Loading...
HomeMy WebLinkAbout8. County Road 38 (Bonaire Path) Trunk Highway 3 to East Tract Line of Reflections Street & Utility Improvements, City Project #393CITY OF ROSEMOUNT EXECUTIVE SUMMARY FOR ACTION CITY COUNCIL MEETING DATE: February 15, 2005 AGENDA ITEM: County Road 38 (Bonaire Path) Trunk AGENDA SECTION: Highway 3 to East Tract Line of Reflections Street Utility Public Hearing Improvements, City Project #393 PREPARED BY: Andrew J Brotzler, P E, City Engineer 0 AG PJQAA �M#% ATTACHMENTS: Resolution APPROVED BY: RECOMMENDED ACTION: MOTION TO ADOPT A RESOLUTION ORDER G THE PROJECT AND AUTHORIZING THE PLANS AND SPECIFICATIONS FOR THE COUNTY ROAD 38 (BONAIRE PATH) TRUNK HIGHWAY 3 TO EAST TRACT LINE OF REFLECTIONS STREET AND UTILITY IMPROVEMENTS, CITY PROJECT #393 ACTION: BACKGROUND: On February 1, 2005 the Rosemount City Council received the Feasibility Report and set the public hearing for County Road 38 (Bonaire Path)(CR 38) Street and Utility Improvements, City Project #393 This project consists of reconstructing County Road 38 (CR 38) (Bonaire Path) from Trunk Highway 3 (TH 3) east to the easterly tract line of the Harmony, formerly known as Brockway, residential subdivision The proposed improvements include the reconstruction of CR 38 to an urban section with curb and gutter and the addition of turn lanes at Trunk Highway 3 and Brockway Avenue Also included is the construction of sanitary sewer trunk and lateral mains, trunk and lateral watermain, storm sewer and a bituminous path along the south side of the road along the entire length of the project The total estimated project cost is $1,577,300 The project is proposed to be funded as follows CR 38 Proposed Funding Street CIP 203,800 Dakota Count 658,200 Special Assessments 76,400 Sanitary Core Fund 101,700 Water Core Fund 208,400 Storm Sewer Core Fund 82,300 Pre aid Cash Deposits 246,500 TOTAL 1,577,300 It is proposed that construction will begin in 2005. The project construction will be completed, including all restoration items in 2006. SUMMARY: Staff recommends Council adoption of a resolution ordering the project and authorizing the preparation of plans and specifications the County Road 38 (Bonaire Path) Trunk Highway 3 to East Tract Line of Reflections Street and Utility Improvements, City Project #393 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2005 A RESOLUTION ORDERING THE PROJECT AND AUTHORIZING THE PREPARATION OF THE PLANS AND SPECIFICATIONS COUNTY ROAD 38 (BONAIRE PATH) (TRUNK HIGHWAY 3 TO EAST TRACT LINE OF REFLECTIONS) STREET AND UTILITY IMPROVEMENTS CITY PROJECT #393 WHEREAS, the City Council has received and accepted the Feasibility Report on February 1, 2005 for City Project #393, and WHEREAS, the City Council held a Public Hearing on February 15, 2005 NOW THEREFORE BE IT RESOLVED, that the City Council of the City of Rosemount hereby orders the improvements of the County Road 38 (Bonaire Path) (Trunk Highway 3 to East Tract Line of Reflections) Street and Utility Improvements City Project #393. BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project No 393 ADOPTED this 15th day of February, 2005. William H Droste, Mayor ATTEST: Linda Jentink, City Clerk Motion by Seconded by Voted in favor Voted