EXECUTIVE SUMMARY
City Council Regular Meeting: December 6, 2016
AGENDA ITEM: Authorization of Amendment of
Agreement with Bolton & Menk, Inc. for
Extension of Interim Public Works
Director/City Engineer Services
AGENDA SECTION:
Consent
PREPARED BY: John Morast, PE, Director of Public
Works/City Engineer AGENDA NO. 6.i.
ATTACHMENTS: Proposal and Professional Services
Agreement from Bolton & Menk, Inc. APPROVED BY: ddj
RECOMMENDED ACTION: Motion to Authorize an Amendment to the Current
Professional Services Agreement with Bolton & Menk, Inc. Extending Interim Public Works
Director/City Engineer Services from January 1, 2017 for up to Six (6) Months
ISSUE
Consider authorizing execution of an amendment to the current Professional Services Agreement with
Bolton & Menk, Inc. (BMI) for extension of the Interim Public Works Director/City Engineer services
from January 1, 2017, for up to six (6) months.
BACKGROUND
The contracted Interim Public Works Director/City Engineer provides support to the City Administrator
and city staff, managing the Public Works Department, projects and State and County coordination. In
June 2016, the City contracted with BMI to provide Interim Public Works Director/City Engineer services
through December 2016.
The amendment proposes to maintain the terms of the original agreement (including fees) and will extend
the term date for up to six (6) months. BMI will continue Interim City Engineering Services as currently
provided - base services up to 20 hours per week, plus up to 10 additional service hours per week, at
standard billing rates.
With the new City Administrator starting in January 2017, an extension of Interim City Engineer Services
will continue to provide staff continuity and allow adequate time for the incoming City Administrator to
determine and finalize City staffing needs and utilization of the Engineering Consulting pool.
SUMMARY
Staff is requesting City Council authorization to execute an amendment to the current Professional
Services Agreement with BMI for an extension of the Interim City Engineer services from January 1, 2017,
for up to six months.
Interim City Engineer Services Extension
December 1, 2016
Dwight Johnson
City Administrator
City of Rosemount
2875 145th Street West
Rosemount MN 55068
RE: Amendment to Extend the Term of Professional Engineering Services Agreement
for City of Rosemount Interim City Engineering Services
Dear Mr. Johnson:
Thank you for requesting Bolton & Menk’s proposal to extend Professional Engineering Services to
Provide Interim City Engineering Services to the City of Rosemount.
The original agreement was executed on June 8, 2016 and is effective through December 31, 2016. As
discussed, this amendment will extend the terms of the original agreement from January 1, 2017 for up to
six (6) months, to continue providing base Interim City Engineering Services for up to 20 hours per week,
plus up to 10 additional service hours per week, at standard billing rates, for continued Public Works
Department coordination and continuity.
We are pleased to be providing services to the City of Rosemount and are excited about the opportunity to
continue working with you. If the City accepts this proposal, please sign and return a copy of the
agreement. If you have any questions regarding this proposal, please feel free to contact me at
952.890.0509 ext. 3149.
Sincerely,
Bolton & Menk, Inc.
John W. Morast, PE
Senior Project Engineer Accepted: ___________________________
City of Rosemount
Cc: Marcus Thomas, PE, Burnsville Office manager
N +
r
1 , *
y5 ggq p
w' f
June 8, 2016
Mr. Dwight Johnson
City Administratar
City of Rosemount
2875 145th St W
Rosemount MN 55068
RE: Proposal to Provide Professional Engineering Services
City of Rosemount [nterim City Engineering Services
Dear Mr. Johnson:
Thank you for requesting Bolton& Menk's proposal to provide professional engineering services to the City of
Rosemount for [nterim City Engineer Services and to assist the City in ensuring a smooth and seamless transition as it
searches for a new Public Works Director/City Engineer.
Bolton& Menk takes pride in tailoring our engineering services to meet your specific goals and expectations. The
extent and variety of our municipal engineering experience along with a comprehensive understanding of local
government dynamics separates us from our competition. The following is a summary of the reasons why we are
confident Bolton & Menk will provide you with engineering services that exceed your expectations:
Over 65 years of providing engineering and surveying services to municipalities
Engineering services customized to meet the goals and expectations of Rosemount
An appreciation of the sensitivity of local and regional dynamics, and their impact on the decision-making
process with regards to public improvements and infrastructure management
Experienced staff capable of providing full service to Rosemount
The ability to work as an extension of City staff
Firm commitment to client satisfaction
In addition, Bolton& Menk has well established and respected relationships with nearby and partner jurisdictions,
such as MnDOT, Dakota County, Eagan, Inver Grove Heights, Apple Valley, Lakeville, Burnsville, South St. Paul,
Hastings and others. BM[ has worked on many projects requiring extensive project and multi-jurisdictional
coordination, including
Dakota County CSAH 14(Southview and 3`d Ave) Improvements (Dakota County, So. St. Paul)
Dakota County CSAH 42 Bridge& Roadway Project at 35W (Dakota County, MnDOT, Burnsville)
Dakota County Kenwood Trail (CSAH 50) Expansion(Dakota County, Lakeville)
Dakota County CSAH 42 Trail (Dakota County, Burnsville, Apple Valley)
Dakota County CSAH 42 Highway and Frontage Road Improvements(Burnsville)
City of Burnsville 35 W& Cliff Road Interchange Study(Burnsville, Dakota County, MnDOT)
MnDOT TH 61 Reconstruction(MnDOT, White Bear Lake)
MnDOT County Road E &TH 51 [mprovements (MnDOT, Ramsey County, Arden Hills)
UNDERSTANDING
The City of Rosemount's Public Works Director/City Engineer position will be vacant in the near future, and the City
is currently advertising to fill the position. The City desires to hire an Interim City Engineer to help ensure department
continuity and coordination with staff, projects and jurisdictional communications. We understand that there are a
number of projects and initiatives currently in-progress in Rosemount, including the planning and design of
interchange improvements at TH 52 and CSAH 42. We also understand that the Public Works Department is also
short-staffed in administration and engineering technician areas. Our proposal includes the opportunity to utilize a
f
u gt } _ .# :f
ta+.
con bination of administration and technical services in order to support the ariet of active worl: and proj cts the
City is currently managing.
PROPOSED INTERIM CITY ENGINEER
Bolton& Menk proposes to assign Mr.John Morast, PE, as the Interim City Engineer under this proposal. Mr. Morast
has over 30 years of experience in the public works and engineering fields, 20 of which are in the public sector at the
State, County and Municipal levels. His public sector experience includes over 15 years of direct staff, program and
department management experience in public works and engineering at the local leveL Mr. Morast will be supported,
as needed, by Bolton& Menk staff that is experienced and well-versed in a variety of municipal engineering and
public works services and projects.
As your designated Consultant Interim City Engineer, Mr. Morast will bring 30 years of experience utilizing his
inclusive and total quality management approach to leading and administering departments, staff and projects. He
places a heavy emphasis on frequent communication and coordination with the City Council, City Administration, and
City staff. Our approach to the working relationship between the City Engineer and the City is as follows:
Mr. Morast will work as an extension of City staff and will report directly to the City Administrator.
Duties assigned by the City Administrator, including direction to work directly with other Department Heads,
Council, other staff or partner jurisdictions, will be completed as necessary within the requested time frames.
Mr. Morast is available 24/7 to respond to the City Council or staff inquiries quickly and effectively through
the use of a mobile phone and emails. Mr. Morast will be available for the City of Rosemount as needed.
Regular written reports will be provided for City Administrator and City Council packets, if desired. Reports
will provide staff and the City Council with status updates of all ongoing projects.
SCOPE OF WORK
Mr. Morast will work with you and other City staff to address a variety of City issues and needs. Bolton& Menk
proposes the following services to the City of Rosemount:
General Staff Engineering
Staff time of 80 hours per month, distributed, or concentrated, as necessary to accommodate City needs
Attendance at City Council and advisory commission meetings as necessary
Attend City Administrator staff meetings
Conduct Public Works/Engineering staff ineetings
Attend City Committee/Board meetings as necessary
Management/oversight of Public Works projects, concentrating on Dakota County and MnDOT coordination
and communications.
Act as City liaison with other agencies, as requested
Coordinate and collaborate with other City departments on projects and issues
Coordinate with and ensure City standards and needs are met on development projects
Municipal State Aid system management
Advise staff, City Administrator and Council on engineering related issues
Mr. Morast and any other necessary BMI staff and specialists will provide an average of 20 hours per week at the City
of Rosemount, or other locations as appropriate for meetings,to fulfil the interim City Engineer duties. The specific
days/working hours will be developed by Mr. Morast in collaboration with City staff.
EXPERIENCE
4
a =
o O F g i
d;
John has adtninist red public orksiengine ring functions in tlie public s ctor lor over 2 years, includit b:
Responsible for public works staff up to 250 FTE
Responsible for operating budgets up to $38 million
Responsible for capital budgets up to$92 million
Administered Engineering, Development Services, Operations, Maintenance,Traffic,Construction
Management, Water& Sewer Utility, Stormwater, Fleet, Facilities, Solid Waste and Parks Departments
Administered short term(yearly)and long-term(Capital [mprovement) project and program budgets
Administered asset management programs for roadway, utility and signing
Developed strategies to enhance permitting to provide efficient services, collaboration, strategic partnerships
opportunities,and intergovernmental relationships
Responsible for cross jurisdictional agency communication and coordination
John will also be supported by experts in various fields on specific projects and issues as needed, including:
Seth Peterson, PE—Environmental engineering and well abandonment
Brian Hilgardner, PE—Development plans reviews
Bryan Nemeth, PE—Traffic
For additional reference, biographies for these individuals can be found in our recently submitted SOQ for Rosemount
Consultant Pool Services.
FEES
Bolton & Menk proposes to complete the City Engineering activities, including meeting attendance, staff oversight and
project management and coordination, for a fixed fee of$8,800 per month, based 80 hours per month, to be distributed
in the best interest of the City, for a duration of up to 6 months.
If additional services are requested(i.e., project-specific design services,land surveys, continuous construction
inspection,etc.),a scope amendment would be discussed and presented prior to beginning any additional services.
Additional services could be provided on an hourly or not-to-exceed basis, based on the nature of the requested
services.
This proposal includes a general scope of work and cost of services to perform. If this proposal is acceptable and you
wish to proceed, we will enter into a professional services agreement with the City of Rosemount using your standard
contract forms.
We are pleased that you are considering us for this work and appreciate the opportunity to provide you with this scope
of services. If the City accepts this proposal, please sign, scan, and return this document. If you have any questions
regarding this proposal, please feel free to call me at 952-890-0509 ext. 3149.
Sincerely,
BOLTON & MENK, INC.
John W. Morast, P.E. Accepted: .e. C,.,,er
Sr. Project Manager y of Rose ount
cc: Marcus A. Thomas, PE, BMI Burnsville Office Manager