Loading...
HomeMy WebLinkAbout8.b. Adoption of Comprehensive Water System PlanAGENDA ITEM: Adoption of Comprehensive Water System Plan AGENDA SECTION: New Business PREPARED BY: Andrew J. Brotzler, P.E., City Enginee 1111 AG d 8 E Ya u ATTACHMENTS: Resolution, New Cover Pages APPROVED BY: RECOMMENDED ACTION: Motion to Adopt a Resolution Adopting the Compr een Water Supply Plan. x ROSEMOUNT CITY COUNCIL City Council Meeting: November 1, 2005 ISSUE: Consider adoption of Comprehensive Water Supply Plan. BACKGROUND: In 2004, the preparation of an update to the 1997 Comprehensive Water Supply Plan was authorized. The schedule for the completion of this update was modified to coincide with the schedule for the work on the 42 Land Use Plan With the recent adoption of the 42 Land Use Plan, the approved land uses changes have been incorporated into the final Comprehensive Water Supply Plan. Following is an overview of the Plan highlights: Current water system information EXECUTIVE SUMMARY Average day water demand is 2.0 MGD Peak day water demand is 5.6 MGD Municipal water system includes 7 wells with total capacity of 6,600 gpm Three existing elevated storage tanks piovide 2,000,000 gallons storage capacity Water treatment mcludes addition of chlorine, fluonde and polyphosphate at wells Existing estimated population of 20,501 Future projected water system needs Projected average day and peak day water demands G \ENGPROJ \Comprehensive Water Supply Plan \AdoptPlanCCll -1 -05 doe Year Average Day (MGD) Peak Day (MGD) West Side East Side Total West Side East Side Total 2005 1.99 0.10 2.09 4.97 0.26 5.23 2010 3.72 0.87 4.58 9.29 2.17 11.46 2015 4 82 1.53 6.35 12.04 3.83 15.86 2020 4.85 2.65 7.50 12.12 6.63 18.75 2025 4 85 3.99 8 84 12.12 9.97 22.09 Ultimate 7.78 4.73 12 51 19.44 11.83 31.27 Three new well fields proposed that will include up to 20 additional wells to meet projected ultimate demand Total protected future water storage needed for ultimate conditions is 13,000,000 gallons Evaluation of options for future water treatment fac hues. SUMMARY: The Plan has remained unchanged from the Plan provided to Council at the September 14, 2005 City Council Work Session. Therefore, only the attached updated title pages are being provided to Council at this time. Staff will provide a bnef overview of the Plan and respond to any questions that Council may have. Staff is recommending Council approval of the Comprehensive Water System Plan. 2 WHEREAS, the Rosemount Utility Conunission authorized the update of the Comprehensive Water System Plan and recommend that the City Council adopt the Comprehensive Water Supply Plan, and WHEREAS, City Council and City staff have reviewed the Plan and recommendation from the Rosemount Utility Commission. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount adopts the Comprehensive Water System Plan ATTEST: Linda Jentmk, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2005 A RESOLUTION ADOPTING THE COMPREHENSIVE WATER SYSTEM PLAN William H Droste, Mayor Motion by Second by: Voted in favor: Voted against Comprehensive Water System Plan WSB Project No. 1582 -00 701 Xenia Avenue South, Suite 300 Minneapolis. MN 55416 763 -541 -4800 November 4, 2005 Prepared for: 4 ROSEMOUNT MINNESOTA Prepared by: s WSB Associates, Inc COMPREHENSIVE WATER SYSTEM PLAN Comprehensrrc Hater System Plan Cap o f Rmenutnt, MA' W5B Project At. 158240 Prepared for the: City of Rosemount 2875 145 Street West Rosemount, MN 55068 1 November 4, 2005 Prepared by: WSB Associates, Inc. 701 Xenia Avenue South, Suite 300 Minneapolis, MN 55416 763 -541 -4800 (TEL) 763 -541 -1700 (FAX) 1 1 e wsa Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Associates Inc Suite 300 Minneapolis, MN 55416 Tel 763 541 -4800 fax 763 541 -1700 November 4, 2005 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Comprehensive Water System Plan City of Rosemount, MN WSB Project No. 1582 -00 Dear Mayor and City Council Members: Transmitted herewith is the Comprehensive Water System Plan for the above referenced project. The report is a planning tool to help the City meet its short-term and long -term water demands. We would be happy to discuss this report with you at your convenience. Please give us a call at 763 -541 -4800 if you have any questions. Sincerely, WSB Associates, Inc. /7e-t-t/finia Kevin F. Newman, P.E. Project Manager Enclosure srb Minneapolis 1 St Cloud Equal Opportunity Employer '1 Co,,, m i l! ea v 1 e 1l alrr System Plan Ltty of Rosemount, AIN WSB Project No 1582 -60 CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly licensed professional engineer under the laws of the State of Minnesota. 15 f Nn- Date: November 4, 2005 Prepared by: Kevin F. Newman, P.E. Lic. No. 25198 Joseph C. ard, E.I.T Date: November 4, 2005 Quality Control Review by: 7ancy D. J 2--C ler, .E. Date: November 4, 2005 Lc. No. 42823