HomeMy WebLinkAbout6.k. Change Order #1 - Connemara Trail Overpass, City Project #379AGENDA ITEM: Change Order #1 Connemara Trail
Overpass, City Project #379
AGENDA SECTION:
Consent
PREPARED BY: Andrew J Brotzler, P.E., City Engineer AGE .P w 6 Y
ATTACHMENTS: Change Order #1
APPROVED BY/�1/
RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Conn mara Trail
Overpass, City Project #379, and Authorize the Necessary Signatures.
4ROSEMOUNT
CITY COUNCIL
City Council Meeting: September 6, 2005
BACKGROUND:
Change Order #1, Connemara Trail Overpass, City Project #379 includes the addition of 59 days to the
ongmal completion date of September 2, 2005 The revised contract completion date is proposed to be
November 1, 2005 The proposed change in the contract completion date is a result of delays in material
dchvery The materials that are currently backlogged are the decorative streetlights. It is estimated that the
streetlights will be delivered and installed by mud- October.
These decorative streethghts are not a necessity for safety m regards to traffic and pedestnan operations.
The Connemara Trail Overpass is substantially complete with the exception of the streethghts and was
opened to traffic on Friday, August 12, 2005, therefore, Staff recommends Council approve Change Order
#1 for a contract completion date extension.
SUMMARY:
Staff requests Council approval of Change Order #1.
EXECUTIVE SUMMARY
G \ENGPROJ \379 \ChangeOrderlCC9 -6 -05 doc
CONNEMARA TRAIL BRIDGE (STA. 72 +00 00 to STA 76 +50 00)
STREET AND BRIDGE CONSTRUCTION AND APPURTENANT WORK
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 379
WSB PROJECT NO 1561 -00
OWNER.
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
THE COMPLETION DATE FOR CONNEMARA TRAIL BRIDGE HAS BEEN REVISED TO NOVEMBER 1, 2005
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE,
OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE
PREVIOUS CHANGE ORDERS N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER
NET INCREASE /DECREASE OF THIS CHANGE ORDER
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS
RECOMMENDED BY
APPROVED BY
ENGINEER
CITY ENGINEER
WSB ASSOCIATES, INC
DATE OF COUNCIL ACTION
iz
CHANGE ORDER NO.7
$1,491,27245
$0 00
$1,491,27245
$0 00
$1,491,272 45
CONTRACTOR.
LUNDA CONSTRUCTION CO.
620 GEBHARDT ROAD
BLACK RIVER FALLS, WI 54615
CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT TIME
NET CHANGE FROM PREVIOUS CHANGE ORDERS
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE OF CHANGE ORDER
CONTRACT TIME WITH APPROVED CHANGE ORDERS
APPROVED BY
LUNDA CONSTRUCTION CO
CONTRACTOR
CITY ADMINISTRATOR
SEPTEMBER 6, 2005
1561 CO
9/2/2005
N/A
9/2/2005
59 Days
11/1/2005