Loading...
HomeMy WebLinkAbout6.k. Change Order #1 - Connemara Trail Overpass, City Project #379AGENDA ITEM: Change Order #1 Connemara Trail Overpass, City Project #379 AGENDA SECTION: Consent PREPARED BY: Andrew J Brotzler, P.E., City Engineer AGE .P w 6 Y ATTACHMENTS: Change Order #1 APPROVED BY/�1/ RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Conn mara Trail Overpass, City Project #379, and Authorize the Necessary Signatures. 4ROSEMOUNT CITY COUNCIL City Council Meeting: September 6, 2005 BACKGROUND: Change Order #1, Connemara Trail Overpass, City Project #379 includes the addition of 59 days to the ongmal completion date of September 2, 2005 The revised contract completion date is proposed to be November 1, 2005 The proposed change in the contract completion date is a result of delays in material dchvery The materials that are currently backlogged are the decorative streetlights. It is estimated that the streetlights will be delivered and installed by mud- October. These decorative streethghts are not a necessity for safety m regards to traffic and pedestnan operations. The Connemara Trail Overpass is substantially complete with the exception of the streethghts and was opened to traffic on Friday, August 12, 2005, therefore, Staff recommends Council approve Change Order #1 for a contract completion date extension. SUMMARY: Staff requests Council approval of Change Order #1. EXECUTIVE SUMMARY G \ENGPROJ \379 \ChangeOrderlCC9 -6 -05 doc CONNEMARA TRAIL BRIDGE (STA. 72 +00 00 to STA 76 +50 00) STREET AND BRIDGE CONSTRUCTION AND APPURTENANT WORK CITY OF ROSEMOUNT, MN CITY PROJECT NO. 379 WSB PROJECT NO 1561 -00 OWNER. CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION THE COMPLETION DATE FOR CONNEMARA TRAIL BRIDGE HAS BEEN REVISED TO NOVEMBER 1, 2005 IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE PREVIOUS CHANGE ORDERS N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER NET INCREASE /DECREASE OF THIS CHANGE ORDER CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS RECOMMENDED BY APPROVED BY ENGINEER CITY ENGINEER WSB ASSOCIATES, INC DATE OF COUNCIL ACTION iz CHANGE ORDER NO.7 $1,491,27245 $0 00 $1,491,27245 $0 00 $1,491,272 45 CONTRACTOR. LUNDA CONSTRUCTION CO. 620 GEBHARDT ROAD BLACK RIVER FALLS, WI 54615 CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME NET CHANGE FROM PREVIOUS CHANGE ORDERS CONTRACT TIME PRIOR TO THIS CHANGE ORDER NET INCREASE OF CHANGE ORDER CONTRACT TIME WITH APPROVED CHANGE ORDERS APPROVED BY LUNDA CONSTRUCTION CO CONTRACTOR CITY ADMINISTRATOR SEPTEMBER 6, 2005 1561 CO 9/2/2005 N/A 9/2/2005 59 Days 11/1/2005