Loading...
HomeMy WebLinkAbout6.i. Change Order # 2, Rosewood Village 2nd Addition Street & Utilities Improvements, City Project 378CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: February 2, 2005 AGENDA ITEM: Change Order #2- Rosewood Village 2 "d AGENDA SECTION: Addition Street Utility Improvements, City Project #378 Consent PREPARED BY: Andrew J Brotzler, P E City Engineer AG ND ATTACHMENTS: Change Order #2 APPROVED BY:O, RECOMMENDED ACTION: MOTION TO APPROVE CHANGE ORDER #2 FOR ROSEWOOD VILLAGE 2 ND ADDITION STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #378 AND AUTHORIZE THE NECESSARY SIGNATURES ACTION: BACKGROUND: Change Order #2, Rosewood Village 2 nd Addition Street and Utility Improvements, City Project #378 includes the addition of $29,467 66 to the original contract amount of $443,123 59 for a new total of $472,591 25 The work included under Change Order #2 was for a storm sewer pipe sizing change to avoid a sanitary sewer conflict and to minimize sanitary sewer manhole builds, crew time for pumping water out of a storm manhole due to the temporary outlet being removed by the developer, crew time for removing unnecessary bends in existing watermain, clearing and grubbing trees that were not removed as part of the grading operation, additional grading for a parking lot as requested by the developer, the addition of 21" RC Pipe that was not on the original bid tabulation and a watermam offset to avoid a conflict with a storm sewer manhole All work done was either at the request of the developer, Progress Land Company, or agreed upon by the contractor, developer and City staff SUMMARY: Staff requests Council approval of Change Order #2 r n.r� r�,; �nig7r. =.i^�� .a.,vrei n r,'v t CHANGE ORDER NO 2 ROSEWOOD VILLAGE 2ND January 7, 2005 STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO 378 WSB PROJECT NO 1562 -00 OWNER City of Rosemount 2875 145th Street West Rosemount, MN 55068 CONTRACTOR Erickson Construction 13616 Pleasant Lane Burnsville, MN 55337 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION The following contract quantities are modified as shown on the attached detail The quantities reflect the following changes 1 Time and material to avoid sanitary sewer conflict with storm sewer crossings and to minimize santia y sewer depths 2 Crew time for pumping water out of STMH 5021 that was filled due to the removal of the temporary HDPE outlet by the developer 3 Crew time for removing existing 8' DIP bends to prevent overdepth 4 Clearing and grubbing trees between MH 5205 and MH 5201 that were not removed during the grading operation 5 Additional grading work for parking lot on Loop Street east of Blanca Avenue 6 Crew time for lowering watermam to avoid conflict with STMH 5204 7 21 RC pioe sewer design 3006 Class III IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME ORIGINAL CONTRACT PRICE $443,123 59 ORIGINAL CONTRACT TIME 1011512004 PREVIOUS CHANGE ORDERS No 1 $000 NET CHANGE FROM PREVIOUS CHANGE ORDERS N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $443 12359 CONTRACT TIME PRIOR TO THIS CHANGE ORDER 10/15/2004 NET INCREASE /DECREASE OF THIS CHANGE ORDER $29 467 66 NET INCREASE OF CHANGE ORDER 46 Days CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS $472,591 25 CONTRACT TIME WITH APPROVED CHANGE ORDERS 12/1/2004 RECOMMENDED BY ANT E NY A ADERHOLD, P E APPROVED B�Y��� WSB ASSOCIATES, INC ENGINEER ERICKSON CONSTRUCTION INC CONTRACTOR APPROVED BY CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION 1552 00 Co 2 Change Order No, 2 Detail ROSEWOOD VILLAGE 2ND CITY OF ROSEMOUNT, MN CITY PROJECT NO 378 ADDITIONAL QUANTITIES Extended Item No Description Qty Unit Price Amount TIME AND MATERIAL TO AVOID SANITARY 66 SEWER CONFLICT WITH STORM SEWER i LUMP SUM $2057956 $20,57966 CROSSINGS AND TO MINIMIZE SANITARY SEWER DEPTHS CREW TIME FOR PUMPING WATER OUT OF 69 STMH 5021 THAT WAS FILLED DUE TO THE 1 LUMP SUM $1,250 00 $1,250 00 REMOVAL OF THE TEMPORARY HDPE OUTLET BY THE DEVELOPER 70 CREW TIME FOR REMOVING EXISTING V DIP 1 LUMP SUM $625 00 $62500 BENDS TO PREVENT OVERDEPTH CLEARING AND GRUBBING TREES BETWEEN MH 71 5205 AND MH 5201 THAT WERE NOT REMOVED i LUMP SUM $33000 $33000 DURING THE GRADING OPERATION 72 ADDITIONAL GRADING WORK FOR PARKING LOT 1 LUMP SUM $3,193 DD $3,193 00 ON LOOP STREET EAST OF BLANCA AVENUE 73 CREW TIME FOR LOWERING WATERMAIN TO 1 LUMP SUM $1,51500 $1,51500 AVOID CONFLICT WITH STMH 5204 74 2503 541 21" RC PIPE SEWER DESIGN 3006 CLASS III 50 LF $3950 $1,97500 TOTAL ADDITIONAL QUANTITIES $29,467 fib TOTAL INCREASE CHANGE ORDER NO 2 29,467 66 1562 -00 CO 2C01 Detail