Loading...
HomeMy WebLinkAbout9.a. Capital Improvement Plan EXECUTIVE SUMMARY City Council Regular Meeting: December 6, 2016 AGENDA ITEM: Capital Improvements Plan AGENDA SECTION: New Business PREPARED BY: Dwight Johnson, City Administrator AGENDA NO. 9.a. ATTACHMENTS: 10 year CIP APPROVED BY: ddj RECOMMENDED ACTION: Motion to adopt the attached 10-year Capital Improvements Plan for 2017-2026. BACKGROUND Each year, the City reviews and updates its 10 year Capital Improvements Plan (CIP). There are three major capital improvement funds in addition to the Utility funds: the Street CIP, the Equipment CIP, and the Building and Facilities CIP. The Council initially reviewed the proposed program on November 7th and directed that the proposed CIP be presented to the Planning Commission for consideration. It has also been discussed by the Parks and Recreation Commission and is now being brought back to the Council for formal action. PLANNING COMMISSON ACTION The Planning Commission reviewed the attached CIP Plan on November 22, 2016 and found the plan to be in compliance with the City’s Comprehensive Plan. Review of a formal CIP by the Planning Commission is required before adoption by the City Council. Their legal standard of review is whether or not the Plan is in compliance with the adopted Comprehensive Plan. DISCUSSION OF SIGNIFICANT UPDATES Most of the significant updates for the CIP update involve revisions in planned parks and recreation projects, City buildings and facilities, major road improvements, and utility projects. These changes are discussed separately below. Parks and Recreation Projects The City held a referendum for parks improvements including a new indoor ice sheet in May, 2016 which did not pass. Staff believes that a new sheet of ice cannot be accomplished without either a major partnership with one or more other entities and/or bonding and is therefore outside of the scope of this CIP update which focuses on the allocation of existing revenues. After several meetings with our athletic associations and the Park and Recreation Commission, the following major projects are proposed for the next few years in the Building and Facilities CIP fund: • 2017: Restoration of Carroll’s Woods $200,000 • 2017: Funds to partner with a potential private indoor recreation facility • 2017-2018: Completion of UMore ballfield complex except for the large field. • 2020-2021: Completion of Flint Hills fields • 2022: Central Park improvements 2 Other projects proposed include new splash pad play features ($12,000) in 2017, dugout covers for UMore and Erickson Parks ($70,000) in 2018, and baseline fencing for three fields ($30,000) in 2019. City Buildings and Facilities For the first time in a number of years, it is proposed that $1,000,000 be allocated in 2017 for improvements in core City facilities including Public Works, Police and City Hall spaces. Staff believes that we are quickly approaching or at our capacity in all three facilities. Future strategies could include: 1. A series of relatively small improvements to each space to buy time, perhaps up to five years. 2. Plan for one or more major new facilities such as a new Police station, a new City Hall, or a new Public Works campus. 3. Build an addition on to City Hall over the top of the police garage to add office and conference room space (first proposed in the early 2000’s). *approximate 3000 square foot addition. The $1,000,000 allocation could be enough for either item 1 or item 3, or provide a start on planning for item 2 facilities, or some combination of strategies to be determined. Some short term needs that could be met through item 1 or item 3 include: Public Works : a wash bay, a clean out area, a salt and brine shed, and additional fencing/security. Police : Larger spaces for evidence room and crime lab, more interview rooms, larger briefing room, larger Women’s locker space, larger lobby area and more office spaces. * Some of these needs could be met by reconfiguring existing spaces. City Hall: large conference room, several small conference rooms, and more office spaces/work stations. *Some of the meeting room spaces could be shared between Police, City Hall, and City Council needs. Major Road Improvements Staff has reviewed our Minnesota State Aid funds and identified the priority projects as follows: 2017: County Road 42/Highway 52 interchange. 2018: McAndrews improvements including turn lanes and a possible underpass for the regional trail at Dodd Road. Federal funds have been received for a part of this project. 2018: Bonaire Path from Akron Ave. east across the RR tracks, including Quiet Zone improvements. Improvement will serve the city park, new development and provide a quiet zone extension. 2020: Biscayne from Boulder Trail south to County 46. UMore Park pays half of the amount. 2022: County Road 73 from Bonaire Path to north City limit. Utility Projects Some proposed utility projects in the next several years include: 2017: Keegan Lake flood control project. 2018: Extension of utilities to UMore Park 2019: Possible water storage and treatment plan facilities. 2022: Well #17 construction. RECOMMENDATION The Council should review the proposed projects, direct staff on any changes and to proceed with further review by the Parks and Recreation Commission and the Planning Commission before taking final action. 10-YEAR CIP WORKING PROGRAM 2017-2026 10-YEAR CAPITAL IMPROVEMENT PLAN (CIP) BACKGROUND Historically, the City of Rosemount has usually had some form of CIP in place to utilize for its capital improvements. There have been times where just a single year’s capital improvements have been addressed and funded. For many years a 5-year CIP was utilized. Over time it was felt that the best way to plan for the future was to look out over a period of at least 10 years. What evolved is the following 10-year Capital Improvement Plan. We believe that great strides have been made to more accurately plan for the future of the City of Rosemount. This document is only a working guide that is utilized by the City Council and its staff to prepare for the future. The first year of the plan will be included as part of the formal budget that is prepared yearly as part of our Truth-in-Taxation process with the following years developed as a working tool for future years’ discussions. GENERAL/ADMINISTRATIVE DESCRIPTION The CIP provides for specific funding of items that are generally of a higher estimated cost than $5,000 and will have a life expectancy of 3 years or greater. The source of funding for these expenditures is typically the general tax levy. In some instances, other funding is utilized. For example, revenues received from user fees are being designated in various CIP funds for capital improvement/equipment purchases. Individual departments are designated for each item proposed for purchase in this plan. TYPES OF CAPITAL IMPROVEMENT FUNDS The CIP includes three separate funds to isolate and better track the types of capital improvements being planned for. The following briefly describes each of the three: Building & Facilities CIP Fund - This fund is used to account for the on-going capital improvements and possible additions to government buildings and other facilities. This fund also is utilized for “special projects / items” that are funded mainly with SKB revenues – monies outside of the typical tax levy funding. Street CIP Fund - This fund is used to account for the on-going street and trail construction and reconstruction projects within the City and all other major maintenance items related to both paved and unpaved streets including, but not limited to, street lights, signal lights, sidewalks and gravel road resurfacing. Equipment CIP Fund - This fund is used to account for the on-going replacement of and additions to City equipment. 1 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2017 1 Replace Ice Edger Arena 6,000 (1)6,000 2017 2 Restroom Rehab - Upper Arena 30,000 (1)30,000 2017 3 PC Workstation Upgrades (From 2012) (Police, Fire, P.W.)Finance 69,000 69,000 2017 4 Technology Upgrades Station #1 Fire 10,000 10,000 2017 5 Hose Truck (Replace 1-Ton Truck) Fire 55,000 55,000 2017 6 City-Wide Software Gen'l. Govt.25,000 25,000 2017 7 Business Park Sign Gen'l. Govt.25,000 25,000 2017 8 Indoor Recreational Facilities Gen'l. Govt.500,000 500,000 2017 9 City Facilities Improvements Gen'l. Govt.1,000,000 1,000,000 2017 10 Parks Master Plan Update Park & Rec 20,000 20,000 2017 11 Dunmore Park Development Park & Rec 150,000 150,000 2017 12 Horsehoe Lake Park - Phase 1 Park & Rec 200,000 200,000 2017 13 Greystone Park Development Park & Rec 500,000 500,000 2017 14 Additional Splash Pad Features Park & Rec 12,000 12,000 2017 15 Carroll's Woods Master Plan & Restoration Park & Rec 210,000 210,000 2017 16 UMore Ball Field Improvements - Phase 1 Park & Rec 900,000 900,000 2017 17 Replace Police Portable Radio Batteries Police 4,500 4,500 2017 18 Body Cameras Police 14,000 10,000 (2)24,000 2017 19 Portable Alarm Replacements Police 15,000 15,000 2017 20 Squad Set Up and Equipment Installation Police 20,000 20,000 2017 21 Replace Squad Laptops (5) / Printers / Netmotion (2019 Combined)Police 70,000 70,000 2017 22 2 Squads (Sell Back 2 - #3560 & #3570)Police 64,000 18,000 (3)82,000 2017 23 PW Building Addition Lease/Purchase (Year 19 of 20)Pub Works 24,000 10,000 10,000 44,000 2017 24 Pedestrian Improvements Program Pub Works 125,000 125,000 2017 25 PMP (Shannon Hills B, Shannon Parkway A)Pub Works 944,367 83,137 1,027,504 2017 26 County Road 38 - CSAH 31 to TH 3 (ROW Costs) Pub Works 100,000 (4)100,000 2017 27 Bonaire Path - Akron Avenue to Greystone (with Quiet Zone)Pub Works 200,000 (5)200,000 2017 28 CSAH 42 Bridge at TH 52 (Includes Watermain Extension)Pub Works 1,305,000 800,000 (6)2,105,000 2017 29 Keegan Lake Drainage Improvements Pub Works 118,750 356,250 475,000 2017 30 Cartegraph OMS Implementation & Licensing Pub Works 42,900 10,700 10,700 10,700 75,000 2017 31 6" Trash Pump (Replace #8088) (Purchased 1989)Pub Works 7,000 7,000 8,000 22,000 2017 32 Dump & Clean Station for Vactor / Mowers Pub Works 40,000 40,000 2017 33 Broom Attach for #8071 & #8072 (Replace #0146) (1995) Pub Works 5,000 5,000 2017 34 Paint Mixer Pub Works 12,000 12,000 2017 35 RTV Kubota (Replace #8401) (Purchased 2004)Pub Works 18,000 2,000 (7)20,000 2017 36 Ford Focus - Inspections (Replace #8612) (2000 Vehicle)Pub Works 23,000 2,000 (7)25,000 2017 37 Minivan (Replace #8621) (1998 Vehicle)Pub Works 28,500 1,500 (7)30,000 2017 38 1-Ton Pickup (Replace #8315) (2006 Vehicle)Pub Works 31,000 4,000 (7)35,000 2017 39 1-Ton Pickup (Replace #8333) (2003 Vehicle)Pub Works 10,000 11,000 10,000 4,000 (7)35,000 2017 40 JD Tractor & Broom Attachment (Replace #8408 & 0139) (2002)Pub Works 65,700 16,000 (7)81,700 2017 41 Sweeper (Replace #8444) (Purchased 2005)Pub Works 99,000 99,000 12,000 (7)210,000 2017 42 Grader (Replace #8413 & #0192) (Purchased 2001)Pub Works 260,000 40,000 (7)300,000 2,671,000 1,069,367 931,600 83,137 870,000 1,605,000 800,000 0 118,750 37,700 38,700 523,950 0 145,500 8,894,704 Total CIP Funding Requirements - Year 2017 $4,671,967 $0 (1)Ice Edger & Upper Restroom Rehab funding comes from Arena Fund operations/reserves. (2)Other funding for Body Cameras comes from assigned funds. (3)Other funding for Squad Cars comes from auction sales of old vehicles. (4)Other funding for County Road 38 project for County's share and the City of Apple Valley's share of project are not included. Costs are for Right of Way purchases and are Rosemount's share only. (5) Other funding for Bonaire Path project are not included. Costs are Rosemount's share only. (6)Other funding for CSAH 42 Bridge at TH 52 project for County State Aid share and Federal Funding share of project are not included. Construction costs are Rosemount's share only. (7) Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2017 is $24,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2017 is $811,400. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives. Total Equipment CIP levy for 2017 is $580,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 2 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2018 1 Restroom Rehab - Lower Arena 25,000 (1)25,000 2018 2 Paint Arena Ceiling Arena 85,000 (1)85,000 2018 3 Replace Council & Staff Tablets Finance 12,500 12,500 2018 4 City-Wide Software Gen'l. Govt.25,000 25,000 2018 5 Covered Dugouts at UMore Ball Field & Erickson Park Park & Rec 70,000 70,000 2018 6 UMore Ball Field Improvements - Phase 2 Park & Rec 900,000 900,000 2018 7 Koch Trail Restoration Park & Rec 50,000 (2)50,000 2018 8 Skate Park Upgrades - Phase 1 Park & Rec 65,000 (2)65,000 2018 9 Trail Plans & Design Park & Rec 30,000 30,000 2018 10 Horsehoe Lake Park - Phase 1 Park & Rec 300,000 300,000 2018 11 Replace Speed Trailers Police 15,000 15,000 2018 12 Evidence Processing Room Equipment Upgrades (Software)Police 30,000 30,000 2018 13 Squad Set Up and Equipment Installation Police 39,000 39,000 2018 14 Replace Squad Mobile Radios Police 54,000 54,000 2018 15 3 Squads (Sell Back 3 - #3520, #3580 & #35120)Police 96,000 18,000 (3)114,000 2018 16 PW Building Addition Lease/Purchase (Year 20 of 20)Pub Works 24,000 10,000 10,000 44,000 2018 17 Pedestrian Improvements Program Pub Works 125,000 125,000 2018 18 PMP (Motz, Biscayne Pointe A, Biscayne Avenue C)Pub Works 730,660 243,741 974,401 2018 19 County Road 38 - CSAH 31 to TH 3 (Construction) Pub Works 800,000 (4)800,000 2018 20 Bonaire Path - Akron Avenue to Greystone (with Quiet Zone)Pub Works 2,000,000 (5)2,000,000 2018 21 Blower Attach for #8071 & #8072 (Replace #0119) (2001)Pub Works 7,500 7,500 2018 22 1/2-Ton Ex-Cab Pickup (Replace #8329) (2006 Vehicle)Pub Works 29,000 6,000 (6)35,000 2018 23 1-Ton Pickup w/Dump (Replace #8310) (2003 Vehicle)Pub Works 52,500 7,500 (6)60,000 2018 24 Groundsmaster Mower (Replace #8068) (Purchased 2008)Pub Works 77,000 8,000 (6)85,000 2018 25 Sidewalk Trac & Blower (Replace #8417 & 0121) (Purchased 2003)Pub Works 95,000 15,000 (6)110,000 2018 26 Single-Axle Dump Truck (Replace #8436) (2005 Vehicle)Pub Works 140,000 35,000 (6)175,000 2018 27 Sno Go Blower (Replace #0130) (Purchased 1987)Pub Works 150,000 150,000 2018 28 1-Ton Pickup (Replace #8345) (2007 Vehicle)Pub Works 48,000 7,000 (6)55,000 2018 29 Jetter (Replace #8445) (2006 Vehicle)Pub Works 92,500 92,500 25,000 (6)210,000 2018 30 Extend Utilities to UMore Pub Works 300,000 1,648,000 4,310,000 (7)6,258,000 994,000 855,660 822,500 243,741 330,000 2,800,000 300,000 1,648,000 0 58,000 102,500 92,500 0 4,656,500 12,903,401 Total CIP Funding Requirements - Year 2018 $2,672,160 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Lower Restroom Rehab & Paint Arena Ceiling funding comes from Arena Fund operations/reserves. (2)Koch Trail Restoration funding will come from a grant. Skate Park funding will come from the General Fund Parks Maintenance Budget. (3)Other funding for Squad Cars comes from auction sales of old vehicles. (4)Other funding for County Road 38 project for County's share and the City of Apple Valley's share of project are not included. Costs are for construction and are Rosemount's share only. (5)Other funding for Bonaire Path project are not included. Costs are Rosemount's share only. (6) Other funding for Public Works equipment comes from trade-in value of old vehicles. (7)Other funding for Extending Utilities to Umore will come from the University and the developer. Total Building CIP levy for 2018 is $24,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2018 is $843,856. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives. Total Equipment CIP levy for 2018 is $600,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 3 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2019 1 Replace Chiller Barrel Arena 55,000 (1)55,000 2019 2 Replace Cooling Tower Arena 75,000 (1)75,000 2019 3 PC Workstation Upgrades (From 2014) (Admin, Park & Rec)Finance 83,000 83,000 2019 4 Replace Air Compressor @ Station #1 Fire 60,000 60,000 2019 5 City-Wide Software Gen'l. Govt.25,000 25,000 2019 6 Baseline Fencing for 3 Fields Park & Rec 30,000 30,000 2019 7 Community Center / Armory Remodel Park & Rec 150,000 150,000 2019 8 Skate Park Upgrades - Phase 2 Park & Rec 65,000 (2)65,000 2019 9 Develop Park N-5 Park & Rec 200,000 200,000 2019 10 Squad Set Up and Equipment Installation Police 40,000 40,000 2019 11 3 Squads (Sell Back 3 - #3590, #35100 & #35110)Police 96,000 18,000 (3)114,000 2019 12 Replace Police Portable Radios (Encrypted)Police 138,000 138,000 2019 13 Pedestrian Improvements Program Pub Works 125,000 125,000 2019 14 PMP (O'Leary's A&B, Carrollton C, Oak Ridge Estates, 145th St. C)Pub Works 863,905 276,613 1,140,518 2019 15 Blower Attach for #8418 & #8420 (Replace #0123) (2008)Pub Works 7,500 7,500 2019 16 Bobcat Trailer (Replace #0503) (Purchased 1999)Pub Works 10,000 10,000 2019 17 1/2-Ton Ex-Cab Pickup (Replace #8346) (2006 Vehicle)Pub Works 29,000 6,000 (4)35,000 2019 18 Full Size Van - Park & Rec (Replace #8601) (2003 Vehicle)Pub Works 31,000 4,000 (4)35,000 2019 19 Bobcat (Replace #8418) (2008 Vehicle)Pub Works 45,000 5,000 (4)50,000 2019 20 Bobcat (Replace #8420) (2008 Vehicle)Pub Works 45,000 5,000 (4)50,000 2019 21 Pavement Roller (Replace #8129) (Purchased 2003)Pub Works 48,000 2,000 (4)50,000 2019 22 1-Ton Pickup w/Dump (Replace #8340) (2006 Vehicle)Pub Works 54,000 6,000 (4)60,000 2019 23 Sweeper (Replace #8443) (Purchased 2007)Pub Works 100,000 100,000 12,000 (4)212,000 2019 24 6" Trash Pump (Replace #8089) (Purchased 1995)Pub Works 7,000 7,000 8,000 22,000 2019 25 Generator (Replace #8057) (Purchased 1996)Pub Works 28,500 28,500 5,000 (4)62,000 2019 26 Utility Pickup w/Crane (Replace #8342) (2007 Vehicle)Pub Works 32,000 32,000 31,000 15,000 (4)110,000 2019 27 Water Storage Facility Pub Works 5,000,000 (5)5,000,000 2019 28 Water Treatment Facility Pub Works 8,500,000 8,500,000 (5)17,000,000 180,000 988,905 811,500 276,613 200,000 0 13,500,000 0 0 8,567,500 67,500 139,000 0 273,000 25,004,018 Total CIP Funding Requirements - Year 2019 $1,980,405 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Chiller Barrel & Cooler Tower funding comes from Arena Fund operations/reserves. (2)Skate Park funding will come from the General Fund Parks Maintenance Budget. (3)Other funding for Squad Cars comes from auction sales of old vehicles. (4)Other funding for Public Works equipment comes from trade-in value of old vehicles. (5)Funding for the Water Storage Facility and the Water Treatment Facility will come from a Water Revenue bond issue. Total Building CIP levy for 2019 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2019 is $877,610. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2019 is $620,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 4 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2020 1 Scoreboards Arena 40,000 (1)40,000 2020 2 Phone Server Replacements (From 2015)Finance 20,000 20,000 2020 3 Replace Fire Department Mobile Computers (From 2016)Finance 35,000 35,000 2020 4 PC File Server Replacements & Backup System (From 2015)Finance 120,000 120,000 2020 5 Aerial Platform Truck Replacement (Purchased in 2020)Fire (#)0 2020 6 City-Wide Software Gen'l. Govt.25,000 25,000 2020 7 Flint Hills Field Improvements - Phase 1 Park & Rec 2,100,000 2,100,000 2020 8 Replace 1/2 of AED's (5)Police 8,000 8,000 2020 9 Squad Set Up and Equipment Installation Police 52,000 52,000 2020 10 4 Squads (Sell Back 4 - #3540, #3550, #35150 & #35170)Police 128,000 24,000 (2)152,000 2020 11 Pedestrian Improvements Program Pub Works 125,000 125,000 2020 12 PMP (West Ridge A, Chippendale A)Pub Works 621,041 98,875 719,916 2020 13 Biscayne Avenue - Boulder Trail to CR 46 (1/2 from U of M)Pub Works 2,000,000 (3)2,000,000 2020 14 Ford Ranger - Inspections (Replace #8615) (2008 Vehicle)Pub Works 26,500 3,500 (4)30,000 2020 15 Single-Axle Dump Truck (Replace #8430) (2009 Vehicle)Pub Works 145,000 35,000 (4)180,000 2,100,000 746,041 559,500 98,875 0 2,000,000 0 0 0 0 0 0 0 102,500 5,606,916 Total CIP Funding Requirements - Year 2020 $3,405,541 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Scoreboards funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Biscayne Avenue project for the University of Minnesota are not included. Costs are Rosemount's share only. (The University needs a 2-year notice prior to project start) (4)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2020 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2020 is $912,715. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2020 is $640,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 5 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2021 1 Arena Refrigeration / Rink System Arena 375,000 (1)375,000 2021 2 Aerial Platform Truck Replacement (Year 1 of 5)Fire 252,000 252,000 2021 3 City-Wide Software Gen'l. Govt.25,000 25,000 2021 4 Flint Hills Field Improvements - Phase 2 Park & Rec 600,000 600,000 2021 5 Replace Less Lethal Weapons Police 6,000 6,000 2021 6 Squad Set Up and Equipment Installation Police 45,000 45,000 2021 7 Replace Squad Video System Police 120,000 120,000 2021 8 3 Squads (Sell Back 3 - #3530, #3570 & #35140)Police 100,000 18,000 (2)118,000 2021 9 Pedestrian Improvements Program Pub Works 125,000 125,000 2021 10 PMP (West Ridge C, Shannon Pond, Dodd, Biscayne B, >>)Pub Works 1,437,990 383,921 1,821,911 2021 11 Shop Hoist (Replace #0002) (Purchased 2006)Pub Works 55,000 5,000 (3)60,000 PMP (Cont.-Rosemount Hills B, Jay Simons) 600,000 1,562,990 603,000 383,921 0 0 0 0 0 0 0 0 0 398,000 3,547,911 Total CIP Funding Requirements - Year 2021 $2,765,990 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Arena Refrigeration / Rink System funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2021 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2021 is $949,223. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2021 is $660,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 6 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2022 1 Replace Zamboni Batteries Arena 15,000 (1)15,000 2022 2 Replace Compressors Arena 70,000 (1)70,000 2022 3 PC Workstation Upgrades (From 2017) (Police, Fire, P.W.)Finance 70,000 70,000 2022 4 Aerial Platform Truck Replacement (Year 2 of 5)Fire 252,000 252,000 2022 5 City-Wide Software Gen'l. Govt.25,000 25,000 2022 6 Central Park Improvements Park & Rec 1,200,000 1,200,000 2022 7 Replace Police Portable Radio Batteries Police 5,000 5,000 2022 8 Squad Set Up and Equipment Installation Police 45,000 45,000 2022 9 Replace Squad Laptops (5) / Printers / Netmotion Police 55,000 55,000 2022 10 3 Squads (Sell Back 3 - #3520, #3560 & #3580)Police 100,000 18,000 (2)118,000 2022 11 Pedestrian Improvements Program Pub Works 125,000 125,000 2022 12 PMP (Wensmann A/B/C, December Trail, Stonebridge, >>)Pub Works 2,408,824 752,215 3,161,039 2022 13 County Road 73 - Bonaire Path to IGH (Construction) Pub Works 2,500,000 (3)2,500,000 2022 14 Blower Attach for #8409 (Replace #0122) (2001) Pub Works 15,000 15,000 2022 15 Crash Attenuator (Replace #0049) (Purchased 2007)Pub Works 20,000 20,000 2022 16 Well #17 Construction Pub Works 1,500,000 (4)1,500,000 PMP (Cont.-Deepwoods, White Lake Acres) 1,200,000 2,533,824 587,000 752,215 0 2,500,000 1,500,000 0 0 0 0 0 0 103,000 9,176,039 Total CIP Funding Requirements - Year 2022 $4,320,824 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Zamboni Battery Replacements & Compressors funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for County Road 73 project for County's share and the City of Inver Grove Heights' share of project are not included. Costs are for construction and are Rosemount's share only. (4)Funding for Well #17 will come from a Water Revenue bond issue. Total Building CIP levy for 2022 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2022 is $987,192. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2022 is $680,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 7 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2023 1 Replace Ice Edger Arena 8,000 (1)8,000 2023 2 Replace Skate Tile Arena 90,000 (1)90,000 2023 3 Aerial Platform Truck Replacement (Year 3 of 5)Fire 252,000 252,000 2023 4 City-Wide Software Gen'l. Govt.25,000 25,000 2023 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2023 6 3 Squads (Sell Back 2 - #35100 & #35110 & 1 New Addition)Police 105,000 12,000 (2)117,000 2023 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2023 8 PMP (Geronime Pond, Town Center, Cameo & 143rd, McNamara)Pub Works 811,581 225,016 1,036,597 2023 9 Aerator (Replace #0157) (Purchased 2013)Pub Works 18,000 2,000 (3)20,000 2023 10 1-Ton Pickup Extended Cab (Replace #8330) (2011 Vehicle)Pub Works 30,000 10,000 (3)40,000 2023 11 1-Ton Pickup (Replace #8341) (2011 Vehicle)Pub Works 30,000 10,000 (3)40,000 2023 12 Generator (Replace #8059) (Purchased 2003)Pub Works 35,000 35,000 5,000 (3)75,000 0 936,581 505,000 225,016 0 0 0 0 0 35,000 35,000 0 0 137,000 1,873,597 Total CIP Funding Requirements - Year 2023 $1,441,581 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Edger & Skate Tile funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2023 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2023 is $1,026,680. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2023 is $700,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 8 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2024 1 Replace Skate Sharpener Arena 20,000 (1)20,000 2024 2 Replace Fire Department Mobile Computers (From 2020)Finance 35,000 35,000 2024 3 PC Workstation Upgrades (From 2019) (Admin, Park & Rec)Finance 70,000 70,000 2024 4 Aerial Platform Truck Replacement (Year 4 of 5)Fire 252,000 252,000 2024 5 City-Wide Software Gen'l. Govt.25,000 25,000 2024 6 Squad Set Up and Equipment Installation Police 45,000 45,000 2024 7 3 Squads (Sell Back 3 - #3510, #3540 & #3590)Police 105,000 18,000 (2)123,000 2024 8 Pedestrian Improvements Program Pub Works 125,000 125,000 2024 9 PMP (Boomfield B, O'Leary's Hills C, Connemara A, >>)Pub Works 1,222,832 305,817 1,528,649 2024 10 Groundsmaster Mower (Replace #8066) (Purchased 2015)Pub Works 87,000 8,000 (3)95,000 2024 11 Groundsmaster Mower (Replace #8073) (Purchased 2015)Pub Works 87,000 8,000 (3)95,000 2024 12 Single-Axle Dump Truck (Replace #8432) (2012 Vehicle)Pub Works 151,000 39,000 (3)190,000 PMP (Cont.-Auburn Ave., 145th St. A) 0 1,347,832 857,000 305,817 0 0 0 0 0 0 0 0 0 93,000 2,603,649 Total CIP Funding Requirements - Year 2024 $2,204,832 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Skate Sharpener funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2024 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2024 is $1,067,747. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2024 is $720,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 9 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2025 1 Phone Server Replacements (From 2020)Finance 20,000 20,000 2025 2 PC File Server Replacements & Backup System (From 2020)Finance 120,000 120,000 2025 3 Aerial Platform Truck Replacement (Year 5 of 5)Fire 252,000 252,000 2025 4 City-Wide Software Gen'l. Govt.25,000 25,000 2025 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2025 6 3 Squads (Sell Back 3 - #3570, 35140 & #35170)Police 110,000 18,000 (2)128,000 2025 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2025 8 PMP (Bloomfield A, West Ridge B, Country Hills A, >>)Pub Works 1,044,591 351,968 1,396,559 2025 9 Caravan - Parks (Replace #8603) (2013 Vehicle)Pub Works 31,500 3,500 (3)35,000 2025 10 Water Truck (Replace #8431) (2013 Vehicle)Pub Works 180,000 20,000 (3)200,000 2025 11 Dump Tandem (Replace #8434) (2013 Vehicle)Pub Works 195,000 35,000 (3)230,000 2025 12 Loader, Wing & Plow (Replace #8419) (Purchased 2005)Pub Works 275,000 50,000 (3)325,000 PMP (Cont.-Conley, Chippendale B) 0 1,169,591 1,253,500 351,968 0 0 0 0 0 0 0 0 0 126,500 2,901,559 Total CIP Funding Requirements - Year 2025 $2,423,091 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Arena item funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2025 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2025 is $1,110,457. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2025 is $740,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 10 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost 2026 1 Replace Ice Resurfacer Arena 120,000 (1)120,000 2026 2 Phone Server Replacements (From 2020)Finance 20,000 20,000 2026 3 PC File Server Replacements & Backup System (From 2020)Finance 120,000 120,000 2026 4 City-Wide Software Gen'l. Govt.25,000 25,000 2026 5 Squad Set Up and Equipment Installation Police 45,000 45,000 2026 6 3 Squads (Sell Back 3 - #3530, 3550 & #3580)Police 110,000 18,000 (2)128,000 2026 7 Pedestrian Improvements Program Pub Works 125,000 125,000 2026 8 PMP (Country Hills B, Hawkins Pond, Broback Park, >>)Pub Works 883,238 318,103 1,201,341 2026 9 John Deere Trailer (Replace #0525) (Purchased 2010)Pub Works 12,000 12,000 2026 10 Wood Chipper (Replace #8161) (Purchased 2014)Pub Works 45,000 5,000 (3)50,000 2026 11 Groundsmaster Mower (Replace #8068) (Purchased 2017)Pub Works 85,000 10,000 (3)95,000 2026 12 JD Tractor & Blower (Replace #8406 & #0128) (2006 & 2011)Pub Works 108,000 7,000 (3)115,000 PMP (Cont.-Biscayne A, Autumn Path) 0 1,008,238 570,000 318,103 0 0 0 0 0 0 0 0 0 160,000 2,056,341 Total CIP Funding Requirements - Year 2026 $1,578,238 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Ice Resurfacer funding comes from Arena Fund operations/reserves. (2)Other funding for Squad Cars comes from auction sales of old vehicles. (3)Other funding for Public Works equipment comes from trade-in value of old vehicles. Total Building CIP levy for 2026 is $0. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Street CIP levy for 2026 is $1,154,875. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). Total Equipment CIP levy for 2026 is $760,000. If there is a difference, the difference between this number and the number from above is a result of a 10-year funding program and other funding alternatives (such as potential SKB revenues). 11 of 11 MSA 12/2/16 Building Funds & Facilities Street Equipment Park Imp From Water Sewer Storm Water Sewer Storm Debt Serv Total Year Item - Description Department CIP CIP CIP Assess Fund State Core Core Core Utility Utility Utility Levy Other Cost Future 1 Public Works / City Hall Building Expansion / Police Council 4,000,000 (1)4,000,000 Future 2 Tender Truck (Addition) Fire 180,000 (2)180,000 Future 3 Engine Truck (Addition) Fire 700,000 (3)700,000 Future 4 Add Fire Station #3 (Same time as additional Engine Truck)Fire (3) Future 5 ADA Compliant Upgrades Study Park & Rec 20,000 20,000 Future 6 Community Center Covered Walk Park & Rec 175,000 175,000 Future 7 Splash Pad - Phase 2 Park & Rec 1,000,000 1,000,000 Future 8 Umore Ball Fields - Phase 2 Park & Rec 2,600,000 2,600,000 Future 9 Flint Hills Athletic Fields Improvements - Phases 2 & 3 Park & Rec 3,200,000 3,200,000 Future 10 TH 3 Aesthetic Improvements Pub Works 448,500 (5)448,500 Future 11 North Central Sanitary Sewer Extension Pub Works (6) Future 12 Street Construction - Boulder Avenue Extension Pub Works 3,000,000 (7)3,000,000 Future 13 Shannon Pond Outlet Pub Works (8) Future 14 Gravel Road Improvements Pub Works (8) 2027 15 1/2-Ton Pickup (Replace #8307) (2015 Vehicle)Pub Works 31,000 4,000 (9)35,000 2027 16 1/2-Ton Pickup (Replace #8335) (2015 Vehicle)Pub Works 31,000 4,000 (9)35,000 2027 17 1-Ton Pickup (Replace #8331) (2015 Vehicle)Pub Works 34,000 6,000 (9)40,000 2027 18 1-Ton Pickup (Replace #8332) (2015 Vehicle)Pub Works 35,000 5,000 (9)40,000 2027 19 Dump Single (Replace #8437) (2014 Vehicle)Pub Works 160,000 40,000 (9)200,000 Future 20 Soccer Goal Trailer (Replace #0501) (Purchased 1980)Pub Works 12,000 12,000 Future 21 Hose Trailer (Replace #0502) (Purchased 1990)Pub Works 12,000 12,000 Future 22 Barricade Trailer (Replace #0510) (Purchased 1986)Pub Works 12,000 12,000 Future 23 Hose Trailer (Replace #0517) (Purchased 1995)Pub Works 12,000 12,000 Future 24 Striper Trailer (Replace #0518) (Purchased 1994)Pub Works 12,000 12,000 Future 25 Easement Trailer (Replace #0521) (Purchased 2003)Pub Works 12,000 12,000 Future 26 Akron Avenue South of County Road 42 Pub Works 1,250,000 1,250,000 6,975,000 0 1,083,000 0 0 0 0 0 0 0 0 0 0 7,687,500 15,745,500 Total CIP Funding Requirements - Future Years $8,058,000 $0 (#)These items will be funded with the issuance of Equipment Certificates.$0 (1)Funding for the City Hall Expansion ($1,000,000) & PW Building Expansion ($3,000,000) will come from a general bond issue. (2)Funding and timing of purchase of Tender Truck (Addition) still to be determined. (3)Timing for Fire Station #3 and Additional Engine Truck still to be determined. (4)Other funding for Squad Cars comes from auction sales of old vehicles. (5)Other funding for TH 3 projects will come from grants or other incentives. (6)Future costs associated with the sanitary sewer will include extensive street reconstruction on the following streets: 124th St, 125th St, Blanca Ave W, 128th St, Bolivia Ave, 130th St W, Biscayne Ave, Bengal Ave, 129th St W, CR 38, 132nd Court and Bonnaire Path. Costs and funding are not available at this time. (7)Other funding for Boulder Avenue extension will come from a Port Authority bond issue. (8)Costs and funding are not available at this time. (9)Other funding for Public Works equipment comes from trade-in value of old vehicles.