tabulated. The Engineer's Estimate was $1,830,363.00. Please find enclosed the
bid tabulation indicating the low bidder as Northdale Construction Company, Inc., Rogers,
Minnesota in the amount of$1,580,315.70.
We recommend that the City Council consider these bids and award a contract to Northdale
Construction Company, Inc. based on the results of the bids received.
Sincerely,
WSB &Associates, Inc.
�J � �'�
Anthony A. Aderhold,P.E.
Project Manager
Enclosure
cc: Phil Lesnar, Northdale Construction Company, Inc.
Andy Brotzler, City of Rosemount
Cindy Dorniden, City of Rosemount
srb
Minneapolis 1 St.Cloud
K�Ot 556-31Wdmin�Conuruction AdminVtEC LTR-hmcc-050205.dot