ISSUE
The 2005 Capital Improvement Plan (CIP) includes construction of Fire Station #2.
BACKGROUND
Fire Station #2 has been in the City's 10 -year CIP since 1997 The City secured land for
Station #2 in 2003 along the north side of Connemara Trail at Azalea Avenue, lust west of the
Centex Minea development (A sign is on -site indicating it is the future site of Station #2
The site will also include a future water tower and possibly a water treatment plant.
Project Design and Construction
Fire Chief Aker and several members of the Fire Department began looking at facility needs
in 2004 They evaluated whether Station #2 should serve as an independent operation, lust
as Station #1 does, or if the new fire station would operate as a satellite station while
maintaining primary department functions at the existing station
After evaluating service needs, equipment, and staffing, and after discussing it with the City
Council in 2004, Chief Aker is recommending that the new station be a satellite operation An
issue that was discussed last year was Staff and Council concern that the initial project be
well- thought out for the long -term needs of the community In other words, the facility should
be designed so that future growth or change in operational use could be accommodated
without significant additional cost
Chief Aker will be at the Work Session to discuss the facility needs that have been included in
our preliminary estimates related to the bays and general office space Staff has also been
looking at multi- purpose functionality of the facility to serve as a future polling place and as an
emergency operations center
The construction schedule for the project at this time is targeted to begin construction in the
fall (September) so that substantial pre winter work could be completed on the building
y
Page 2 of 3
exterior, allowing interior work to proceed toward a mid -year 2006 opening
Selection of Architect
In addition to the specific policy issues of moving forward and scale of the facility, staff would
appreciate Council direction on the selection of architect for the project Architectural
services are considered as professional services and therefore not subject to statutory RFP
and bidding requirements Vetter Johnson Architects designed Fire Station #1 The stafrs
experience with Vetter Johnson was very positive Chief Aker appreciated how attentive
Vetter Johnson was to the City's needs in designing that building and is very satisfied with the
facility The project team for Station #2 has met with Mark Vetter to discuss the project He
is able to meet the project timelines and has the benefit of understanding the City's needs as
well as having all of the construction documents from the last project to ease the process
Staff would like to retain Vetter Johnson again for this project
Preliminary Project Costs and Financing
The preliminary cost estimates have been based on growth inflators adjusted to the
construction costs of Station #1 A more accurate estimate would not be available until more
specific building plans are drafted However, the preliminary estimate ranges from $1 9
million to $2 2 million This includes contingency and project development costs, but does
not include FFE (furniture, fixtures and equipment) that could be an additional $100,000
The project is planned to be financed through the sale of general obligation bonds.
Springsted, Inc the City's financial advisor, is running preliminary tax impacts for three
different project cost scenarios $1 9 million, $2 2 million, and $2 5 million which will vary
based on square footage and exterior finish Those numbers were unavailable at the time
this memo was prepared but will be provided in advance of the meeting
State law was changed several years ago to allow City's to bond for certain capital projects
without referendum, Fire stations are among the projects that may be approved without
putting the question before the voters However, the law included a reverse referendum
petition provision Residents have 30 days from Council's action to submit a petition with
qualified signatures equal to 5% of votes cast in the previous general election
Spnngsted has also provided options regarding the timing to issue debt for the project The
standard approach would be to wait until the project is bid (approximately August) to issue
debt However, there are several reasons Council may wish to accelerate the financing to
May
First, the public hearing process and potential for reverse referendum would be a resolved
issue before the City has expended significant dollars for design, drafting of construction
plans, and preparation of bid documents Second, there is at least one legislative proposal
that would place a hard freeze on property tax levies An exemption is provided for debt that
is issued or contracts entered into prior to June 1, 2005 Finally, there may be some savings
(albeit small) related to interest rates if the City sells the bonds in May rather than in August
or September
Page 3 of 3
Staff has also discussed with Spnngsted the steps necessary to seek a bond rating increase
at the same time as we prepare documentation to issue debt A successful bond rating
increase, if granted by Moody's, would translate into more favorable rates and strengthen the
City's financial position
Public Involvement
Should the Council prefer a schedule that includes selling bonds in May, staff anticipates
holding 1 -2 public meetings in late March or early April prior to the public hearing regarding
the project The purpose of the public meetings would be to share discussion of need,
preliminary design information, and project cost details
An alternative approach would be a more community -based design and development
process, such as a task force, to work through the design phase This type of a process
would be preferred if Council anticipates that the project may be controversial or that a
reverse referendum petition is a strong possibility In that circumstance, it would be wise to
spend more time involving the community and budding community support Should Council
choose this approach, it would be best to begin it immediately and plan for 2006 construction
of the facility
SUMMARY
Staff has been working with AMCON Construction to perform project management duties and
help coordinate some of the pre planning activities AMCON and the City have partnered in
this manner for the first fire station as well as the City Hall renovation in 2001
In addition to the tax impact analysis that will be provided prior to the meeting, Chief Aker will
be prepared to discuss different design options Staff requests direction on the items detailed
in this memo
: 2/3/2005 •
City of Rosemount
Proposed Fire Station
Option 1 Option 2
Cost per SF Cost Cost per SF Cost
- Area(SF) Area(SF)
New Fire Station-Construction Cost 13,738 - 136 1,868,388 11,241 136
1,528,840
Outdoor Storage Building 900 70 63,000 900 7p
63.000
Subtotal-Construction Cost 1,931,388
1,591,840
Contingency 10%a 193,139 0
10% 459,184
Project DevelopmenUSoft Costs
A/E,SAC/WAC,testing,surveys,etc 15% 289,708 15%
238,776
FFE
Fumiture,Fixtures,Equipment Owner suppiied budget number Owner supplied budget number
Phones,Computers,Radio,etc.
Totaf Project Budget(not including land costs) $ 2,414,235
$ 1,989,800
https:J/webmaif.mn.rt.com/attach/Stadon 1 revised feb 05xlsShaBon 1 revised feb 05:xis
ROSEMOUNT FIRE STATION 2/3/2005
STATION 1 OPTION 1 OPTION 2
CURRENT
RM# ROOM AREA % AREA % AREA
101 B2ys 6,340 110% 6,974 90% 5,706
102 Standy-By 306 50% 153 50% 153
103 Laundry 240 40% 96 40% 96
104 Emergency Shower 16 100% 16 100% 16
105 SCBA Room 187 100% 187 100%0 187
106 Hose Storage 110 0 0 0 Q
107 Hose Tower 230 0 0 0 0
108 Storage/Radio Eng 99 100% 99 100% 99
109 Electric Room 88 100% 88 100% 88
110 Storage Room 374 60°to 224 60% 224
111 MediCal 126 100%0 126 9 00% 126
0 0
113 Workout Room 340 100% 340 0 0
114 Womens Locker 64 100% 64 100% 64
115 Womens Shower 40 100% 40 100% 40
116 Womens Bathroom Large 120 100% 120 100% 120
0 0
118 Janitor's Cioset 35 100%0 35 100% 35
119 Mens Bathroom Large 216 100% 216 100% 216
120 Mens Locker 134 0% 0 0% 0
121 Mens Shower 40 0°!0 0 0% 0
122 Mail Box Area 70 100% 70 100%0 70
0 0
124 Command Center 160 100% 160 0 0
125 Dispatch 175 100% 175 100% 175
0 0
127 Officer Office Area 554 0 0 0 0
0 0 0 0
129 Mens Bathroom Small 60 100% 60 0 0
� 130 Cioset/Meeting Room 130 0 0 0 0
131 Womens Bathroom Small 60 1D0% 60 0 0
132 Closet Meeting Room 130 100% 130 100% 130
133 Vending Area 102 100% 102 100% 102
134 Janitor's Closet 49 0 0 0 0
0 0
0 0
137 Day Room 585 50% 293 0 0
138 Kitchen Appliance Area 189 50% 95 50% 95
139 Kitchen Table Area 196 0 0 0 0
1
a
ROSEMOUNT FIRE STATION 2/3/2005
STATION 1 OPTION 1 OPTION 2
CURRENT
RM# ROOM AREA % AREA % AREA
140 Meeting Room 1,045 110% 1,150 110% 1,150
0 0
142 Fire Marshall Office 208 100% 208 100% 208
143 Chief OfFice 208 100% 208 100°fo 208
0 0
TOTAL NON-CIRC AREA 13,026 14,488 9,307
CIRCULATION AT 14.5% 1,889 1,666 1,350
TOTAL AREA 1st FLOOR 14,915 13,154 10,657
201 Mezzanine 987 50% 494 50% 494
202 Compressor Room 91 100% 91 100% 91
301 Hose Tower Top 200 0 0 0 0
TOTAL BLDG.AREA 16,193 13,738 11,241
PROJECT COST @$113/SF* $1,408,771 $1,552,410 $1,270,286
Garage/Out Building 900 0 0 0 -0
"Station 1 at$87 per SF per 1996 cost
EXISTING FIRST FLOOR
TOTAL ARER 14830
TOTAL NON-CIRCULATION AREA i'* 12956
TOTAL CIRCULATION 1874
% OF NON-CIRCULATION AREA 14.5%
"" Excluding Mail Box Area
ENGINEER NEWS-RECORD -Construction Building Cost Index
June, 1996 Cost Index 3178
June, 2004 Cosf Index 3996
Cost Index Increase(%) 126%0
June,2005 Adjusted Cost 143%
Increase 14%above 2004
1996 Construction Cost($/SF) $95'
Estimated 2005 Construction Cost($/SF) $136
2
Memorandum
To: Scott Aker, Fire Chief
From: George A Lundy, Fire Marshal�—
Date: February 9, 2005
Subject: Fire Deparhnent Responses for 2003 /2004
Chief Aker;
Attached you will find the information that you requested. I have broken down the fire
department responses as follows:
Medicals: This would include all medicals, lift assist, check the
welfare, and assistance provided to Health East
Ambulance.
Motor Vehicle Accidents: Motor vehicle accidents would include where extrieation/
rescue is needed along with first aid.
Fire: This would include all structure fires,brush fires and
automobile fires.
Good Intent: This category contains all false alarms, fire protection
systems activations where there are no fires,hazardous
materials spills under the reportable limits, smell of smoke
in the building, and all other investigations requiring a fire
department response.
If you would need further information,please feel free to contact me.
Rosemount Fire Departrnent
Emergency Calls
YEAR NUMBER 4F
CALLS
2000 454
2001 457
2002 537
2003 480
2004 550
.
� Ambulance Response Times = ssm�F ���T�}-
` MONTH YEAR Minimum Maximum Avera e
Res onse Res onse Res onse
Time Time Time
(Minutes (Minutes) (Minutes
Jul 2004 6 19 11.8
Au ust 2004 6 17 11
Se tember 2004 8 24 12.2
October 2004 6 18 11 .7
November 2004 3 15 10.1
December 2004 8 14 10.9
Januar 2005 7 20 11 .8
,
� CALLS BY RESP�NSE AREA
MONTH NUMBER STATION #1 STATION #2
RESPONSE RESPONSE
AREA AREA
JULY 20(34
Fire Calls 1 S
Medical Calis 24
Cancelled Calis 4
TOTAL CALLS 43 22 � g
Au ust 2004
Fire Calls �g
Medical Cal1s 22
Cancelled Calls 4
TOTAL CALLS 44 21 22
Se tember 2Q04
Fire Caals � 6
Medical Calis 34
Cancelled Calls 2
TOTAL CALLS 5 2 2 2 2 5