Loading...
HomeMy WebLinkAbout6.p. Receive Feasibility Report and Authorize 2017 Street Improvements ProjectI:\City Clerk\Agenda Items\Approved Items\6.p. Receive Feasibility Report and Authorize 2017 Street Improvements Project.docx EXECUTIVE SUMMARY City Council Regular Meeting: December 20, 2016 AGENDA ITEM: Receive Feasibility Report and Authorize the Preparation of Plans and Specifications– 2017 Street Improvements Project, City Project 470 AGENDA SECTION: Consent PREPARED BY: Mitch Hatcher, Project Engineer AGENDA NO. 6.p. ATTACHMENTS: Feasibility Report; Resolution; Final Design Proposal; Maps APPROVED BY: ddj RECOMMENDED ACTIONS: Motion to Adopt a Resolution Receiving the Feasibility Report and Authorize the Preparation of Plans and Specifications for the 2017 Street Improvements Project, City Project 470. ISSUE: Consider receiving the feasibility report and authorizing the preparation of plans and specifications for the 2017 Street Improvements Project. BACKGROUND: At the May 3, 2016 regular Council meeting, the Council authorized the preparation of the Feasibility Report for the 2017 Street Improvements, City Project 470. On November 16, 2016, a neighborhood informational open house was held to present the project and solicit feedback from the neighborhoods. Detailed project information is included in the attached Feasibility Report. A map illustrating the project area and proposed improvements is also attached. The estimated engineering fee for final design is $56,950. This includes the following activities. • Preparation of plans and specifications • Preparation of construction estimates • Preparation of bidding documents, advertisement for bids, and recommendations on award of bids The attached proposal from WSB & Associates details the scope and fee for final design. The preliminary estimated construction cost is $1,072,000, this represents an estimated fee percentage of 5.3%. A full presentation of the proposed improvements will be made at the Public Improvement Hearing and Assessment Hearing for the project. These public hearings are tentatively scheduled for May 20, 2014. SUMMARY: Staff recommends Council adoption of the attached resolution receiving the feasibility report and authorizing the preparation of plans and specifications for the 2017 Street Improvement Project, City Project 470. FEASIBILITY REPORT 2017 STREET IMPROVEMENT PROJECT CITY OF ROSEMOUNT | DAKOTA COUNTY | MINNESOTA DECEMBER 20, 2016 Prepared for: City of Rosemount 2875 145th Street West Rosemount, MN 55068 CITY OF ROSEMOUNT PROJECT NO. 470 WSB PROJECT NO. 2235-100 Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 FEASIBILITY REPORT 2017 STREET IMPROVEMENT PROJECT CITY PROJECT NO. 470 FOR THE CITY OF ROSEMOUNT, MINNESOTA December 20, 2016 Prepared By:    540 Gateway Boulevard | Suite 100 | Burnsville, MN 55337 | (952) 737-4660     Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com  December 20, 2016 Honorable Mayor and City Council City of Rosemount 2875 – 145th Street West Rosemount, MN 55068 Re: Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Dear Honorable Mayor and City Council Members: Transmitted herewith for your review is a feasibility report which addresses improvements associated with the 2017 Street Improvement Project. I am available at your convenience to discuss this report. Please do not hesitate to contact me at 763- 287-8528 if you have any questions regarding this report. Sincerely, WSB & Associates, Inc. Krista L. Anderson, PE Project Manager Attachment Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 CERTIFICATION I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Krista L. Anderson, PE Date: December 20, 2016 Lic. No. 46632 Prepared By: Mitchell L. Hatcher, EIT Date: December 20, 2016 Quality Control Review Completed By: Monica R. Heil, PE Date: December 20, 2016 Lic. No. 47497 Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 TABLE OF CONTENTS TITLE SHEET LETTER OF TRANSMITTAL CERTIFICATION SHEET TABLE OF CONTENTS 1. EXECUTIVE SUMMARY ................................................................................................................. 1 2. STREET IMPROVEMENT PROGRAM ........................................................................................... 2 2.1 Introduction ......................................................................................................................... 2 2.1.1 Authorization .......................................................................................................... 2 2.1.2 Scope ..................................................................................................................... 2 2.1.3 Data Available ........................................................................................................ 2 2.2 General Background ........................................................................................................... 3 2.2.1 Project Location ..................................................................................................... 3 2.2.2 Project History ........................................................................................................ 4 2.3 Existing Conditions/Proposed Improvements ..................................................................... 5 2.3.1 Shannon Hills ......................................................................................................... 5 2.3.2 Shannon Parkway .................................................................................................. 6 2.3.3 Jaycee Park Parking Lot Surface Improvements ................................................... 7 2.3.4 Municipal Utilities ................................................................................................... 7 2.3.5 Jaycee Park Parking Lot Storm Sewer Improvements .......................................... 8 2.3.6 Trail Improvements: Shannon Parkway ................................................................ 8 2.3.7 Bicycle Facilities: Shannon Parkway .................................................................... 9 2.4 Permits/Approvals ............................................................................................................... 9 2.5 Construction Traffic ............................................................................................................. 9 2.6 Public Involvement .............................................................................................................. 9 3. FINANCING ................................................................................................................................... 10 3.1 Opinion of Cost ................................................................................................................. 10 3.2 Funding ............................................................................................................................. 10 4. PROJECT SCHEDULE ................................................................................................................. 12 5. FEASIBILITY AND RECOMMENDATION .................................................................................... 13 Appendix A Opinion of Probable Cost Appendix B Preliminary Assessment Maps Preliminary Assessment Roll Assessment Calculations Appendix C Shannon Parkway Geotechnical Report Appendix D Public Comments Summary Appendix E Seal Coat Map Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 1 1. EXECUTIVE SUMMARY The 2017 Street Improvement Project, City Project 470, was initiated based on the City’s Pavement Management Program. Streets proposed for improvements in 2017 are based on the current roadway conditions and the overall Capital Improvement Program budget. The following improvements are proposed as part of the 2017 Street Improvement Project. Reclamation:  Shannon Parkway: CSAH 42 to CSAH 46  Jaycee Park Parking Lot Mill and Overlay:  Shannon Hills o Cobbler Avenue: Shannon Parkway east to 143rd Street West o Crocus Way: Cranberry Way east to Cobbler Avenue o Cranberry Way: Shannon Parkway east to 143rd Street West o Clover Lane: Cobbler Lane east to Evermoor Wicklow Addition Seal coat on select roadways:  Shannon Parkway: 145th Street West to Connemara Trail  Crandall Avenue West: 147th Street West south to Upper 149th Street West  Crestview Avenue West: 147th Street West south to Upper 149th Street West  147th Street West: Crestview Avenue West east to Covington Avenue  149th Street West: Shannon Parkway east to Crestview Avenue  Upper 149th Street West: Crestview Avenue east to Crandall Avenue West  Covington Avenue: Dodd Boulevard south to 147th Street West Storm sewer improvements:  Jaycee Parking Lot Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 2 2. STREET IMPROVEMENT PROGRAM 2.1 Introduction 2.1.1 Authorization On May 3, 2016, the Rosemount City Council authorized the preparation of an engineering feasibility report for the 2017 Street Improvement Project. This project has been designated as City Project No. 470. 2.1.2 Scope The 2017 Street Improvement Project is a continuation of the City’s 2010 initiative to prioritize Pavement Management funding for reconstruction, mill and overlay and seal coat projects focused on long-term preservation of the roadway network. Improvements within this report have been proposed to address these pavement distresses in accordance with the City’s Pavement Management Plan. Roadways identified for improvements based on the 2016 Rosemount Overall Condition Index (OCI) include: Reclamation:  Shannon Parkway: CSAH 42 to CSAH 46 Mill and Overlay:  Shannon Hills o Cobbler Avenue: Shannon Parkway east to 143rd Street West o Crocus Way: Cranberry Way east to Cobbler Avenue o Cranberry Way: Shannon Parkway east to 143rd Street West o Clover Lane: Cobbler Lane east to Evermoor Wicklow Addition Seal coat on select roadways:  Shannon Parkway: 145th Street West to Connemara Trail  Crandall Avenue West: 147th Street West south to Upper 149th Street West  Crestview Avenue West: 147th Street West south to Upper 149th Street West  147th Street West: Crestview Avenue West east to Covington Avenue  149th Street West: Shannon Parkway east to Crestview Avenue  Upper 149th Street West: Crestview Avenue east to Crandall Avenue West  Covington Avenue: Dodd Boulevard south to 147th Street West In addition to the roadway improvements above, the following improvements are also reviewed within this report:  Jaycee Park Parking Lot reclamation  Jaycee Park parking lot storm sewer improvements 2.1.3 Data Available Information and materials used in the preparation of this report include the following:  City of Rosemount Utility Plans  City of Rosemount Record Plans  City of Rosemount Transportation Plan, WSB & Associates, Inc., dated April 2008  City of Rosemount Pedestrian and Bicycle Master Plan, Hoisington Koegler Group, dated November 1, 2010  Field Observations of the Area and Discussions with City staff  Private Utility Maps  Soil Borings and Geotechnical Report  City of Rosemount Assessment/Improvement Policy Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 3 2.2 General Background 2.2.1 Project Location Roadways proposed for reconstruction or mill and overlay improvement with this project are listed below: Reclamation:  Shannon Parkway: CSAH 42 to CSAH 46  Jaycee Park Parking Lot: west of and adjacent to that portion of Shannon Parkway to be reclaimed Mill and Overlay:  Shannon Hills o Cobbler Avenue: Shannon Parkway east to 143rd Street West o Crocus Way: Cranberry Way east to Cobbler Avenue o Cranberry Way: Shannon Parkway east to 143rd Street West o Clover Lane: Cobbler Lane east to Evermoor Wicklow Addition Seal coat on select roadways:  Shannon Parkway: 1 45th Street West to Connemara Trail  Crandall Avenue West: 147th Street West south to Upper 149th Street West  Crestview Avenue West: 147th Street West south to Upper 149th Street West  147th Street West: Crestview Avenue West east to Covington Avenue  149th Street West: Shannon Parkway east to Crestview Avenue  Upper 149th Street West: Crestview Avenue east to Crandall Avenue West  Covington Avenue: Dodd Boulevard south to 147th Street West Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 4 Location Map 2.2.2 Project History This project was initiated through the continued development and implementation of the Rosemount Pavement Management Program (PMP). Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 5 2.3 Existing Conditions/Proposed Improvements 2.3.1 Shannon Hills Existing Surface Conditions Shannon Hills is located north of 143rd Street West and east of Shannon Parkway. The roadways within this neighborhood generally consist of 32-foot-wide urban street sections with surmountable concrete curb and gutter. The existing right-of-way widths for the streets within this neighborhood are 60 feet. Figure 1 below is a listing of roadway segments within the Shannon Hills neighborhood Roadways within Shannon Hills are aging and experiencing differing severities of edge, longitudinal, and transverse cracking. Additionally, certain locations of the development are experiencing pavement stripping at the interface between the pavement surface and the seal coat. To date, this deterioration is only occurring in the upper portion of the pavement. The photo below illustrates some of the varying levels of pavement distresses found along Crocus Way. Crocus Way near Cranberry Way Figure 1: Shannon Hills Street Name Length (feet) From To Year Constructed Cobbler Avenue 2200 Shannon Parkway 143rd Street West 1993 Crocus Way 1250 Cranberry Way Cobbler Avenue 1993 Cranberry Way 1250 Shannon Parkway 143rd Street West 1992 Clover Lane 400 Cobbler Ave 1994 Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 6 Proposed Surface Improvements Streets within the Shannon Hills area are proposed for a full width 2-inch pavement mill and overlay along with spot curb and gutter replacement with structurally deficient curb being replaced. Spot curb and gutter replacement will be completed based on a field review of the site during final design. 2.3.2 Shannon Parkway Existing Surface Conditions Shannon Parkway is an urban street with barrier style concrete curb and gutter, and varies in width from 40- to 58-feet. The existing right-of-way width along Shannon Parkway varies from 80- to 100-feet. Figure 2 below is a listing of the roadway segments along Shannon Parkway Figure 2: Shannon Parkway Street Name Length (feet) From To Year Constructed* Shannon Parkway 5100 CSAH 46 CSAH 42 1988 * Estimated date of wear course paving Typical pavement distresses along Shannon Parkway include differing severities of edge cracking, longitudinal cracking, and transverse cracking. Shannon Parkway is also experiencing an increasing amount of pavement stripping at the interface between the pavement surface and the seal coat. Soil borings were completed by WSB & Associates, Inc. in the summer of 2016. The information provided from the borings show the average pavement thickness along Shannon Parkway to be 4.75 inches. A copy of the Geotechnical report and the can be found in Appendix C. Proposed Surface Improvements Full depth reclamation of the existing aggregate base and bituminous street section is proposed for the entire length of Shannon Parkway and includes a new 5-inch bituminous mat, over 7 inches of MnDOT Class 5 aggregate base, and geotextile fabric per recommendations in the Geotechnical Report prepared by WSB & Associates, Inc. Additional pavement analysis, including road specific flexible pavement design will be completed with the final design. Spot curb and gutter replacement is proposed to be completed along Shannon Parkway with structurally deficient curb being replaced. Spot curb and gutter replacement will be completed based on a field review of the site during final design. Recommended improvements along Shannon Parkway also include striping for designated bike lanes as proposed in the City’s Pedestrian and Bicycle Master Plan. Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 7 2.3.3 Jaycee Park Parking Lot Surface Improvements Existing Surface Conditions Jaycee Park parking lot is aging and experiencing severities of distress including block, alligator, and longitudinal cracking along with localized drainage issues. The photo below illustrates some of the pavement distress within the parking lot. Jaycee Park parking lot looking north Proposed Surface Improvements Full depth reclamation of the existing bituminous pavement, adding aggregate as necessary, prior to paving a new 3 ½-inch bituminous mat is proposed for the entire parking lot. Minor adjustments to grades within the parking lot are proposed to improve drainage conditions. 2.3.4 Municipal Utilities Existing Conditions The existing sanitary sewer and water main facilities located within Shannon Hills and along Shannon Parkway have been preliminarily inspected by the Public Works Department and determined to be in fair condition. Further investigation of utilities with the Public Works Department will take place during final design. Numerous storm sewer and sanitary manhole castings within Shannon Hills and along Shannon Parkway do not meet the current City standards, making the manholes difficult to access and/or allow stormwater inflow to occur during rain events. Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 8 Proposed Improvements Storm sewer and sanitary sewer manhole castings that do not meet current City standards are proposed to be removed and replaced. Additionally, manhole castings with rings in poor condition are proposed to be replaced through a casting adjustment which will help to mitigate ongoing inflow/infiltration issues. All storm sewer and sanitary sewer castings meeting City standards will remain in place. Water main valve box grade adjustments will be completed with the project to match the new final grades. Damaged valve boxes are proposed to be repaired or replaced as necessary. 2.3.5 Jaycee Park Parking Lot Storm Sewer Improvements Existing Condition The existing storm sewer catch basin in the southeast corner of the parking lot is connected to a french drain tile system for the parking lot that does not function properly. Water and sediment collect here and City maintenance staff has to clean and vacuum out the area several times a year. Proposed Improvements Improvements include adding a sump catch basin inlet at the southeast corner to replace the existing french drain system. This new storm sewer catch basin will connect into the existing storm sewer system along Shannon Parkway. Jaycee Parking Lot Improvements 2.3.6 Trail Improvements: Shannon Parkway Trails exist along both sides of Shannon Parkway from 160th Street West (CSAH 46) to 150th Street West (CSAH 42). Minor improvements are needed at existing pedestrian ramps to meet current ADA requirements. No other trail surface improvements are proposed as a part of this project. Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 9 2.3.7 Bicycle Facilities: Shannon Parkway North of CSAH 42, Shannon Parkway consists of 11-foot wide travel lanes with 5-foot wide designated striped bicycle lanes along both sides of the roadway. It is proposed to continue the on-street bicycle lanes along Shannon Parkway south of CSAH 42 to CSAH 46. The bicycle lanes will be stopped short of vehicular turn lanes, similar to what exists north of CSAH 42. The new striping configuration will include 13-foot wide travel lanes and 5-foot bicycle lanes within the existing 40- to 58-foot wide roadway. On street parking is not allowed on Shannon Parkway and is not proposed to be modified. Bike lanes will be striped and signs placed along the roadway indicating the shared use with bicycles. 2.4 Permits/Approvals The National Pollution Discharge Elimination Systems (NPDES) General Stormwater Permit for Construction Activity from the Minnesota Pollution Control Agency (MPCA) may be required to complete the improvements as proposed. Further review will be completed in final design. A Dakota County Work in the Right-of-Way General Excavation Permit will be required for work within County right-of-way along Shannon Parkway, including: 150th Street West/CSAH 42 and 160th Street West/CSAH 46. A Dakota County Work in Right-of-Way user registration will be required for the contractor that may use any county roads (i.e. 150th Street West/CSAH 42 and 160th Street West/CSAH 46) as a haul route for the project. 2.5 Construction Traffic The traffic control plan for Shannon Parkway will be discussed with city staff during final design, but road closures to thru traffic may be needed for select times throughout the project for concrete, reclaiming, paving, and striping work. It is anticipated that the section of Shannon Parkway from 150th Street/CSAH 42 to 151st Street will be phased to minimize the impacts to traffic signal at 150th Street/CSAH 42 and the effect on surrounding businesses. General construction traffic will include an increase in truck traffic on the streets adjacent to the construction area. Residents and businesses will have access to their driveways and properties during construction. Curb replacement directly in front of driveways may temporarily limit access. Property owners with this situation will be contacted prior to construction to determine how alternate access can be provided. 2.6 Public Involvement A public informational meeting was held on November 16, 2016 for the 2017 Street Improvement Project. The proposed improvements, costs, funding, schedule, and construction impacts were presented to approximately 25 attendees. Comment cards were made available to attendees at the meeting. A summary of the comments received is provided in Appendix D. Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 10 3. FINANCING 3.1 Opinion of Cost Detailed opinions of cost can be found in Appendix A of this report. The opinions of cost incorporate estimated 2017 construction costs and include 5% contingency and 20% for all related indirect costs (legal, administrative, engineering, and financing items) for Shannon Parkway, Shannon Hills, and Jaycee Park. The opinions of cost for the Pavement Management Maintenance Program incorporate estimated 2017 construction costs and include 5% for all related indirect costs (legal, administrative, engineering, and financing items). Table 1 below provides a summary of the opinions of cost for the 2017 improvements: Table 1: Summary of Costs Shannon Parkway Improvements $838,500 Shannon Hills Improvements $318,600 Jaycee Park Parking Lot Surface Improvements $112,700 Jaycee Park Parking Lot Storm Sewer Improvements $16,700 Pavement Management Maintenance Program (Seal Coating) $38,900 Total $1,325,300 3.2 Funding Special Assessments are determined as set forth by the City’s Assessment Policy and current fee resolution. The City of Rosemount’s 2013 Fee Resolution identifies the street assessment rate for overlay projects as 35% of the total improvement cost. Improvements along Shannon Parkway are proposed to be funded with State Aid funds. A summary of the proposed assessment calculations can be found in Appendix B. A combination of Special Assessments, Street CIP funds, Storm Sewer Utility funds, and Parking Lot Maintenance funds are proposed to fund the project. Table 2 below provides a summary of the estimated assessments. Table 2: Estimated Assessments Rate Assessment Units/FF Total Assessment Shannon Parkway: Single Family 35% $2,385 / Unit 3 Units $7,200 Shannon Parkway: Commercial 35% $31 / FF 554 FF $17,300 Shannon Hills 35% $1,100 / Unit 102 Units $112,200 Total $136,700 Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 11 Table 3 below provides a summary of the anticipated funding for the proposed improvements. Table 3: Estimated Funding Street/Area Name Street Capital Improvement Fund Storm Utility Fund Special Assessments Parking Lot Maintenance Fund Total Shannon Parkway $814,000 $0 $24,500 $0 $838,500 Shannon Hills $206,400 $0 $112,200 $0 $318,600 Jaycee Park Parking Lot Surface Improvements $0 $0 $0 $112,700 $112,700 Jaycee Park Parking Lot Storm Sewer Improvements $0 $16,700 $0 $0 $16,700 Pavement Management Program Maintenance (Seal Coating) $38,900 $0 $0 $0 $38,900 Totals $1,059,300 $16,700 $136,700 $112,700 $1,325,300 Street Capital Improvement fund is proposed to fund project costs associated with reclamation improvements, mill and overlay improvements, and the City’s annual seal coat program. Parking Lot Maintenance funds are proposed to be used to fund the Jaycee Park Parking Lot improvements. Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 12 4. PROJECT SCHEDULE The proposed project schedule for the improvements is as follows: Receive Feasibility Report/Order Plans and Specifications ..................................... December 20, 2016 Receive Final Plans and Specifications/Authorize Advertisement for Bids ................. February 21, 2017 Open Bids/Compute Assessments .................................................................................. March 24, 2017 Declare Costs/Set Assessment Hearing/Set Improvement Hearing .................................... April 4, 2017 Receive Bids/Improvement and Assessment Hearing/Award Contract ............................... May 2, 2017 Begin Construction .............................................................................................................. June 1, 2017 Feasibility Report 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 Page 13 5. FEASIBILITY AND RECOMMENDATION The following improvements are proposed as part of the 2017 Street Improvement Project: Reclamation:  Shannon Parkway: CSAH 42 to CSAH 46 Mill and Overlay:  Shannon Hills: o Cobbler Avenue o Crocus Way o Cranberry Way o Clover Lane Seal coat on select roadways:  Shannon Parkway: 145th Street West to Connemara Trail  Crandall Avenue West  Crestview Avenue West  147th Street West  149th Street West  Upper 149th Street West  Covington Avenue Parking Lot Improvements:  Jaycee Parking Lot The project is feasible, necessary, and cost-effective from an engineering standpoint. It is our recommendation that the improvements be implemented as outlined in this report. Feasibility Report APPENDIX 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 APPENDIX A Opinion of Probable Cost WSB Project:2017 Street Improvement Project Design By:MLH Project Location:City of Rosemount Checked By:KLA City Project No.:470 WSB Project No:02235-100 Date:12/9/2016 Item No. MN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 2021.501 MOBILIZATION (5% MAXIMUM) LUMP SUM 1 32,000.00$ 32,000.00$ 2104.501 REMOVE CURB AND GUTTER LIN FT 1,200 5.00$ 6,000.00$ 2104.503 REMOVE CONCRETE WALK SQ FT 800 1.50$ 1,200.00$ 2104.503 REMOVE BITUMINOUS WALK SQ FT 2,100 1.00$ 2,100.00$ 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 200 5.00$ 1,000.00$ 2104.505 REMOVE CONCRETE VALLEY GUTTER SQ YD 25 10.00$ 250.00$ 2104.509 REMOVE SIGN EACH 52 40.00$ 2,080.00$ 2104.509 REMOVE CASTING (SANITARY) EACH 3 75.00$ 225.00$ 2104.509 REMOVE CASTING (STORM) EACH 17 75.00$ 1,275.00$ 2104.509 REMOVE CASTING (CATCH BASIN) EACH 5 75.00$ 375.00$ 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 1,200 2.50$ 3,000.00$ 2104.601 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES EACH 2 800.00$ 1,600.00$ 2105.501 COMMON EXCAVATION CU YD 200 20.00$ 4,000.00$ 2105.522 SELECT GRANULAR BORROW (CV) CU YD 200 12.00$ 2,400.00$ 2211.501 AGGREGATE BASE CLASS 5 MOD TON 200 18.00$ 3,600.00$ 2215.501 FULL DEPTH RECLAMATION SQ YD 25,500 2.50$ 63,750.00$ 2232.501 MILL BITUMINOUS SURFACE (1.5") (P) SQ YD 2,000 1.25$ 2,500.00$ 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 2,600 3.00$ 7,800.00$ 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 2,900 58.00$ 168,200.00$ 2360.502 TYPE SP 12.5 NON WEARING COURSE MIX (2,C) TON 4,400 55.00$ 242,000.00$ 2360.503 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 3.0'' THICK SQ YD 200 25.00$ 5,000.00$ 2504.602 IRRIGATION SYSTEM REPAIR EACH 2 200.00$ 400.00$ 2504.602 ADJUST VALVE BOX EACH 5 250.00$ 1,250.00$ 2504.602 RECONSTRUCT VALVE BOX EACH 10 500.00$ 5,000.00$ 2504.516 CASTING ASSEMBLY (SANITARY) EACH 3 800.00$ 2,400.00$ 2505.516 CASTING ASSEMBLY (STORM) EACH 17 600.00$ 10,200.00$ 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 5 700.00$ 3,500.00$ 2506.522 ADJUST FRAME AND RING CASTING (SANITARY) EACH 0 450.00$ -$ 2506.522 ADJUST FRAME AND RING CASTING (STORM) EACH 3 400.00$ 1,200.00$ 2506.522 ADJUST FRAME AND RING CASTING (CATCH BASIN) EACH 30 250.00$ 7,500.00$ 2521.501 4'' CONCRETE WALK SQ FT 2,900 4.50$ 13,050.00$ 2531.501 CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 1,200 16.00$ 19,200.00$ 2531.507 6" CONCRETE DRIVEW AY PAVEMENT SQ YD 200 55.00$ 11,000.00$ 2531.604 7" CONCRETE VALLEY GUTTER SQ YD 25 55.00$ 1,375.00$ 2531.618 TRUNCATED DOMES SQ FT 352 35.00$ 12,320.00$ 2531.618 ADA COMPLIANCE SUPERVISOR LUMP SUM 1 250.00$ 250.00$ 2557.602 REPAIR DOG FENCE EACH 2 100.00$ 200.00$ 2563.601 TRAFFIC CONTROL LUMP SUM 1 6,000.00$ 6,000.00$ 2564.602 F&I SIGN PANEL TYPE C EACH 52 150.00$ 7,800.00$ 2573.530 STORM DRAIN INLET PROTECTION EACH 40 125.00$ 5,000.00$ 2575.605 HYDROSEEDING (INCL. TOPSOIL, FERTILIZER, SEED 25-131) SQ YD 1,500 5.00$ 7,500.00$ 2582.501 PAVEMENT MESSAGE (LEFT ARROW) EPOXY EACH 6 125.00$ 750.00$ 2582.501 PAVEMENT MESSAGE (RIGHT ARROW) EPOXY EACH 4 125.00$ 500.00$ Opinion of Probable Cost A1. SHANNON PARKWAY IMPROVEMENTS Item No. MN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 2582.502 4'' SOLID LINE WHITE - EPOXY LIN FT 8,300 0.40$ 3,320.00$ 2582.502 4'' DOUBLE SOLID LINE YELLOW - EPOXY LIN FT 4,700 0.50$ 2,350.00$ 2582.502 8" SOLID LINE WHITE - EPOXY LIN FT 210 1.50$ 315.00$ 2582.502 12" SOLID LINE WHITE - EPOXY LIN FT 150 3.00$ 450.00$ 2582.502 24" SOLID LINE YELLOW - EPOXY LIN FT 100 5.00$ 500.00$ 2582.503 CROSSWALK MARKING - EPOXY SQ FT 720 5.00$ 3,600.00$ Schedule A - Shannon Parkway Improvements $665,500.00 + 5% Contingencies $33,275.00 Total - Schedule A - Shannon Parkway Improvements $698,775.00 2104.501 REMOVE CURB AND GUTTER LIN FT 240 11.00$ 2,640.00$ 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 30 4.00$ 120.00$ 2105.501 COMMON EXCAVATION CU YD 250 20.00$ 5,000.00$ 2105.522 SELECT GRANULAR BORROW (CV) CU YD 250 12.00$ 3,000.00$ 2211.501 AGGREGATE BASE CLASS 5 MOD TON 50 18.00$ 900.00$ 2215.501 FULL DEPTH RECLAMATION SQ YD 4,900 2.50$ 12,250.00$ 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 500 2.50$ 1,250.00$ 2360.501 TYPE SP 12.5 WEARING COURSE MIXTURE (2,C) TON 420 58.00$ 24,360.00$ 2360.502 TYPE SP 12.5 NON WEARING COURSE MIX (2,C) TON 550 55.00$ 30,250.00$ 2506.522 ADJUST FRAME AND RING CASTING (STORM) EACH 3 300.00$ 900.00$ 2506.522 ADJUST FRAME AND RING CASTING (SANITARY) EACH 1 350.00$ 350.00$ 2531.501 CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 240 17.00$ 4,080.00$ 2563.601 TRAFFIC CONTROL LUMP SUM 1 2,000.00$ 2,000.00$ 2573.530 STORM DRAIN INLET PROTECTION EACH 3 125.00$ 375.00$ 2575.505 HYDROSEEDING (INCL. TOPSOIL, FERTILIZER, SEED 25-131) SQ YD 200 5.00$ 1,000.00$ 2582.502 4" SOLID LINE WHITE-EPOXY LIN FT 1,900 0.50$ 950.00$ Schedule A - Jaycee Park Surface Improvements $89,425.00 + 5% Contingencies $4,471.25 Total - Schedule A - Jaycee Park Surface Improvements $93,896.25 2021.501 MOBILIZATION (5% MAXIMUM) LUMP SUM 1 2,500.00$ 2,500.00$ 2104.501 REMOVE CURB AND GUTTER LIN FT 50 5.00$ 250.00$ 2104.503 REMOVE BITUMINOUS WALK SQ FT 250 1.00$ $1,400.00 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 50 2.00$ 100.00$ 2104.509 REMOVE CASTING EACH 1 75.00$ 75.00$ 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 30 2.50$ 75.00$ 2211.501 AGGREGATE BASE CLASS 5 TON 30 15.00$ 450.00$ 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 10 56.00$ 560.00$ 2360.502 TYPE SP 12.5 NON WEARING COURSE MIX (2,C) TON 10 56.00$ 560.00$ 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V LIN FT 30 40.00$ 1,200.00$ 2503.541 CONNECT TO EXISTING STORM SEWER EACH 1 850.00$ 850.00$ 2506.502 CONSTRUCT DRAINAGE STRUCTURE SPECIAL 1 (2'X3') EACH 1 1,500.00$ 1,500.00$ 2531.501 CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 200 16.00$ 3,200.00$ 2575.505 HYDROSEEDING (INCL. TOPSOIL, FERTILIZER, SEED 25-131) SQ YD 100 5.00$ 500.00$ Schedule A - Jaycee Park Storm Sewer Improvements 13,220.00$ + 5% Contingencies $661.00 Total - Schedule A - Jaycee Park Storm Sewer Improvements $13,881.00 A2. JAYCEE PARK SURFACE IMPROVEMENTS A3. JAYCEE PARK STORM SEWER IMPROVEMENTS Item No. MN/DOT Specification No. Description Unit Estimated Total Quantity Estimated Unit Price Estimated Total Cost 2021.501 MOBILIZATION (5% MAXIMUM) LUMP SUM 1 12,000.00$ 12,000.00$ 2104.501 REMOVE CURB AND GUTTER LIN FT 1,000 5.00$ 5,000.00$ 2104.503 REMOVE CONCRETE WALK SQ FT 200 1.50$ 300.00$ 2104.505 REMOVE CONCRETE DRIVEWAY PAVEMENT SQ YD 80 6.00$ 480.00$ 2104.505 REMOVE BITUMINOUS DRIVEWAY PAVEMENT SQ YD 260 5.00$ 1,300.00$ 2104.505 REMOVE BITUMINOUS PAVEMENT SQ YD 25 0.90$ 22.50$ 2104.509 REMOVE SIGN EACH 7 40.00$ 280.00$ 2104.509 REMOVE CASTING (SANITARY) EACH 3 75.00$ 225.00$ 2104.509 REMOVE CASTING (STORM) EACH 2 75.00$ 150.00$ 2104.509 REMOVE CASTING (CATCH BASIN) EACH 2 75.00$ 150.00$ 2104.513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) LIN FT 150 2.50$ 375.00$ 2104.601 SALVAGE AND REINSTALL LANDSCAPE STRUCTURES EACH 4 800.00$ 3,200.00$ 2104.618 SALVAGE AND REINSTALL BRICK PAVERS SQ FT 50 9.00$ 450.00$ 2105.501 COMMON EXCAVATION CU YD 50 20.00$ 1,000.00$ 2105.522 SELECT GRANULAR BORROW (CV) CU YD 50 12.00$ 600.00$ 2211.501 AGGREGATE BASE CLASS 5 MOD TON 50 18.00$ 900.00$ 2231.501 BITUMINOUS PATCH MIXTURE TON 110 80.00$ 8,800.00$ 2232.501 MILL BITUMINOUS SURFACE (1.5") (P) SQ YD 18,000 1.25$ 22,500.00$ 2357.502 BITUMINOUS MATERIAL FOR TACK COAT GALLON 1,800 3.00$ 5,400.00$ 2360.501 TYPE SP 12.5 WEARING COURSE MIX (2,C) TON 2,100 58.00$ 121,800.00$ 2360.503 TYPE SP 12.5 WEARING COURSE MIXTURE (2,B) 3.0'' THICK SQ YD 260 25.00$ 6,500.00$ 2504.602 IRRIGATION SYSTEM REPAIR EACH 15 200.00$ 3,000.00$ 2504.602 ADJUST VALVE BOX EACH 5 250.00$ 1,250.00$ 2504.602 RECONSTRUCT VALVE BOX EACH 5 500.00$ 2,500.00$ 2504.516 CASTING ASSEMBLY (SANITARY) EACH 3 800.00$ 2,400.00$ 2505.516 CASTING ASSEMBLY (STORM) EACH 2 600.00$ 1,200.00$ 2506.516 CASTING ASSEMBLY (CATCH BASIN) EACH 2 700.00$ 1,400.00$ 2506.522 ADJUST FRAME AND RING CASTING (SANITARY) EACH 28 450.00$ 12,600.00$ 2506.522 ADJUST FRAME AND RING CASTING (STORM) EACH 6 400.00$ 2,400.00$ 2506.522 ADJUST FRAME AND RING CASTING (CATCH BASIN) EACH 15 250.00$ 3,750.00$ 2521.501 4'' CONCRETE WALK SQ FT 200 4.50$ 900.00$ 2531.501 CONCRETE CURB & GUTTER DESIGN SPECIAL LIN FT 1,000 16.00$ 16,000.00$ 2531.507 6" CONCRETE DRIVEW AY PAVEMENT SQ YD 80 55.00$ 4,400.00$ 2531.618 TRUNCATED DOMES SQ FT 16 35.00$ 560.00$ 2531.618 ADA COMPLIANCE SUPERVISOR LUMP SUM 1 250.00$ 250.00$ 2557.602 REPAIR DOG FENCE EACH 5 100.00$ 500.00$ 2563.601 TRAFFIC CONTROL LUMP SUM 1 1,500.00$ 1,500.00$ 2564.602 F&I SIGN PANEL TYPE C EACH 2 150.00$ 300.00$ 2564.602 F&I SIGN PANEL TYPE D EACH 5 300.00$ 1,500.00$ 2573.530 STORM DRAIN INLET PROTECTION EACH 20 125.00$ 2,500.00$ 2575.605 HYDROSEEDING (INCL. TOPSOIL, FERTILIZER, SEED 25-131) SQ YD 500 5.00$ 2,500.00$ Schedule B - Shannon Hills Improvements 252,842.50$ + 5% Contingencies 12,642.13$ Total - Schedule B - Shannon Hills Improvements 265,484.63$ 2356.604 BITUMINOUS SEAL COATING SQ YD 29,600 $1.25 $37,000.00 Schedule C Total - 2017 Pavement Management Program Maintenance $37,000.00 Total - 2017 Street Improvement Project $1,109,036.88 B. SHANNON HILLS IMPROVEMENTS C. 2017 PAVEMENT MANAGEMENT PROGRAM MAINTENANCE Feasibility Report APPENDIX 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 APPENDIX B Preliminary Assessment Map: Shannon Parkway Preliminary Assessment Map: Shannon Hills Preliminary Assessment Roll Assessment Calculations G±WXCRYSTALPATH152ND ST WDARLING PATH150TH ST W (CSAH 42)153RD ST W151ST ST W156TH ST WDANBURY AVE 152ND CT WCOLUMBIA WAYDAKOTA DR59TH CT WCINNAMONWA Y 157TH ST WCRESTONE AVE CROCUSAVE 158TH ST WD A RJEELING PATH CARDINALSTWCASCADE PATHTH CT WTH CT WUPPER156THSTWCORNELL T155TH ST WD E C EMBERTRLCLARET AVE154TH CT WCIMA RRON AV ECOLUMBIACTCUMBERLANDAVECRYSTALPA T H 154THSTW153RD ST WCRESTVIEWCIR C I C E R O N E C T CIRCLE AVECROCUSCTCARDINALCT RLEIGHCIRLEIGHCIRDERBY CI RDANVILLE A VE W DANVILLE AVE W CLARET AVE CICERONE PA T H CRESTONE CTUPPER156THCTWDAKOTALN CICE CLARETCI RCRESTONECIR154TH158TH ST W151ST ST WH ST WDANBURY A V E155TH ST WDANVILLEAVEWWCIMARRONWAYDECEMBER WAYCIMCOLUMBARY CTCORNE L L CT SCRYSTA L C T DAPPLE CIRDA P P L E C T CARDINAL CIR DARTMOORCTD A R J E E L I N G C T 155TH CT COLUMBARY CIR C R ESTONE P A T H C ORNELLTRAIL156THSTWCO RNELL CT NPATH D AYBREAK AVE SHANSHANNON PKWYSHANNON PKWY3 1254G±WXCRYSTALPATH152ND ST WDARLING PATH150TH ST W (CSAH 42)153RD ST W151ST ST W156TH ST WDANBURY AVE 152ND CT WCOLUMBIA WAYDAKOTA DR59TH CT WCINNAMONWA Y 157TH ST WCRESTONE AVE CROCUSAVE 158TH ST WD A RJEELING PATH CARDINALSTWCASCADE PATHTH CT WTH CT WUPPER156THSTWCORNELL T155TH ST WD E C EMBERTRLCLARET AVE154TH CT WCIMA RRON AV ECOLUMBIACTCUMBERLANDAVECRYSTALPA T H 154THSTW153RD ST WCRESTVIEWCIR C I C E R O N E C T CIRCLE AVECROCUSCTCARDINALCT RLEIGHCIRLEIGHCIRDERBY CI RDANVILLE A VE W DANVILLE AVE W CLARET AVE CICERONE PA T H CRESTONE CTUPPER156THCTWDAKOTALN CICE CLARETCI RCRESTONECIR154TH158TH ST W151ST ST WH ST WDANBURY A V E155TH ST WDANVILLEAVEWWCIMARRONWAYDECEMBER WAYCIMCOLUMBARY CTCORNE L L CT SCRYSTA L C T DAPPLE CIRDA P P L E C T CARDINAL CIR DARTMOORCTD A R J E E L I N G C T 155TH CT COLUMBARY CIR C R ESTONE P A T H C ORNELLTRAIL156THSTWCO RNELL CT NPATH D AYBREAK AVE SHANSHANNON PKWYSHANNON PKWY3 1254Path: T:\GIS\City\Maps\Departmental Maps\Engineering\Pavement\2017\2017 Shannon Parkway Assessment.mxdAssessed Parcels2017 Street Improvement ProjectRosemount, MN RCTR AVE ANT WAYWAYCROCUSWAYCLOVERLNCOBBLERAVECOPPE R CTCTW 143RD ST WCROFTON CTCRAN B E RRYSHANNON PKWY 424193633763403938752353474424101857699629877973396929010289235025299111283295311654769373201006488101491252942753266772582218485957615160556869191470176656214715134644844543808685873065788171838279RCTR AVE ANT WAYWAYCROCUSWAYCLOVERLNCOBBLERAVECOPPE R CTCTW 143RD ST WCROFTON CTCRAN B E RRYSHANNON PKWY 424193633763403938752353474424101857699629877973396929010289235025299111283295311654769373201006488101491252942753266772582218485957615160556869191470176656214715134644844543808685873065788171838279Path: T:\GIS\City\Maps\Departmental Maps\Engineering\Pavement\2017\2017 Shannon Assessment.mxdAssessed Parcels2017 Street Improvement ProjectRosemount, MN City Project No.: 470Shannon Hills Single Family Residential Unit Assessment1,100.00$ WSB Project No.: 2235-10Shannon Parkway Single Family Residential Front Foot Assessment2,385.00$ Shannon Parkway Commercial Front Foot Assessment31.23$ SHANNON HILLS SINGLE FAMILY ASSESSMENT ROLLMAP ID Parcel ID Owner Owner Address CITY/STATE ZIPCODE Site Address USE DESCRIPTIONASSEMBLE UNITSPROPOSED ASSESMENT 1 346742703010 JODI M PHILLIPS 14290 COBBLER AVE ROSEMOUNT MN 55068 14290 COBBLER AVE RESIDENTIAL 1 1,100$ 2 346742801010 KARIA C & LESLIE P FORSTER 14296 COBBLER AVE ROSEMOUNT MN 55068 14296 COBBLER AVE RESIDENTIAL 1 1,100$ 3 346742801020 RANDALL T QUINN 14297 CRANBERRY WAY ROSEMOUNT MN 55068 14297 CRANBERRY WAY RESIDENTIAL 1 1,100$ 4 346742801030 LAYNE W & DENISE M CHAPPLE 14291 CRANBERRY WAY ROSEMOUNT MN 55068 14291 CRANBERRY WAY RESIDENTIAL 1 1,100$ 5 346742801040 THOMAS W & JODELL M WELSH 14285 CRANBERRY WAY ROSEMOUNT MN 55068 14285 CRANBERRY WAY RESIDENTIAL 1 1,100$ 6 346742801050 DALE R & DIANE M PARKIN 14277 CRANBERRY WAY ROSEMOUNT MN 55068 14277 CRANBERRY WAY RESIDENTIAL 1 1,100$ 7 346742801060 ALAN M & MARY E BRAUNWARTH 14271 CRANBERRY WAY ROSEMOUNT MN 55068 14271 CRANBERRY WAY RESIDENTIAL 1 1,100$ 8 346742801070 STEVEN M & LISA A BOTHUN 14263 CRANBERRY WAY ROSEMOUNT MN 55068 14263 CRANBERRY WAY RESIDENTIAL 1 1,100$ 9 346742801080 WILLIAM P & DOLORES BUSHER 14257 CRANBERRY WAY ROSEMOUNT MN 55068 14257 CRANBERRY WAY RESIDENTIAL 1 1,100$ 10 346742801090 KEVIN J & CAROL MARGARIT 14249 CRANBERRY WAY ROSEMOUNT MN 55068 14249 CRANBERRY WAY RESIDENTIAL 1 1,100$ 11 346742801100 JAN PLUMMER DAVIDSON 14241 CRANBERRY WAY ROSEMOUNT MN 55068 14241 CRANBERRY WAY RESIDENTIAL 1 1,100$ 12 346742801110 CHAD B & JOY M MENSING 14235 CRANBERRY WAY ROSEMOUNT MN 55068 14235 CRANBERRY WAY RESIDENTIAL 1 1,100$ 13 346742801120 SAJI MATHEW & LENI SAJI 14227 CRANBERRY WAY ROSEMOUNT MN 55068 14227 CRANBERRY WAY RESIDENTIAL 1 1,100$ 14 346742801130 RAYMOND W JONES 14196 CROCUS WAY ROSEMOUNT MN 55068 14196 CROCUS WAY RESIDENTIAL 1 1,100$ 15 346742801140 LEE A & ANGELA A SHAW 14184 CROCUS WAY ROSEMOUNT MN55068 14184 CROCUS WAY RESIDENTIAL 1 1,100$ 16 346742802010 JOHN W & DEBORAH K RATCLIFF 14173 CROCUS WAY ROSEMOUNT MN 55068 14173 CROCUS WAY RESIDENTIAL 1 1,100$ 17 346742802020 JANELLE M WALTER 14185 CROCUS WAY ROSEMOUNT MN 5506814185 CROCUS WAY RESIDENTIAL 1 1,100$ 18 346742802030 ANTHONY & TRACEY CAPERS 14199 CROCUS WAY ROSEMOUNT MN 55068 14199 CROCUS WAY RESIDENTIAL 1 1,100$ 19 346742802040 JAMES A & JUDY B HART 14207 CRANBERRY WAY ROSEMOUNT MN 55068 14207 CRANBERRY WAY RESIDENTIAL 1 1,100$ 20 346742803010 RUDOLF H & DIANA SCHAEFER 14208 CRANBERRY WAY ROSEMOUNT MN 55068 14208 CRANBERRY WAY RESIDENTIAL 1 1,100$ 21 346742803020 RICHARD & PATRICIA GRATHEN 14216 CRANBERRY WAY ROSEMOUNT MN 55068 14216 CRANBERRY WAY RESIDENTIAL 1 1,100$ 22 346742803030 STANLEY P & PATRICIA JURUSIK 14224 CRANBERRY WAY ROSEMOUNT MN 55068 14224 CRANBERRY WAY RESIDENTIAL 1 1,100$ 23 346742803040 BRENT R & MONICA J EICHTEN 14232 CRANBERRY WAY ROSEMOUNT MN 55068 14232 CRANBERRY WAY RESIDENTIAL 1 1,100$ 24 346742803050 DWIGHT W HEIL & PAULA F POSEY 14240 CRANBERRY WAY ROSEMOUNT MN 55068 14240 CRANBERRY WAY RESIDENTIAL 1 1,100$ 25 346742803060 PATRICK A & PEGGY A WARNER 14248 CRANBERRY WAY ROSEMOUNT MN 55068 14248 CRANBERRY WAY RESIDENTIAL 1 1,100$ 26 346742803070 CARL E & MARY M ARNDT 14254 CRANBERRY WAY ROSEMOUNT MN 55068 14254 CRANBERRY WAY RESIDENTIAL 1 1,100$ 27 346742803080 RONALD I BUDD & JULIA A SIEVWRIGHT 14262 CRANBERRY WAY ROSEMOUNT MN 55068 14262 CRANBERRY WAY RESIDENTIAL 1 1,100$ 28 346742803090 CAMERON J & SIRI M ERICKSON 14270 CRANBERRY WAY ROSEMOUNT MN 55068 14270 CRANBERRY WAY RESIDENTIAL 1 1,100$ 29 346742803100 DANIEL J & RATNA HEDEEN 14278 CRANBERRY WAY ROSEMOUNT MN 55068 14278 CRANBERRY WAY RESIDENTIAL 1 1,100$ 30 346742803110 JOE & TRACY GERRITS 14286 CRANBERRY WAY ROSEMOUNT MN 55068 14286 CRANBERRY WAY RESIDENTIAL 1 1,100$ 31 346742803120 JEFFREY P & DIANE J FORTHUN 14294 CRANBERRY WAY ROSEMOUNT MN 55068 14294 CRANBERRY WAY RESIDENTIAL 1 1,100$ 32 346742901010 CHARLES S & DIANE J GILL 14270 COBBLER AVE ROSEMOUNT MN 55068 14270 COBBLER AVE RESIDENTIAL 1 1,100$ 33 346742901020 DEAN R & MARIA R JOHNSON 14250 COBBLER AVE ROSEMOUNT MN 55068 14250 COBBLER AVE RESIDENTIAL 1 1,100$ 34 346742901030 DALE L & BRENDA S CALLIES 14230 COBBLER AVE ROSEMOUNT MN 55068 14230 COBBLER AVE RESIDENTIAL 1 1,100$ 35 346742901040 GALEN C GASNER 14210 COBBLER AVE ROSEMOUNT MN 55068 14210 COBBLER AVE RESIDENTIAL 1 1,100$ 36 346742901050 JANET LYNN ROHLF 14190 COBBLER AVE ROSEMOUNT MN 55068 14190 COBBLER AVE RESIDENTIAL 1 1,100$ 37 346742901060 GARY D & MARY A LINDERT 14170 COBBLER AVE ROSEMOUNT MN 55068 14170 COBBLER AVE RESIDENTIAL 1 1,100$ 38 346742901070 JAMES A & ELIZABETH FLOEDER 14150 COBBLER AVE ROSEMOUNT MN 55068 14150 COBBLER AVE RESIDENTIAL 1 1,100$ 39 346742901080 MICHAEL S & JUDITH L BERG 14130 COBBLER AVE ROSEMOUNT MN 55068 14130 COBBLER AVE RESIDENTIAL 1 1,100$ 40 346742901090 SCOTT P & KATHLEEN M ROGERS 14110 COBBLER AVE ROSEMOUNT MN 55068 14110 COBBLER AVE RESIDENTIAL 1 1,100$ 41 346742901100 DAVID T & AMY J LAPREE 14090 COBBLER AVE ROSEMOUNT MN 55068 14090 COBBLER AVE RESIDENTIAL 1 1,100$ 42 346742901110 NORMAN E & BARBARA J LARSON 14070 COBBLER AVE ROSEMOUNT MN 55068 14070 COBBLER AVE RESIDENTIAL 1 1,100$ 43 346742902010 CHAD M & REBECCA E WHITE 14275 COBBLER AVE ROSEMOUNT MN 55068 14275 COBBLER AVE RESIDENTIAL 1 1,100$ 44 346742902020 ILEEN J GERTZ 14255 COBBLER AVE ROSEMOUNT MN 55068 14255 COBBLER AVE RESIDENTIAL 1 1,100$ 45 346742902030 TONY J & BECKY L KAUFMAN 14233 COBBLER AVE ROSEMOUNT MN 55068 14233 COBBLER AVE RESIDENTIAL 1 1,100$ 46 346742902040 PETER E & DAWN M PARKER 14213 COBBLER AVE ROSEMOUNT MN 55068 14213 COBBLER AVE RESIDENTIAL 1 1,100$ 47 346742902050 KEITH E & BONNIE M STOCKMAN 14191 COBBLER AVE ROSEMOUNT MN 55068 14191 COBBLER AVE RESIDENTIAL 1 1,100$ 48 346742902060 BEVERLY J PANNKUK 9321 W BRIARWOOD SUN CITY AZ 8535114171 COBBLER AVE RESIDENTIAL 1 1,100$ 49 346742902070 TIMOTHY D & BRENDA A JOHNSON 14149 COBBLER AVE ROSEMOUNT MN 55068 14149 COBBLER AVE RESIDENTIAL 1 1,100$ 50 346742902080 TROY M & MELANI R HANISCH 14129 COBBLER AVE ROSEMOUNT MN 55068 14129 COBBLER AVE RESIDENTIAL 1 1,100$ 51 346742902090 NICOLA JANE SHAFFER 14107 COBBLER AVE ROSEMOUNT MN 55068 14107 COBBLER AVE RESIDENTIAL 1 1,100$ 52 346742902100 KEVIN P & MARGARET A DOBIAS 14087 COBBLER AVE ROSEMOUNT MN 55068 14087 COBBLER AVE RESIDENTIAL 1 1,100$ 53 346742902110 MICHAEL J TOWNS & DONNA K TOWNS 14088 CROCUS WAY ROSEMOUNT MN 55068 14088 CROCUS WAY RESIDENTIAL 1 1,100$ 54 346742902120 THOMAS D & JULIE M BURT 14102 CROCUS WAY ROSEMOUNT MN 55068 14102 CROCUS WAY RESIDENTIAL 1 1,100$ 55 346742902130 THOMAS A LUING 14116 CROCUS WAY ROSEMOUNT MN 55068 14116 CROCUS WAY RESIDENTIAL 1 1,100$ 56 346742902140 ROBIN K SCHROEDER 14130 CROCUS WAY ROSEMOUNT MN 55068 14130 CROCUS WAY RESIDENTIAL 1 1,100$ 57 346742902150 DAVID J KOHMAN & EDWARD KWIATKOWSKI 14144 CROCUS WAY ROSEMOUNT MN 55068 14144 CROCUS WAY RESIDENTIAL 1 1,100$ 2017 Street Improvement Project Assessment Roll 58 346742902160 DAVID B & SHERRIE L WILHELMI 14158 CROCUS WAY ROSEMOUNT MN 55068 14158 CROCUS WAY RESIDENTIAL 1 1,100$ 59 346742902170 BARRY B & JAN M WALLIN 14172 CROCUS WAY ROSEMOUNT MN 55068 14172 CROCUS WAY RESIDENTIAL 1 1,100$ 60 346742903010 THOMAS & PATRICIA SCHAFFER 14165 CROCUS WAY ROSEMOUNT MN 55068 14165 CROCUS WAY RESIDENTIAL 1 1,100$ 61 346742903020 LAWRENCE E & DOROTHY SCHAEFER 14157 CROCUS WAY ROSEMOUNT MN 55068 14157 CROCUS WAY RESIDENTIAL 1 1,100$ 62 346742903030 CRAIG E NELSON & JODI L DORCAS 14149 CROCUS WAY ROSEMOUNT MN 55068 14149 CROCUS WAY RESIDENTIAL 1 1,100$ 63 346742903040 LE DUC NGUYEN & LEANNA-DUC TRUONG 14141 CROCUS WAYROSEMOUNT MN 55068 14141 CROCUS WAY RESIDENTIAL 1 1,100$ 64 346742903050 KELLY J & SCOTT FLYNN 14133 CROCUS WAY ROSEMOUNT MN55068 14133 CROCUS WAY RESIDENTIAL 1 1,100$ 65 346742903060 DEBORAH K KEARNEY 14125 CROCUS WAY ROSEMOUNT MN 55068 14125 CROCUS WAY RESIDENTIAL 1 1,100$ 66 346742903070 ROBERT J & BEDA J LATZKE 14117 CROCUS WAY ROSEMOUNT MN 55068 14117 CROCUS WAY RESIDENTIAL 1 1,100$ 67 346742903080 BRIAN B & LISA K TST KUZNIA 14109 CROCUS WAY ROSEMOUNT MN 55068 14109 CROCUS WAY RESIDENTIAL 1 1,100$ 68 346742903090 TIMOTHY CLARK SOLLID & LORI MICHELLE FLAIG 14101 CROCUS WAY ROSEMOUNT MN 55068 14101 CROCUS WAY RESIDENTIAL 1 1,100$ 69 346742903100 JAMES L & ELAINE C BENFANTE 14093 CROCUS WAY ROSEMOUNT MN 55068 14093 CROCUS WAY RESIDENTIAL 1 1,100$ 70 346742903110 JAMES A & JACQUELINE SCHULTZ 14085 CROCUS WAY ROSEMOUNT MN 55068 14085 CROCUS WAY RESIDENTIAL 1 1,100$ 71 346742903120 MARY E WELLMAN 14077 CROCUS WAY ROSEMOUNT MN 55068 14077 CROCUS WAY RESIDENTIAL 1 1,100$ 72 346742903130 BRIAN A & CARLA J SCHULTZ 14069 CROCUS WAY ROSEMOUNT MN 55068 14069 CROCUS WAY RESIDENTIAL 1 1,100$ 73 346743001010 GARY L & BARBARA A JOHNSON 14042 CLOVER LN ROSEMOUNT MN 55068 14042 CLOVER LN RESIDENTIAL 1 1,100$ 74 346743001020 DENNIS P & NANCY H RANDALL 14034 CLOVER LN ROSEMOUNT MN 55068 14034 CLOVER LN RESIDENTIAL 1 1,100$ 75 346743001030 DENNIS E & MELVA G SALINY 14026 CLOVER LN ROSEMOUNT MN 55068 14026 CLOVER LN RESIDENTIAL 1 1,100$ 76 346743001040 CARY J GRIFFITH & ANNA M MCCOURT 14018 CLOVER LN ROSEMOUNT MN 55068 14018 CLOVER LN RESIDENTIAL 1 1,100$ 77 346743001050 KRISTIAN & LORA LEE THUSHOLT 14010 CLOVER LN ROSEMOUNT MN 55068 14010 CLOVER LN RESIDENTIAL 1 1,100$ 78 346743002010 DALE ALEXANDER LECHNER 14043 COBBLER AVE ROSEMOUNT MN 55068 14043 COBBLER AVE RESIDENTIAL 1 1,100$ 79 346743002020 ANDREW & KELSEY MICHELSON 14039 COBBLER AVE ROSEMOUNT MN 55068 14039 COBBLER AVE RESIDENTIAL 1 1,100$ 80 346743002030 TIMOTHY M & NANCY J RABOIN 14035 COBBLER AVE ROSEMOUNT MN 55068 14035 COBBLER AVE RESIDENTIAL 1 1,100$ 81 346743002040 JOHN A NELSON & GAIL E NELSON 14031 COBBLER AVE ROSEMOUNT MN 55068 14031 COBBLER AVE RESIDENTIAL 1 1,100$ 82 346743002050 JEFFREY A & LAURIE A MAY 14027 COBBLER AVE ROSEMOUNT MN 55068 14027 COBBLER AVE RESIDENTIAL 1 1,100$ 83 346743002060 CLIFTON A & JODI L POND 14023 COBBLER AVE ROSEMOUNT MN 55068 14023 COBBLER AVE RESIDENTIAL 1 1,100$ 84 346743002070 THOMAS E & JOLENE R MAECK 14019 COBBLER AVE ROSEMOUNT MN 55068 14019 COBBLER AVE RESIDENTIAL 1 1,100$ 85 346743002080 JEFFREY C M WALL & PATRICIA H WALL 14015 COBBLER AVE ROSEMOUNT MN 55068 14015 COBBLER AVE RESIDENTIAL 1 1,100$ 86 346743002090 MARCELLA N & DAVID M TVETER 14011 COBBLER AVE ROSEMOUNT MN 55068 14011 COBBLER AVE RESIDENTIAL 1 1,100$ 87 346743002100 JEFFREY & TERESA STOREBY 14007 COBBLER AVE ROSEMOUNT MN 55068 14007 COBBLER AVE RESIDENTIAL 1 1,100$ 88 346743002110 MICHAEL L & POLLY E GATLIN 14003 COBBLER AVE ROSEMOUNT MN 55068 14003 COBBLER AVE RESIDENTIAL 1 1,100$ 89 346743003010 CHADWICK D & GRETTA HOLDER 14015 CLOVER LN ROSEMOUNT MN 55068 14015 CLOVER LN RESIDENTIAL 1 1,100$ 90 346743003020 MICHAEL J & SUSAN M CARTER 14027 CLOVER LN ROSEMOUNT MN 55068 14027 CLOVER LN RESIDENTIAL 1 1,100$ 91 346743003030 BRIDGET A POWERS 14039 CLOVER LN ROSEMOUNT MN 55068 14039 CLOVER LN RESIDENTIAL 1 1,100$ 92 346743003040 DAVID R & KAREN K JOHNSON 14042 COBBLER AVE ROSEMOUNT MN 55068 14042 COBBLER AVE RESIDENTIAL 1 1,100$ 93 346743003050 MARGARET I HARRINGTON 14038 COBBLER AVE ROSEMOUNT MN 55068 14038 COBBLER AVE RESIDENTIAL 1 1,100$ 94 346743003060 RICHARD D & WANDA L WIRT 14034 COBBLER AVE ROSEMOUNT MN 55068 14034 COBBLER AVE RESIDENTIAL 1 1,100$ 95 346743003070 ANTHONY M & JOCELYN GRANT 14030 COBBLER AVE ROSEMOUNT MN 55068 14030 COBBLER AVE RESIDENTIAL 1 1,100$ 96 346743003080 SHANE H & LATOYA J GARRAHAN 14026 COBBLER AVE ROSEMOUNT MN 55068 14026 COBBLER AVE RESIDENTIAL 1 1,100$ 97 346743003090 CHASE A & AMANDA L WILLIAMS 14022 COBBLER AVE ROSEMOUNT MN 55068 14022 COBBLER AVE RESIDENTIAL 1 1,100$ 98 346743003100 THOMAS & JENNIFER FABER 14018 COBBLER AVE ROSEMOUNT MN 55068 14018 COBBLER AVE RESIDENTIAL 1 1,100$ 99 346743003110 WESLEY & NATALIE TREVIS 14014 COBBLER AVE ROSEMOUNT MN 55068 14014 COBBLER AVE RESIDENTIAL 1 1,100$ 100 346743003120 BRIAN F & LISA E FAHEY-BLEICK 14010 COBBLER AVE ROSEMOUNT MN 55068 14010 COBBLER AVE RESIDENTIAL 1 1,100$ 101 346743003130 JOEL E & SAROJNI RITTER 14006 COBBLER AVE ROSEMOUNT MN 55068 14006 COBBLER AVE RESIDENTIAL 1 1,100$ 102 346743003140 ERIC R & CARRIE R MENNE 14002 COBBLER AVE ROSEMOUNT MN 55068 14002 COBBLER AVE RESIDENTIAL 1 1,100$ SHANNON HILLS SINGLE FAMILY RESIDENTIAL ASSESSMENT TOTAL 102 112,200$ SHANNON PARKWAY COMMERCIAL ASSESSMENT ROLLMAP ID PID FEE OWNER FEE OWNER ADDRESS CITY/STATE ZIPCODE PROPERTY ADDRESS USE DESCRIPTIONFRONT FOOTAGEASSESSABLE UNITPROPOSED ASSESMENT 1 344750001010 EJA TRUST ROSEMOUNT LLC PO BOX 1159 DEERFIELD IL 60015 15034 SHANNON PKWY COMMERCIAL 295 9,212$ 2 344750001020 KCP RE LLC 2601 BAYSHORE DR S COCONUT GROVE FL 3313315080 SHANNON PKWY COMMERCIAL 259 8,088$ SHANNON PARKWAY COMMERCIAL ASSESSMENT TOTAL 554 17,301$ SHANNON PARKWAY SINGLE FAMILY ASSESSMENT ROLLMAP ID PID FEE OWNER FEE OWNER ADDRESS CITY/STATE ZIPCODE PROPERTY ADDRESS USE DESCRIPTIONFRONT FOOTAGEASSESSABLE UNITPROPOSED ASSESMENT 3 346770001270 ALAN K & DEANEANE L RHODE 15933 SHANNON PKWY ROSEMOUNT MN 55068 15933 SHANNON PKWY RESIDENTIAL 1 2,385$ 4 346770001260 BETH A DONAHUE 15953 SHANNON PKWY ROSEMOUNT MN 55068 15953 SHANNON PKWY RESIDENTIAL 1 2,385$ 5 346770001250 JONATHAN J & AMY L HAMEL 15973 SHANNON PKWY ROSEMOUNT MN 55068 15973 SHANNON PKWY RESIDENTIAL 1 2,385$ SHANNON PARKWAY SINGLE FAMILY RESIDENTIAL ASSESSMENT TOTAL 3 7,155$ Assessable Project Cost $318,582 Assessment Rate 35% Total Assessment (Exact) $111,504 Assessable Units 102 Assessment Per Unit (Exact) $1,093.17 Assessment Per Unit (Rounded) $1,100.00 Total Assessment (Rounded) $112,200 Assessable Project Cost $838,530 Total Front Footage 9,398 Cost per Front Foot $89.22 Assessable Percentage of Roadway 76% Assessment Rate 35% Assessment Per Front Foot $23.79 Shannon Parkway Assessable Frontage 301 Total Assessment $7,162 Number of Units 3 Unit Assessment (Exact) $2,387.25 Unit Assessment (Rounded) $2,385 Shannon Parkway: Commercial Assessable Project Cost $838,530 Shannon Parkway Frontage 9,398 Cost per Front Foot $89.22 Assessable Percentage of Roadway 100% Assessment Rate 35% Assessment Per Front Foot $31.23 145th Street Total Assessable Frontage 554 Total Assessment $17,301 2017 SIP Assessment Calculations Shannon Hills: Single Family Shannon Parkway: Single Family TOTAL ASSESSMENT $136,662 Feasibility Report APPENDIX 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 APPENDIX C Shannon Parkway Geotechnical Report GEOTECHNICAL REPORT SHANNON PARKWAY RECONSTRUCTION FROM CSAH 42 TO CSAH 46 | ROSEMOUNT, MN JULY 2016 Prepared for: City of Rosemount 2875 14th Street West Rosemount, MN 55337 WSB PROJECT NO. 02235-100 GEOTECHNICAL REPORT SHANNON PARKWAY RECONSTRUCTION FROM CSAH 42 TO CSAH 46 ROSEMOUNT, MINNESOTA Prepared For: City of Rosemount 2875 145th Street West Rosemount, MN 55068 Attn: Patrick Wrase Prepared by: WSB & Associates, Inc. 540 Gateway Boulevard Burnsville, MN 55337 (952)-737-4660 WSB Project#: 02235-100 I hereby certify that this plan, specification, or report was prepared by me or under my direct supervision and that I am a duly Licensed Professional Engineer under the laws of the State of Minnesota. Name: Mark Osborn, P.E. Signature: Date: July 11, 2016 License #: 41362 July 11, 2016 City of Rosemount 2875 145th Street West Rosemount, MN 55068 Attn: Patrick Wrase Re: Geotechnical Report Shannon Parkway Reconstruction From CSAH 42 to CSAH 46 Rosemount, Minnesota WSB Project#: 02235-100 We have conducted a geotechnical subsurface exploration program for the above referenced project. This report contains our soil boring logs, an evaluation of the conditions encountered in the borings and our recommendations for pavement section design and other geotechnical related design and construction considerations. If you have any questions concerning this report or our recommendations, or for construction material testing for this project, please call us at (952) 737- 4660. Very truly yours, WSB & Associates, Inc. Mark Osborn, PE Darin Hyatt, PE Geotechnical Project Engineer Senior Geotechnical Engineer Attachment Geotechnical Report MWO/mwo TABLE OF CONTENTS 1: INTRODUCTION ............................................................................................ 1 1.1 PROJECT LOCATION ........................................................................................................ 1 1.2 PROJECT DESCRIPTION .................................................................................................... 1 1.3 PURPOSE AND PROJECT SCOPE OF SERVICES ................................................................... 2 2: PROCEDURES ................................................................................................. 2 2.1 BORING LAYOUT AND SOIL SAMPLING PROCEDURES ...................................................... 2 2.2 GROUNDWATER MEASUREMENTS AND BOREHOLE ABANDONMENT ............................... 3 2.3 BORING LOG PROCEDURES AND QUALIFICATIONS ........................................................... 3 3: EXPLORATION RESULTS ........................................................................... 4 3.1 SITE AND GEOLOGY ........................................................................................................ 4 3.2 SUBSURFACE SOIL AND GROUNDWATER CONDITIONS ..................................................... 4 3.3 GROUNDWATER CONDITIONS .......................................................................................... 6 4: ENGINEERING ANALYSIS AND RECOMMENDATIONS ..................... 6 4.1 DISCUSSION .................................................................................................................... 6 4.2 PAVEMENT AREAS .......................................................................................................... 6 4.3 BACKFILL AND FILL SELECTION AND COMPACTION ......................................................... 8 4.4 CONSTRUCTION CONSIDERATIONS .................................................................................. 8 4.5 CONSTRUCTION SAFETY.................................................................................................. 9 4.6 FIELD OBSERVATION AND TESTING ................................................................................. 9 4.7 PLAN REVIEW AND REMARKS ....................................................................................... 10 5: STANDARD OF CARE ................................................................................. 11 APPENDIX A ...................................................................................................... 12 LOCATION MAP ...................................................................................................................... 12 LOGS OF PENETRATION TEST BORINGS ........................................................................... 12 SYMBOLS AND TERMINOLOGY ON TEST BORING LOG ................................................ 12 NOTICE TO REPORT USERS BORING LOG INFORMATION ............................................ 12 UNIFIED SOIL CLASSIFICATION SHEET ............................................................................ 12 GEOTECHNICAL REPORT SHANNON PARKWAY RECONSTRUCTION FROM CSAH 42 TO CSAH 46 ROSEMOUNT, MINNESOTA WSB PROJECT #: 02235-100 1: INTRODUCTION 1.1 Project Location The site is located along Shannon Parkway, between County State Aid Highway (CSAH) 42 and CSAH 46 in Rosemount, Minnesota. The site was a 2-lane bituminous urban roadway at the time of drilling. Borings were completed within the northbound and southbound drive lanes. 1.2 Project Description It is proposed to reconstruct Shannon Parkway from CSAH 42 to CSAH 46 in Rosemount, Minnesota. We understand the reconstructed roadway will consist of a 2-lane bituminous roadway with 2 foot shoulders, similar to the existing design. We also understand the roadway elevations will be within +/- ½ foot of the existing grades. The City is planning a full depth reclamation and will be leaving the existing curb and gutter in place. Our Geotechnical Group has developed foundation recommendations for this project in consideration of the proposed layout and configurations as understood at this time. The Geotechnical Group must be made aware of any revised or additional information in order to evaluate the recommendations for continued applicability. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 2 1.3 Purpose and Project Scope of Services Mr. Patrick Wrase with the City of Rosemount authorized our proposal. In order to assist in preparing plans and specifications, the Geotechnical Group has developed recommendations for subgrade preparation and pavement sections. As such, we have completed a subsurface exploration program and prepared a geotechnical report for the referenced site. This stated purpose was a significant factor in determining the scope and level of service provided. Should the purpose of the report change the report immediately ceases to be valid and use of it without WSB’s prior review and written authorization shall be at the user’s sole risk. Our authorized scope of work has been limited to: 1. Mobilization / Demobilization of an Truck Mounted Drill Rig 2. Clearing underground utilities utilizing the Gopher State One Call. 3. Drilling 10 standard penetration borings to 5 foot depths. 4. Sealing the borings per Minnesota Department of Health procedures. 5. Perform soil classification and analysis. 6. Review of readily available project information and geologic data. 7. Providing this geotechnical report containing: A. Summary of our findings. B. Discussion of subsurface soil and groundwater conditions and how they may affect the proposed construction of pavements. C. Estimated R-value recommendations. D. Recommended pavement section. E. A discussion of soils for use as structural fill and site fill. 2: PROCEDURES 2.1 Boring Layout and Soil Sampling Procedures The City of Rosemount requested we complete 10 soil borings along Shannon Parkway. WSB recommended the boring depths and selected the desired locations. Our field crew staked the borings based on our meeting with the City of Rosemount staff. The approximate boring locations are shown on the Soil Boring Exhibit in the Appendix which is an aerial photo. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 3 We drilled the borings on June 17 with a truck-mounted CME-55 drill rig operated by a two person crew. The drill crew advanced the borings using continuous hollow stem augers. Drilling methods, crew chief, depths, sampling interval, casing usage, groundwater observations, test data and other drilling information are indicated on the boring logs. Generally, the drill crew sampled the soil in advance of the auger tip at 2½ foot intervals of depth. The soil samples were obtained using a split-barrel sampler which was driven into the ground during standard penetration tests in accordance with ASTM D-1586, Standard Method of Penetration Test and Split-Barrel Sampling of Soils. The materials encountered were described on field logs and representative samples were containerized, and transported to our laboratory for further examination and testing. The samples were visually examined to estimate the distribution of grain sizes, plasticity, consistency, moisture condition, color, presence of lenses and seams, and apparent geologic origin. We classified the soils according to type using the Unified Soil Classification System (USCS). A chart describing the Unified Soil Classification System is included in the Appendix. 2.2 Groundwater Measurements and Borehole Abandonment The drill crew observed the borings for free groundwater while drilling and after completion. These observations and measurements are noted on the boring logs. The crew then backfilled the borings with soil cuttings to comply with Minnesota Department of Health regulations. 2.3 Boring Log Procedures and Qualifications The subsurface conditions encountered by the test borings are illustrated on the attached boring logs. Similar soils were grouped into the strata shown on the boring logs, and the appropriate Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 4 estimated USCS classification symbols were also added. The depths and thickness of the subsurface strata indicated on the boring logs were estimated from the drilling results. The transition between materials (horizontal and vertical) is approximate and is usually far more gradual than shown. Information on actual subsurface conditions exists only at the specific locations indicated and is relevant only to the time exploration was performed. Subsurface conditions and groundwater levels at other locations may differ from conditions found at the indicated locations. The nature and extent of which would not become evident until exposed by construction excavation. These stratification lines were used for our analytical purposes and, due to the aforementioned limitations, should not be used as a basis of design or construction cost estimates. 3: EXPLORATION RESULTS 3.1 Site and Geology The borings were drilled along Shannon Parkway, which consisted of a 2-lane bituminous road at the time of drilling. The shoulders were approximately 2 feet wide and traffic control was utilized during the drilling process. The Dakota County Geologic Atlas indicates the surficial geology of the area is mostly glacial outwash materials. These outwash soils typically consist of gravel and sand with some cobbles. 3.2 Subsurface Soil and Groundwater Conditions The soil borings generally encountered pavement section materials overlying fills. Borings PB-5 and PB-10 penetrated the fill and terminated in naturally deposited soils. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 5 The pavement section consisted of bituminous asphalt overlying an aggregate base material. The bituminous asphalt encountered ranged from about 4 to 5½ inches in thickness with an average thickness of about 4¾ inches, and the aggregate base material ranged from about 3 to 10½ inches in thickness with an average thickness of about 7 inches. Below the aggregate base our borings encountered fill consisting mostly of lean clays, silty sands, and sands with gravel. Boring PB-5 encountered fine alluvial lean clays below the fill material. This clay was brown in color and moist. Boring PB-10 encountered sands with a little gravel below the fills. The sands were generally fine to medium grained and brown in color. The following table summarizes the pavement section thicknesses and soils encountered in the upper 3 feet at our boring locations. Table 1: Roadway Soil Boring Profiles Boring Number Bituminous Thickness (inches) Aggregate Base Thickness (inches) Subgrade Soils (Upper 3 feet) PB-1 4 6 Fill (Sand with Gravel) PB-2 4 3 Fill (Lean Clay with Sand) PB-3 4 6½ Fill (Sand / Sand with Gravel) PB-4 5¼ 4¾ Fill (Sand with Gravel / Lean Clay) PB-5 4¼ 4½ Fill (Silty Sand / Lean Clay) PB-6 5 10½ Fill (Sand with Gravel and Silt) PB-7 5 10 Fill (Sand with Gravel and Silt) PB-8 5 7 Fill (Sand with Silt, Lean Clay) PB-9 5 7 Fill (Lean Clay / Silty Sand) PB-10 5½ 10 Fill (Sand with Gravel) Sand with a little Gravel (SP) Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 6 3.3 Groundwater Conditions WSB took groundwater level readings in the exploratory borings, reviewed the data obtained, and discussed its interpretation of the data in the text of the report. Note that groundwater levels may fluctuate due to seasonal variations, e.g. precipitation, snowmelt and rainfall, and/or other factors not evident at the time of measurement. No groundwater was encountered during the drilling process and it appears the static groundwater level is below the depth of our borings. Based on the proposed construction, we do not expect groundwater to be a major issue for construction at this site. It should be noted that groundwater levels do fluctuate over time. See Notice to Report Users boring log information insert in the Appendix for additional discussion on water levels. 4: ENGINEERING ANALYSIS AND RECOMMENDATIONS 4.1 Discussion The fill inplace below the pavement section was likely placed there to raise the site to grade or was backfilled from the utility installation. The fills consisted of a mixture of lean clays, silty sands, and sands with gravel that appear to be compacted. It is our opinion the fill soils encountered in our borings are generally suitable for support of the proposed roadway. 4.2 Pavement Areas We understand the City of Rosemount plans to mill the existing pavement sections to create an aggregate base for support of the new bituminous section. The existing pavement section ranged from about 7 to 14½ inches in thickness, therefore at some locations it may be necessary to remove the milling and subcut the subgrade to allow placement of the recommended pavement section. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 7 The subgrade fills appeared to be moderately to well compacted and in general should be suitable to remain in place as subgrade soils. Nevertheless, we recommend the subgrade soils be observed during construction to determine their suitability for pavement support. Localized soil corrections may be required. The Mn/DOT Flexible Pavement Design Guidance Memo from June 2014 indicates soils such as those anticipated have R-values ranging from about 10 to 40. We recommend using an estimated R-value of 15 for design of the roadway. The traffic data map from Mn/DOT indicates that the current Average Daily Traffic (ADT) ranges from 3200 to 6300 vehicles along the roadway. We used a traffic growth rate of 1% for our calculations. We calculated the roadway traffic to be equivalent to approximately 673,000 Estimated Single Axle Loads (ESAL’s). Based on Mn/DOT’s MnPave software, we recommend the following pavement section. Table 1: Recommended Flexible Pavement Section Section Thickness (inches) Bituminous Wear Course, MnDOT 2360 2½ Bituminous Base Course, MnDOT 2360 2½ MnDOT Class 5 Aggregate Base 7 Geotextile Fabric Yes Within several years after initial paving, some thermal shrinkage cracks will develop. We recommend routine maintenance be performed to improve pavement performance and increase pavement life. These should be sealed with a liquid bitumen sealer, to retard water intrusion into the base course and subgrade. Localized patch failures may also develop where trucks or buses turn on the pavement. When these occur, they should be cut out and patch repaired. Periodic seal Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 8 coating should also be applied, to preserve the longevity of the pavement. If bituminous wear course is delayed until the following year, some rutting and distress areas may be noted where heavy construction traffic occurs. These areas should be cut out and excavated and repaired the following year before the wear lift is placed. A geotechnical engineer should be involved with the repair recommendations. 4.3 Backfill and Fill Selection and Compaction Any subgrade soils removed should be replaced with a granular fill meeting the specifications of a Mn/DOT Select Granular fill. We recommend that sandy soils be moisture conditioned to meet compaction specifications. Fill should be spread in 8 to 10 inch loose lifts. The table below indicates the recommended compaction levels. Table 2: Recommended Level of Compaction for Backfill and Fill Area Percent of standard Proctor Maximum Dry Density Pavement: Within 3 feet of top of subgrade 100 Pavement: Greater than 3 feet below top of subgrade 95 4.4 Construction Considerations Good surface drainage should be maintained throughout the work, so that the site is not vulnerable to ponding during or after a rainfall. The excavations should not encounter groundwater intrusion. However if water does enter excavations, it should be promptly removed prior to further construction activities. Under no circumstances should fill or concrete be placed into standing water. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 9 4.5 Construction Safety All excavations must comply with the requirements of OSHA 29 CFR, Part 1926, Subpart P “Excavations and Trenches”. This document states that excavation safety is the responsibility of the contractor. Reference to this OSHA requirement should be included in the job specifications. The responsibility to provide safe working conditions on this site, for earthwork, building construction, or any associated operations is solely that of the contractor. This responsibility is not borne in any manner by WSB. 4.6 Field Observation and Testing The soil conditions illustrated on the attached boring logs are indicative of the conditions only at the boring locations. For this reason, we recommend that all excavations at this site be observed by a soils engineer or technician prior to fill or backfill placement or construction of any foundation elements to determine the soils are capable of supporting the fill backfill and/or foundation loads. These observations would be necessary to judge if all unsuitable materials have been removed from within the planned construction area and an appropriate degree of lateral oversize has been provided. We also recommend a representative number of field density tests be taken in all engineered fill and backfill placed to aid in judging its suitability. Fill placement and compaction should be monitored and tested to determine that the resulting fill and backfill conforms to specified density, strength or compressibility requirements. Prior to use, any proposed fill and backfill material should be submitted to our laboratory for testing to verify compliance with our recommendations and project specifications. Dynamic Cone Penetrometer (DCP) tests can be completed in the aggregate base in leiu of density testing. We recommend following Mn/DOT Specification 2211-3. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 10 WSB would be pleased to provide the necessary field observation, monitoring and testing services during construction. 4.7 Plan Review and Remarks The observations, recommendations and conclusions described in this report are based primarily on information provided to us and obtained from our subsurface exploration, our experience, several necessary assumptions and the scopes of service developed for this project and are for the sole use of our client. We recommend that the Geotechnical Group of WSB be allowed to perform a review of final design drawing and specifications to evaluate that the geotechnical engineering report has not been misinterpreted. Should there be any changes in the design or location of the structures related to this project or if there are any uncertainties in the report we should be notified. We would be pleased to review any project changes and modify the recommendations in this report (if necessary) or provide any clarification in writing. The entire report should be kept together e.g. boring logs should not be removed and placed in the specifications separately. The boring logs and related information included in this report are indicators of the subsurface conditions only at the specific locations indicated on the Soil Boring Exhibit and times noted on the Log of Test Boring sheets. The subsurface conditions, including groundwater levels, at other locations on the site may differ significantly from conditions that existed at the time of sampling and at the boring locations. The test borings were put down by WSB solely to obtain indications of subsurface conditions as part of a geotechnical exploration program. No services were performed to evaluate subsurface environmental conditions. WSB has not performed any observations, investigations, studies or testing that is not specifically Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 11 listed in the scope of service. WSB shall not be liable for failing to discover any condition whose discovery required the performance of services not authorized by the Agreement. 5: STANDARD OF CARE The recommendations and opinions contained in this report are based on our professional judgment. The soil testing and geotechnical engineering services performed for this project have been performed with the level of skill and diligence ordinarily exercised by reputable members of the same profession under similar circumstances, at the same time and in the same or a similar locale. No warranty, either express or implied, is made. Shannon Parkway Recontruction – Rosemount, MN Project #: 02235-100 Page 12 APPENDIX A LOCATION MAP LOGS OF PENETRATION TEST BORINGS SYMBOLS AND TERMINOLOGY ON TEST BORING LOG NOTICE TO REPORT USERS BORING LOG INFORMATION UNIFIED SOIL CLASSIFICATION SHEET &< &< &< &< &< &< &< &< &< &< P B #1 P B #2 P B #3 P B #4 P B #5 P B #6 P B #7 P B #8 P B #9 P B #1 0 SHANNONPKWYDOD D BLV D 155TH S T W DIAMONDPATHÆÿ33 Æÿ42 Æÿ46 K:\02235-100\GIS\Maps\Soil Boring Exhibit.mxd Date: Thurs day, July 7, 2016 ¯ 0 350 700 Feet S O I L B O R I N G LO C AT I ON M A PSHANNON PA RKWAY R ECO NST RUCTION WSB # 0 2235-100 &<Denotes Appr oximate Soil Boring Location 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 30 19 0" - 4" BTIUMINOUS ASPHALT 4" - 10" AGGREGATE BASE FILL, mostly Sand with Gravel, brown and dark brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Northbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.559:50 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-1 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:40 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 8 9 0" - 4" BTIUMINOUS ASPHALT 4" - 7" AGGREGATE BASE FILL, a mixture of Lean Clay and Sand with a little Gravel, brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Southbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5510:05 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-2 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:40 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 27 31 0" - 4" BTIUMINOUS ASPHALT 4" - 10.5" AGGREGATE BASE FILL, a mixture of Sand and Sand with Gravel, brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Northbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5510:20 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-3 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill Fill 1 2 SB SB 14 12 0" - 5.25" BTIUMINOUS ASPHALT 5.25" - 10" AGGREGATE BASE FILL, a mixture of Sand with Gravel and Lean Clay, brown and dark brown FILL, mostly Sand with Gravel, brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Southbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5510:35 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-4 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' CL Pavement Section Fill Fine Alluvium 1 2 SB SB 10 14 0" - 4.25" BTIUMINOUS ASPHALT 4.25" - 8.75" AGGREGATE BASE FILL, a mixture of Silty Sand and Lean Clay, dark brown and brown LEAN CLAY, brown, moist, firm End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Northbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5510:55 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-5 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 14 26 0" - 5" BTIUMINOUS ASPHALT 5" - 15.5" AGGREGATE BASE FILL, mostly Sand with a little Gravel, a little Sand with Silt, dark brown and brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Southbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5511:10 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-6 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 29 24 0" - 5" BTIUMINOUS ASPHALT 5" - 15" AGGREGATE BASE FILL, mostly Sand with Gravel, a little Sand with Silt, dark brown and brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Northbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5511:25 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-7 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 7 7 0" - 5" BTIUMINOUS ASPHALT 5" - 12" AGGREGATE BASE FILL, a mixture of Sand with Silt, Silty Sand, Lean Clay, and a little Gravel, brown and dark brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Southbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5511:40 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-8 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' Pavement Section Fill 1 2 SB SB 13 13 0" - 5" BTIUMINOUS ASPHALT 5" - 12" AGGREGATE BASE FILL, mostly Lean Clay, a little Silty Sand, brown and dark brown End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Northbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5511:55 am6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-9 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL 3 1/4" HSA 0' - 3.5' SP Pavement Section Fill Coarse Alluvium 1 2 SB SB 11 13 0" - 5.5" BTIUMINOUS ASPHALT 5.5" - 15.5" AGGREGATE BASE FILL, mostly Sand with Gravel, brown SAND WITH A LITTLE GRAVEL, fine to medium grained, brown, moist, medium dense End of Boring 5.0 ft. TIME CASING DEPTH CAVE-IN DEPTH WATER DEPTH WATER ELEVATION WATER LEVEL MEASUREMENTS SAMPLED DEPTHDATE Southbound Lane METHOD START: 6/21/2016 END: 6/21/2016 Logged By: DAJR. Kurth Notes: Crew Chief: LABORATORY TESTS MC (%) DD (pcf) LL (%) PL (%) 3.5512:15 pm6/21/2016 None PROJECT NAME: Shannon Parkway LOG OF TEST BORING PROJECT LOCATION: Rosemount, MN BORING NUMBER PB-10 PAGE 1 OF 1CLIENT/WSB #: 02235-100 DEPTH (ft) 1 2 3 4 5 6 7 USCS GEOLOGIC ORIGIN SAMPLE No.TYPEWLN WSB BORING LOG - WSB.GDT - 7/11/16 12:41 - K:\02235-100\GEOTECH-CMT\SHANNON PARKWAY 02235-100.GPJDESCRIPTION OF MATERIAL SYMBOLS AND TERMINOLOGOY ON TEST BORING LOG SYMBOLS Drilling and Sampling Laboratory Testing Symbol Description HSA 3-1/4” LD. Hollow stem auger _ FA 4”, 6” or 10” diameter flight auger _HA 2”, 4”, or 6” hand auger _DC 2-1/2”, 4”, 5”, or 6” steel drive casing _RC Size A, B or N rotary casing PD Pipe drill or cleanout tube CS Continuous split barrel sampling DM Drilling mud JW Jetting water SB 2” O.D. split barrel sampling _L 2-1/2” or 3-1/2” O.D. SB liner sampler _T 2” or 3” thin walled tube sample 3TP 3” thin walled tube using pitcher sampler _TO 2” or 3” thin walled tube using Osterberg sampler W Wash sample B Bag sample P Test pit sample _Q BQ, NQ, or PQ wire line system _X AX, BX, or NX double tube barrel N Standard penetration test, blows per foot CR Core recovery, percent WL Water level ź Water level NMR No measurement recorded, primarily due to presence of drilling or coring fluid. Symbol Description W Water content, % (ASTM** D2216) D Dry density, pcf LL Liquid limit (ASTM D4318) PL Plastic limit (ASTM D4318) -Inserts in last column (Qu or RQD)- Qu Unconfined compressive strength, psf (ASTM D2166) Pq Penetrometer reading, tsf (ASTM D1558) Ts Torvane reading, tsf G Specific gravity (ASTM D854) SL Shrinkage limits (ASTM D427) OC Organic content-combustion method (ASTM D2974) SP Swell pressure, tsf (ASTM D4546) PS Percent swell under pressure (ASTM D4546) FS Free swell, % (ASTM D4546) SS Shrink swell, % (ASTM D4546) pH Hydrogen ion content-Meter Method (ASTM D4972) SC Sulfate content, parts/million or mg/l CC Chloride content, parts/million or mg/l C* One dimensional consolidation (ASTM D2435) Qc* Triaxial compression (ASSTM D2850 and D4767) D.S.* Direct Shear (ASTM D3080) K* Coefficient of permeability, cm/sec (ASTM D2434) P* Pinhole test (ASTM D4647) DH* Double hydrometer (ASTM D4221) MA* Particle size analysis (ASTM D422) R Laboratory electrical resistivity, ohm-cm (ASTM G57) E* Pressuremeter deformation modulus, tsf (ASTM D4719) PM* Pressuremeter test (ASTM D4719) VS* Field vane shear (ASTM D2573) IR* Infiltrometer test (ASTM D3385) RQD Rock quality designation, percent *Results shown on attached data sheet or graph **ASTM designates American Society for Testing and Materials TERMINOLOGY Particle Sizes Soil layering and Moisture Type Size Range Boulders > 12” Cobbles 3” – 12” Coarse gravel 3/4” – 3” Fine gravel #4 sieve – 3/4” Coarse sand #4 - #10 sieve Medium sand #10-#40 sieve Fine sand #40-#200 sieve Silt 100% passing #200 sieve and > 0.005mm Clay 100% passing #200 sieve and < 0.005mm Term Visual Observation Lamination Up to 1/4” thick stratum Varved Altering laminations of any combination of clay, silt, fine sand, or colors Lenses Small pockets of different soils in a soil mass Stratified Altering layers of varying materials or colors Layer 1/4” to 12” thick stratum Dry Powdery, no noticeable water Moist Damp, below saturation Waterbearing Pervious soil below water Wet Saturated, above liquid limit Gravel Content Standard Penetration Resistance Coarse-Grained Soils Fine-Grained Soils Cohesionless Soils Cohesive Soils % Gravel Description 2-15 A little gravel 16-49 With gravel % Gravel Description < 5 Trace of gravel 5-15 A little gravel 16-30 With gravel 31-49 Gravelly N-Value Relative Density 0-4 Very loose 5-10 Loose 11-30 Medium dense 31-50 Dense > 50 Very dense N-Value Consistency 0-4 Very soft 5-8 Soft 9-15 Firm 16-30 Hard > 30 Very hard NOTICE TO REPORT USERS BORING LOG INFORMATION Subsurface Profiles The subsurface stratification lines on the graphic representation of the test borings show an approximate boundary between soil types or rock. The transition between materials is approximate and is usually far more gradual than shown. Estimating excavation depths, soil volumes and other computations relying on the subsurface strata may not be possible to any degree of accuracy. Water Level WSB & Associates, Inc. took groundwater level readings in the exploratory borings, reviewed the data obtained, and discussed its interpretation of the data in the text of this report. The groundwater level may fluctuate due to seasonal variations caused by precipitation, snowmelt, rainfalls, construction or remediation activities, and/or other factors not evident at the time of measurement. The actual determination of the subsurface water level is an interpretative process. Subsurface water level may not be accurately depicted by the levels indicated on the boring logs. Normally, a subsurface exploration obtains general information regarding subsurface features for design purposes. An accurate determination of subsurface water levels is not possible with a typical scope of work. The use of the subsurface water level information provided for estimating purposes or other site review can present a moderate to high risk of error. The following information is obtained in the field and noted under “Water Level Measurements” at the bottom of the log. Sampled Depth: The lowest depth of soil sampling at the time a water level measurement is taken. Casing Depth: The depth to the bottom of the casing or hollow-stem auger at the time of water level measurement. Cave-In Depth: The depth at which the measuring tape stops in the bore hole. Water Level: The point in the bore hole at which free-standing water is encountered by a measuring tape dropped from the surface inside the casing. Drilling Fluid Level: Similar to the water level, except the liquid in the bore hole is a drilling fluid. Obstruction Depths Obstructions and/or obstruction depths may be noted on the boring logs. Obstruction indicates the sampling equipment encountered resistance to penetration. It must be realized that continuation of drilling, the use of other drilling equipment or further exploration may provide information other than that depicted on the logs. The correlation of obstruction depths on the log with construction features such as rock excavation, foundation depths, or buried debris cannot normally be determined with any degree of accuracy. For example, penetration of weathered rock by soil sampling equipment may not correlate with removal by certain types of construction equipment. Using this information for estimating purposes often results in a high degree of misinterpretation. Accurately identifying the obstruction or estimating depths where hard rock is present over the site requires a scope of service beyond the normal geotechnical exploration program. The risk of using the information noted on the boring logs for estimating purposes must be understood. Feasibility Report APPENDIX 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 APPENDIX D Public Comments Summary Item #Resident Name Resident Address Phone Comment 1 Troy & Melani Hanisch 14129 Cobbler Avenue 651-322-5778 We have a high school graduation planned for Sunday, June 4, 2017 at our home. 2 Brent Eichten 14232 Cranberry Way 651-322-5390 There are at least four high school seniors in Cranberry Way and Crocus Way. Would like to work around late May and June due to graduation parties. Parking would be an issue (potentially). Suggest not starting until after June 25th. Grad parties: Eichten (Cranberry Way), Mensing (Cranberry Way), Hanisch (Cobbler Avenue), and Nelson (Crocus Way). Also, we have cracked curb in front of our house. 3 Kathleen Rogers 14110 Cobbler Avenue 651-322-7453 Assessment fess - are they transferable to future homeowner(s) if current owner chooses not to pay up front? 4 Dan Hedeen 14278 Cranberry Way 651-344-8959 We have a sewer clean-out pipe in our driveway that’s been causing issues (gets hit by snowblower, moves up and down based on temperature). Is there an opportunity to fix/address this issue as part of this 2017 street improvement project? 5 Craig Nelson 14149 Crocus Way 651-322-4193 We will be having a graduation party likely in early June. 6 Kevin Dobias 14087 Cobbler Avenue 612-695-3590 We have cracked curb at the end of our driveway. November 16, 2016 Neighborhood Meeting Comment Cards / Letters Feasibility Report APPENDIX 2017 Street Improvement Project City of Rosemount Project No. 470 WSB Project No. 2235-100 APPENDIX E Seal Coat Map ?§A@ SÈ G¸WX GªWX G¥WX G±WX ?§A@ ?§A@ DANUBE T R L CROSSMOOR AVECOACHFORDBENGAL AVE WCAMERO LN130T H W A Y AZALEAAVECLARET AVECRANDALL AVE125TH ST W 138TH CHIANTIC R O C U S W A Y AUTUMNCTBANYANDELMAR CTP A T HCROSSCROFTAVE PATH CT S ROBERT TRAKRON AVE (CR 73)PKWYTH ST W (CSAH 42)BISCAYNE AVEDODD BLVDAVESHANNONDARTMOORCT DECEMBER TRL BOULDER AVEBISCAYNE AVEU 145THST W CIMARRONAVEWD A WS ONP LCTDANVILLE AVEWAYA V E DAYTONADARWINCTCURRANTCIR DENVER CTBI T T ER-SWEETC TGLENNCTPATHCRUSHEEN CT C R OLLYPATH132ND CT W 150TH ST W (CSAH 42) MCAND REWS R D W S ROBERT TRL (STH 3)CTC LA R E D O W N SDECEMBERBITTER -S W EETCIRBLOOOMF IELDWAYA U T U M NWOOD D A F FO DILPATHCL O VERLNAUGU STAWAY 155TH ST E U. 149TH ST WTRL BACARDI AVEBONAIRE PATH W 153RD ST W 130TH ST W 151ST ST WDANUBE LNSTATION TRLEVERMOOR BRAZIL AVE156TH ST W AUBURNAVE1 3 6 T H S T W 144TH ST W 131ST ST W DIAMOND PATH (CR 33)155TH ST W 126TH S T W ANGUS AVECHILI AVE147TH ST W 121ST ST W 146TH 143RD ST W BLOOOMFIELDPL B L O O M F IE L D C IR B R ASSPKWY 145TH ST E (CSAH 42) BONAIRE PATH W COBBLER AVEBIRCHWOOD AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BELMONT TRL137TH ST W C O FFEE TRL BLANCA AVED E A R B O R N P A T H 120TH ST W 154TH ST WCT WCT COBALT DR CRYSTALPATH 152ND ST WDANVILLE AVE WDANBURY WAY WDEEPWOODSCTCHARLSTON WAY BOULDER TRL BLOOMFIELDB E L FA S T S T W DEKALB AVE140TH ST W UPPER 143RD 128TH DARLING PATH CANADAAVE145TH ST W C R O S S L O U G H BOXWOOD PATHCORNELL TRL 158TH ST W 148TH ST W 142ND ST W 136TH ST W 138TH BOLIVIA AVE W138TH ST W BIRCH COVINGTON AVED A R T M O U T H P A T H BUNRATTY AVEBEECH ST W CTCROSSGLENNPATH147TH ST W BRI LLI ANTCAMBRIAN AVEDANE AVEBURMA AVEU. 138TH ST W COLORADO AVEC O U C H T O W NCHINCHILLA AVECOBBLESTONELNDELLWOODWAY124TH CT W BRIANBORU AVEDAVENPORTAVECHIPPENDALE AVEA U T U M N WO O DC T A ZA LE A C R O S S R I D G EWAY A V E ST STW COBAL TLANEDAISY CT154TH CT W DALTON ATRIU M AVE CARROUSELWAYU. 147TH ST WDANNERUPPER 135TH ST W BAYBERRY T RL CARDINAL L. 147THDAWSON CTDAVENPORT PATH DAHLIACT CASCADE 158TH CT W 157TH CT W D A M A S K 127TH CT W 153RD ST W DRUMCLIFFE BLANCA AVE W133RD CT W DAMASK AVE13 9T H S T W DAKOTA DR L. 138TH ST W 159TH CT W 157TH ST WDANBURYAVEW CANADA CT CRA NBER R Y W A Y AVE CIR CRUMFIELDAVE160TH ST W (CSAH 46)DANDERCROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W D A L L A S B E LFA S T CRESTVIEW152ND CT W 124THST W DAPHNELNDO DDBELMONT COLUMBIAL. 150TH ST W WAY COPPERCTDANBURYDANVILLE AVEWAUT U M N WOODAVANTI CHILI CT BUSINESSPKWYB AY B E R R Y BURNLEY AVEBOYSENBERRY CTCHROMEST W ST W LN CT WDEL T A AV ECRESTONEAVEBLACKBERRY AVECIR150C OLU MBIA151ST CT W CUMBERLANDCANTATA AVE WCHORLEYCHARLSTONCAMFIELDATWOODCIRU 145TH ST W 137THCTCHARLSTON AVEBIRDSONG PATH TRL AVEST WCARDINAL PATHBLOOMF IE L DAVE AVECICERONEBUNDORAN AVEDRUMCLIFFECIR BURGUNDYAVECIRCLEB LU E B E R R YC T141ST CROCUSDAVYCT C TDIAMOND PATH (CSAH 33)APPALACHIANTRLBIRDSONG CT BIS C A Y NEWAYP A T H C R U M P E TPATH C R O M W E L LTRL COUCHTOWN136TH ST W BROUGHSHANEAVEDANBURYDAKOTALNBAYBERRYST W A UTUM NW O O D W A YCHINCHILLA CTAT WOOD AV E C T COLESHIRE PATHCORLISS TRL 137TH ST CORCORANAVECORCHMANAVECROMPTONCROSS CROFT PL156 T H STW C R E G G SCIR C R A N F O R DCIR A UDOBA NWAYTRL CONN T R L 153RD ST W 143RD ST W CANADA AVEDANBURY WAY W148TH ST W BISCAYNE AVE147TH ST W U.149TH 136TH ST WBLANCA AVE W154TH ST W 149TH 158TH ST W 151ST ST W 156TH ST W 146TH ST W DODD BLVDCROSSLOUGH TRLBLANCA AVE WDO D D CIMARRONAVEW120TH ST W UPPER 149TH ST W U.149H ST W 155TH ST W AUTUMN147TH ST W CIMARRONAVEW152ND 144TH ST W CRO MPTO NCROMW ELL 1 5 1 S T S T W CIMARRON A V E CLAR E DO W NS146TH ST W DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W CHILI AVE12 8 T H 143RD ST W CLARET AVEU. 148THST W CICERONEP A T HWAYDERRY-DANUBE LN S ROBE RT T RL DECEMBERWAY C H E R R YCOLUM BARY CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIRCOUCH-TOWNEVERLEIGH CIR DERBYCIR CRESTONECIRCRESTVIEWCIRC LA R E TC IR CIMARRON CIMARRON CTT R L CTD E W B E R R Y C T DARJEELINGCT 155TH C T W COLUMBARY CIR CHOKECHERRY AVEU. 149TH CTBRENNER CT BOSTONCIR D E L T A C TDAVENPORTCT 143RD ST WCROFTONCT CRESCENT CIR CHASEWOOD CTC H E S T N U TWA YCROSSC LIFFE PL ATWOODCTB IR M IN G H A M C T BELVIDERE CT DELLWOOD CT DARNELL CT DALLASCTDELTA PLCROOKHAVEN CTD E R R Y -M O O R C T PATHDANUBECTDRUMCLIFFECT PKWYDRUMCLIFFE 142NDST W C I RCTWAYCORLISS W AYU. 156TH W156TH CT WDARLING PATHDARLING PATH CINNA M ONWAYCORNELLCT N CTCRESTONECTCRESTONEPATHTRL CANADA CIRCHEVELLECT151ST ST WDAMASKC T C O R M A C KCIR WAYCOBBLESTONECT 132ND ST W B E L L EC T 142N D C T WBREMEN AVEC TAKRON AVEWAY1 3 5 T H S T W 1 3 3 R D S T BRI CK PATHWAY AVEBRASS PKWYGEM AVEBLANCACTBLARNEYCT PATHBR ON Z ECT ATWOODATWATERPATHATWOODAVE AVE ATRIUM ATHENA CTATWATERCTATHENACOACHFORDAVE BLANCACORM O R A NT WAYCTCARRAC H WAYPATH C A R R A CH AVE CARRACHAVECROLLYCT BLOO M F I ELDPATH B LVD ATWATER WAY CT AVEDANVILLE CT BIRNAMWOODBIRCHWOODAVEW A Y 139TH ST WAVEA V E CT CONNEMARA AVAL O N PATH LN B ENTLEYST W CIC E RONEPATHBOISECIRWAYCOACHFORD ST W BELMONT TR DARJEELINGPATHC O R N ELL 140T H ST W AUBURNA VE (CSAH 38)(STH 3)AZALEA P A THC O B A L T A V E 140TH ST W D A L LARAAVEWDANBURYPATHPATH AVEC O UC H TO W N C TC O UCHTOWN C T WAY 144THST W TRL (STH 3)AKRON AVE (CR 73)160TH ST W (CSAH 46)S ROBERT(STH 3)MARACON N EU 145TH ST W 146THST W 145TH ST W CHRYSLERDAYBREAK AVEAURORA AVE TRL 160TH ST W (CSAH 46)BROCKE M A R ACARLINGFORDCARLINGFORDLANE B O ULD ER CT 134TH ST W BRICK PATH140TH CIR BURGUNDY CTBURGUNDY WAYBURMA AVEBURNLEY WAYWAYCROSS C LIFFEPATHSHANNONPKWY CROSSMOORAVEST WDODD BLVDCARBURYWAYE V ERMOORPKWY---- 149TH ST W1 3 5 T H S T WBRONZE PKWY133RD ST BRONZE PKWYBUTTERFLY PATH134 TH S T CARBURYAVECOA C HFORDAVE L 147THCT ABBEYFIELDAVEABBEYFIELD CT AILESBURYCT141STST E ADDISONCTA D A I R A V E 149TH ST W ALBANYAVEALLINGHAMAVE141STST E 140TH ST E ALMAAVEADELAIDEAVEABERCORNAVE AILESBURY AV E ADRIANCT139TH STCROSSMOORCT131STSTAYRFIELDCTAYRFIELDCIRADEL L E AV E138 T H STE ADDISIONAVEALDBOROUGHAVEALMA CIRDODD BLVD125TH CT AULDEN AVE O'LEARY'SPOND WENNSMANPONDERICKSON PONDWACHTERLAKE VALLEYOAKPOND SHANNONPOND HAWKINSPOND COPPER POND SCHWARZPOND MARE POND BIRGERPOND KEEGANLAKE MAREPOND KEEGANLAKE MCMENOMYPOND WILDELAKE KIRSCHNERMARSH GERONOMIEPONDM e a d o w s P a rk CentralParkInnisfree ParkBirchPark B loo m field P arkClaretPark EricksonPark CarrollsWoodsPark RMSPark Old City Hall Park Charlie's Park JayceePark LionsPark ShannonPark Winds ParkTwin P uddlesKidderParkBiscayne ParkConnemaraPark Schwarz Pond Park Tw in PuddlesDallaraPark Innisfree Park Schwarz Pond Park FamilyRes Ctr ChippendalePark CamfieldPark BrockwayPark BrockwayPark Ames SoccerComplex UMore BallPark Ailesbury Park Flint HillsAthletic Complex WiklundPreserve Horseshoe Park Proposed 3-Year SealcoatImprovements 2017, 2018 & 2019 Document Path: T:\GIS\City\Maps\Departmental Maps\Engineering\Seal Coating\Proposed 3 Year SealCoat_8x11.mxd 2017 2018 2019 CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2016 - A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND AUTHORIZING THE PREPARATION OF PLANS AND SPECIFICATIONS 2017 STREET IMPROVEMENTS PROJECT CITY PROJECT 470 WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota, consider constructing certain improvements, to-wit: City Project 470, 2017 Street Improvements Project, in the City as described in and in accordance with the feasibility report prepared by the City Engineer; and WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements are feasible, and should best be made as proposed, and the City Engineer’s report to this effect has heretofore been received by Council, and filed with the City Clerk on December 20, 2016. NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility report for City Project 470 and places it on file. BE IT FURTHER RESOLVED, that the City Council of the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project 470. ADOPTED this 20th day of December, 2016. William H. Droste, Mayor ATTEST: Clarissa Hadler, City Clerk 701 Xenia Avenue South | Suite 300 | Minneapolis, MN 55416 | (763) 541-4800 Building a legacy – your legacy. Equal Opportunity Employer | wsbeng.com K:\01005-000\Admin\Contract\LTR Proposal - 2017 SIP Final Design 20161202.docx December 2, 2016 Mr. Dwight Johnson City Administrator City of Rosemount 2875 145th Street West Rosemount, MN 55068 Re: Scope and Estimated Fee to Provide Professional Engineering Services for 2017 Street Improvement Project Final Design Dear Mr. Johnson: We appreciate the opportunity to present this proposal for professional services related to the 2017 Street Improvement Project. This letter proposal outlines the services required to prepare all necessary documents to complete plans and specifications. PROJECT BACKGROUND At the May 3, 2016 City Council meeting, Council authorized preparation of a Feasibility Report for the 2017 Street Improvement Project. The 2017 Street Improvement Project includes the following improvements: Pavement Reconstruction  Shannon Parkway ▫ CSAH 42 to CSAH 46 Mill and Overlay  Shannon Hills Neighborhood ▫ Cobbler Ave ▫ Crocus Way ▫ Cranberry Way ▫ Clover Lane  Jaycee Park Parking Lot The schedule for the project is to begin construction in June 2017 and it is anticipated to be completed by September 2017. PROJECT APPROACH/SCOPE OF SERVICES WSB’s project scope and proposed work plan are based on our understanding of the project as previously described. In order to complete the project, we propose the following scope of services: Final Design WSB will complete final design services, including, but not limited to:  Plans and specifications  Quantity and cost estimates  Assessment rolls and calculations  Bidding documents  Staff reports  Improvement and assessment hearings  City Council meetings Dwight Johnson - City of Rosemount December 2, 2016 Page 2 of 2 K:\01005-000\Admin\Contract\LTR Proposal - 2017 SIP Final Design 20161202.docx SCHEDULE WSB will complete the project for a construction start date of June 2017. Following is a proposed detailed schedule:  Authorize Preparation of Plans and Specifications December 20, 2016  Receive Final Plans and Specifications/Authorize Ad for Bid February 21, 2017  Bid Opening March 24, 2017  Receive Bids/Order Improvement and Assessment Hearings April 4, 2017  Improvement and Assessment Hearings/Award Contract May 2, 2017  Begin Construction June 1, 2017 PROPOSED FEE We propose to conduct Final Design work on an hourly basis for an estimated fee of $ 56,950. We will review our progress weekly and will not exceed this amount without your prior approval should the scope of the project change. This letter represents our entire understanding of the project scope. If you are in agreement, please sign on the space provided and return one original signed copy to us for our records. We will start immediately upon receipt of the signed agreement. If you have any questions concerning the work plan or fee as discussed, please feel free to contact me at (763) 287-7191. We look forward to working with you and greatly appreciate the opportunity to assist you and your staff in the completion of this project. Sincerely, WSB & Associates, Inc. Andy Brotzler, PE Monica Heil, PE Principal/Senior Project Manager Senior Project Manager Attachment cc: John Morast, City of Rosemount Mitch Hatcher, WSB & Associates, Inc. AB/MH/jmh ACCEPTED BY: CITY OF ROSEMOUNT, MN I hereby authorize WSB & Associates, Inc. to complete the services identified above not to exceed $56,950 without prior approval. Signature: Date: Name: Title: Task Description11.1 Surveying 12 3547$7,336.001.2 Design40 60 60 60220$25,620.001.3 Specifications 12 12 6 838$4,244.001.4 Quantity Tabulations and Cost Estimate 8 8 824$2,744.001.5 Meetings 6 16 1638$4,964.001.6 QA / QC 86822$2,814.001.7 Bidding Preparation and Analysis 8 8824$2,688.001.8 City Coordination 20 6080$6,540.00Task 1 Total Estimated Hours and Fee 14 104 104 74 60 72 22 35 8 493 $56,950.00Total Estimated Hours 14 104 104 74 60 72 22 35 8 493Average Hourly Billing Rate158.00 147.00 104.00 92.00 60.00 133.00 85.00 164.00 130.00Total Fee by Labor Classification $2,212.00 $15,288.00 $10,816.00 $6,808.00 $3,600.00 $9,576.00 $1,870.00 $5,740.00 $1,040.00 $56,950.00TOTAL PROJECT COST $56,950.00CostTotal HoursConstruction SpecialistFinal DesignProject EngineerProject ManagerProject Engineer (City Billing Rate)Engineering TechnicianEstimate of CostCity of Rosemount, MinnesotaProfessional Engineering Services2017 Street Improvement Project - Final DesignEstimated HoursPrincipalAdminGraduate EngineerTwo Person Survey Crew ?§A@ SÈ G¸WX GªWX G¥WX G±WX ?§A@ ?§A@ DANUBE T R L CROSSMOOR AVECOACHFORDBENGAL AVE WCAMERO LN130T H W A Y AZALEAAVECLARET AVECRANDALL AVE125TH ST W 138TH CHIANTIC R O C U S W A Y AUTUMNCTBANYANDELMAR CTP A T HCROSSCROFTAVE PAT H CT S ROBERT TRAKRON AVE (CR 73)PKWYTH ST W (CSAH 42)BISCAYNE AVEDODD BLVDAVESHANNONDARTMOORCT DECEMBER TRL BOULDER AVEBISCAYNE AVEU 145THST W CIMARRONAVEWD A WS O NP LCTDANVILLE AVEWAYA V E DAYTONADARWINCTCURRANTCIR DENVER CTBI TTER-SWEETC TGLENNCTPATHCRUSHEEN CT C R OLLYPATH132ND CT W 150TH ST W (CSAH 42) MCAN DRE WS R D W S ROBERT TRL (STH 3)CTC LA R E D O W N S DECEMBERBITTER -S W EETCIRBLOOOMF IELDWAYA U T U M NWOOD D A F FO DILPATHCL O VERLNAUGU S TAWAY U. 149TH ST WTRL BACARDI AVEBONAIRE PATH W 153RD ST W 130TH ST W 151ST ST WDANUBE LNSTATION TRLEVERMOOR BRAZIL AVE156TH ST W AUBURNAVE1 3 6 T H S T W 144TH ST W 131ST ST W DIAMOND PATH (CR 33)155TH ST W 126TH ST W ANGUS AVECHILI AVE147TH ST W 121ST ST W 146TH 143RD ST W BLOOOMFIELDPL B L O O M F IE L D C IR B R ASSPKWY BONAIRE PATH W COBBLER AVEBIRCHWOOD AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BELMONT TRL137TH ST W C OFFEE TRL BLANCA AVED E A R B O R N P A T H 120TH ST W 154TH ST WCT WCT COBALT DR CRYSTALPATH 152ND ST WDANVILLE AVE WDANBURY WAY WDEEPWOODSCTCHARLSTO N WAY BOULDER TRL BLOOMFIELDB E L F A S T S T W DEKALB AVE140TH ST W UPPER 143RD 128TH DARLING PATH CANADAAVE145TH ST W C R O S S L O U G H BOXWOOD PATHCORNELL TRL 158TH ST W 148TH ST W 142ND ST W 136TH ST W 138TH BOLIVIA AVE W138TH ST W BIRCH COVINGTON AVED A R T M O U T H P A T H BUNRATTY AVEBEECH ST W CTCROSSGLENNPATH147TH ST W BRI LLI ANTCAMBRIAN AVEDANE AVEBURMA AVEU. 138TH ST W COLORADO AVEC O U C H T O W NCHINCHILLA AVECOBBLESTONELNDELLWOODWAY124TH CT W BRIANBORU AVEDAVENPORTAVECHIPPENDALE AVEA U T U M N WO O DC T A ZA LE A C R O S S R I D G EWAY A V E ST STW COBALTLANEDAISY CT154TH CT W DALTON ATRIU M AVE CARROUSELWAYU. 147TH ST WDANNERUPPER 135TH ST W BAY BE RRY TRL CARDINAL L. 147THDAWSON CTDAVENPORT PATH DAHLIACT CASCADE 158TH CT W 157TH CT W D A M A S K 127TH CT W 153RD ST W DRUMCLIFFE BLANCA AVE W133RD CT W DAMASK AVE139T H S T W DAKOTA DR L. 138TH ST W 159TH CT W 157TH ST WDANBURYAVEW CANADA CT CRA NBER R Y W A Y AVE CIR CRUMFIELDAVE160TH ST W (CSAH 46)DANDERCROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W D A L L A S B E L F A S T CRESTVIEW152ND CT W 124THST W DAPHNELND O DDBELMONT COLUMBIAL. 150TH ST W WAY COPPERCTDANBURYDANVILLE AVEWAUT U M N WOOD AVANTI CHILI CT BUSINESSPKWYB AY B E R R Y BURNLEY AVEBOYSENBERRY CTCHROMEST W ST W LN CT WDEL T A AVECRESTONEAVEBLACKBERRY AVECIR150C OLU MBIA151ST CT W CUMBERLANDCANTATA AVE WCHORLEYCHARLSTONCAMFIELDATWOODCIRU 145TH ST W 137THCTCHARLSTON AVEBIRDSONG PATH TRL AVEST WCARDINAL PATHBLOOMF I E L DAVE AVECICERONEBUNDORAN AVEDRUMCLIFFECIR BURGUNDYAVECIRCLEB LU EB ER RYC T141ST CROCUSDAVYCT C TDIAMOND PATH (CSAH 33)APPALACHIANTRLBIRDSONG CT BIS C A Y NEWAYP A T H C R U M P E TPATH C R O M W E L LTRL COUCHTOWN136TH ST W BROUGHSHANEAVEDANBURYDAKOTALNBAYBERRYST W AU TUM NW O O D W A YCHINCHILLA CTAT WOOD AVEC T COLESHIRE PATHCORLISS TRL 137TH ST CORCORANAVECORCHMANAVECROMPTONCROSS CROFT PL156 T H STW C R E G G SCIR C R A N F O R DCI R A UDOBA NWAYTRL CONN T R L 153RD ST W 143RD ST W CANADA AVEDANBURY WAY W148TH ST W BISCAYNE AVE147TH ST W U.149TH 136TH ST WBLANCA AVE W154TH ST W 149TH 158TH ST W 151ST ST W 156TH ST W 146TH ST W DODD BLVDCROSSLOUGH TRLBLANCA AVE WD O D D CIMARRONAVEW120TH ST W UPPER 149TH ST W U.149H ST W 155TH ST W AUTUMN147TH ST W CIMARRONAVEW152ND 144TH ST W C R O MPTO NCROM WELL1 5 1 S T S T W CIMARRON A V E CLAR E DO W NS146TH ST W DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W CHILI AVE1 2 8 T H 143RD ST W CLARET AVEU. 148THST W CICERONEP A T HWAYDERRY-DANUBE LN S ROBE RT T RL DECEMBERWAY C H E R R YCOLUM BARY CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIRCOUCH-TOWNEVERLEIGH CIR DERBYCIR CRESTONECIRCRESTVIEWCIRC LA R ETC IR CIMARRON CIMARRON CTT R L CTD E W B E R R Y C T DARJEELINGCT 155TH C T W COLUMBARY CIR CHOKECHERRY AVEU. 149TH CTBRENNER CT BOSTONCIR D E LT A C TDAVENPORTCT 143RD ST WCROFTONCT CRESCENT CIR CHASEWOOD CTC H E S T N U TWA YCROSSC LIFFE PL ATWOODCTB IR M IN G H A M C T BELVIDERE CT DELLWOOD CT DARNELL CT DALLASCTDELTA PLCROOKHAVEN CTD E R R Y -M O O R C T PATHDANUBECTDRUMCLIFFECT PKWYDRU MCLIFFE 142NDST W C I RCTWAYCORLISS W A YU. 156TH W156TH CT WDARLING PATHDARLING PATH CINNA M ONWAYCORNELLCT N CTCRESTONECTCRESTONEPATHTRL CANADA CIRCHEVELLECT151ST ST WDAMASKC T C O R M A C KCI R WAYCOBBLESTONECT 132ND ST W B E L L EC T 142N D C T WBREMEN AVECTAKRON AVEWAY1 3 5 T H S T W 1 3 3 R D S T BRI CK PATHWAY AVEBRASS PKWYGEM AVEBLANCACTBLARNEYCT PATHB R O N Z ECT ATWOODATWATERPATHATWOODAVE AVE ATRIUM ATHENA CTATWATERCTATHENACOACHFORDAVE BLANCACORM O R ANT WAYCTCARRAC H WAYPATH C A R R A C H AVE CARRACHAVECROLLYCT BLOO M F IELDPATH BLVDATWATER WAY CT AVEDANVILLE CT BIRNAMWOODBIRCHWOODAVEW A Y 139TH ST WAVEA V E CT CONNEMARA AVAL O N PATH LNB E NTLEYST W CIC E RONEPATHBOISECIRWAYCOACHFORD ST W BELMONT TR DARJEELINGPATHCO R N E LL 140T H ST W AUBURNAVE (CSAH 38)(STH 3)AZALEA P A THC O B A L T A V E 140TH ST W D A LLARAAVEWDANBURYPATHPATH AVEC O U C H TO W N C TC O UCHTOWN C T WAY 144THST W TRL (STH 3)AKRON AVE (CR 73)160TH ST W (CSAH 46)S ROBERT(STH 3)MARACON N EU 145TH ST W 146THST W 145TH ST W CHRYSLERDAYBREAK AVEAURORA AVE TRL 160TH ST W (CSAH 46)BROCKE M A R ACARLINGFORDCARLINGFORDLANE B O ULDE R CT 134TH ST W BRICK PATH140TH CIR BURGUNDY CTBURGUNDY WAYBURMA AVEBURNLEY WAYWAYCROSS C LIFFEPATHSHANNONPKWY CROSSMOORAVEST WDODD BLVDCARBURYWAYE V ERMOORPKWY---- 149TH ST W1 3 5 T H S T WBRONZE PKWY133RD ST BRONZE PKWYBUTTERFLY PATH1 3 4 T H S T CARBURYAVECOA C HFORDAVE L 147THCT ABBEYFIELDAVEABBEYFIELD CT AILESBURYCT141STST E ADDISONCTA D A I R A V E 149TH ST W ALBANYAVEALLINGHAMAVE141STST E 140TH ST E ALMAAVEADELAIDEAVEABERCORNAVE AILESBURY AVE ADRIANCT139TH STCROSSMOORCT131STSTAYRFIELDCTAYRFIELDCIRADEL L E AV E138THSTE ADDISIONAVEALDBOROUGHAVEALMA CIRDODD BLVD125TH CT AULDEN AVE ?§A@ SÈ G¸WX GªWX G¥WX G±WX ?§A@ ?§A@ DANUBE T R L CROSSMOOR AVECOACHFORDBENGAL AVE WCAMERO LN130T H W A Y AZALEAAVECLARET AVECRANDALL AVE125TH ST W 138TH CHIANTIC R O C U S W A Y AUTUMNCTBANYANDELMAR CTP A T HCROSSCROFTAVE PAT H CT S ROBERT TRAKRON AVE (CR 73)PKWYTH ST W (CSAH 42)BISCAYNE AVEDODD BLVDAVESHANNONDARTMOORCT DECEMBER TRL BOULDER AVEBISCAYNE AVEU 145THST W CIMARRONAVEWD A WS O NP LCTDANVILLE AVEWAYA V E DAYTONADARWINCTCURRANTCIR DENVER CTBI TTER-SWEETC TGLENNCTPATHCRUSHEEN CT C R OLLYPATH132ND CT W 150TH ST W (CSAH 42) MCAN DRE WS R D W S ROBERT TRL (STH 3)CTC LA R E D O W N S DECEMBERBITTER -S W EETCIRBLOOOMF IELDWAYA U T U M NWOOD D A F FO DILPATHCL O VERLNAUGU S TAWAY U. 149TH ST WTRL BACARDI AVEBONAIRE PATH W 153RD ST W 130TH ST W 151ST ST WDANUBE LNSTATION TRLEVERMOOR BRAZIL AVE156TH ST W AUBURNAVE1 3 6 T H S T W 144TH ST W 131ST ST W DIAMOND PATH (CR 33)155TH ST W 126TH ST W ANGUS AVECHILI AVE147TH ST W 121ST ST W 146TH 143RD ST W BLOOOMFIELDPL B L O O M F IE L D C IR B R ASSPKWY BONAIRE PATH W COBBLER AVEBIRCHWOOD AVEDELFT AVE WCAMEO AVE148TH ST WDALLARA BELMONT TRL137TH ST W C OFFEE TRL BLANCA AVED E A R B O R N P A T H 120TH ST W 154TH ST WCT WCT COBALT DR CRYSTALPATH 152ND ST WDANVILLE AVE WDANBURY WAY WDEEPWOODSCTCHARLSTO N WAY BOULDER TRL BLOOMFIELDB E L F A S T S T W DEKALB AVE140TH ST W UPPER 143RD 128TH DARLING PATH CANADAAVE145TH ST W C R O S S L O U G H BOXWOOD PATHCORNELL TRL 158TH ST W 148TH ST W 142ND ST W 136TH ST W 138TH BOLIVIA AVE W138TH ST W BIRCH COVINGTON AVED A R T M O U T H P A T H BUNRATTY AVEBEECH ST W CTCROSSGLENNPATH147TH ST W BRI LLI ANTCAMBRIAN AVEDANE AVEBURMA AVEU. 138TH ST W COLORADO AVEC O U C H T O W NCHINCHILLA AVECOBBLESTONELNDELLWOODWAY124TH CT W BRIANBORU AVEDAVENPORTAVECHIPPENDALE AVEA U T U M N WO O DC T A ZA LE A C R O S S R I D G EWAY A V E ST STW COBALTLANEDAISY CT154TH CT W DALTON ATRIU M AVE CARROUSELWAYU. 147TH ST WDANNERUPPER 135TH ST W BAY BE RRY TRL CARDINAL L. 147THDAWSON CTDAVENPORT PATH DAHLIACT CASCADE 158TH CT W 157TH CT W D A M A S K 127TH CT W 153RD ST W DRUMCLIFFE BLANCA AVE W133RD CT W DAMASK AVE139T H S T W DAKOTA DR L. 138TH ST W 159TH CT W 157TH ST WDANBURYAVEW CANADA CT CRA NBER R Y W A Y AVE CIR CRUMFIELDAVE160TH ST W (CSAH 46)DANDERCROCUSAVEU. 148TH ST WDAHOMEY AVE W149TH ST W D A L L A S B E L F A S T CRESTVIEW152ND CT W 124THST W DAPHNELND O DDBELMONT COLUMBIAL. 150TH ST W WAY COPPERCTDANBURYDANVILLE AVEWAUT U M N WOOD AVANTI CHILI CT BUSINESSPKWYB AY B E R R Y BURNLEY AVEBOYSENBERRY CTCHROMEST W ST W LN CT WDEL T A AVECRESTONEAVEBLACKBERRY AVECIR150C OLU MBIA151ST CT W CUMBERLANDCANTATA AVE WCHORLEYCHARLSTONCAMFIELDATWOODCIRU 145TH ST W 137THCTCHARLSTON AVEBIRDSONG PATH TRL AVEST WCARDINAL PATHBLOOMF I E L DAVE AVECICERONEBUNDORAN AVEDRUMCLIFFECIR BURGUNDYAVECIRCLEB LU EB ER RYC T141ST CROCUSDAVYCT C TDIAMOND PATH (CSAH 33)APPALACHIANTRLBIRDSONG CT BIS C A Y NEWAYP A T H C R U M P E TPATH C R O M W E L LTRL COUCHTOWN136TH ST W BROUGHSHANEAVEDANBURYDAKOTALNBAYBERRYST W AU TUM NW O O D W A YCHINCHILLA CTAT WOOD AVEC T COLESHIRE PATHCORLISS TRL 137TH ST CORCORANAVECORCHMANAVECROMPTONCROSS CROFT PL156 T H STW C R E G G SCIR C R A N F O R DCI R A UDOBA NWAYTRL CONN T R L 153RD ST W 143RD ST W CANADA AVEDANBURY WAY W148TH ST W BISCAYNE AVE147TH ST W U.149TH 136TH ST WBLANCA AVE W154TH ST W 149TH 158TH ST W 151ST ST W 156TH ST W 146TH ST W DODD BLVDCROSSLOUGH TRLBLANCA AVE WD O D D CIMARRONAVEW120TH ST W UPPER 149TH ST W U.149H ST W 155TH ST W AUTUMN147TH ST W CIMARRONAVEW152ND 144TH ST W C R O MPTO NCROM WELL1 5 1 S T S T W CIMARRON A V E CLAR E DO W NS146TH ST W DANVILLEAVEDANVILLE AVE WLOWER 147TH ST W CHILI AVE1 2 8 T H 143RD ST W CLARET AVEU. 148THST W CICERONEP A T HWAYDERRY-DANUBE LN S ROBE RT T RL DECEMBERWAY C H E R R YCOLUM BARY CTCTCORNELLCT SCRYSTALDAPPLECIRDAPPLE CTCARDINALCIRCOUCH-TOWNEVERLEIGH CIR DERBYCIR CRESTONECIRCRESTVIEWCIRC LA R ETC IR CIMARRON CIMARRON CTT R L CTD E W B E R R Y C T DARJEELINGCT 155TH C T W COLUMBARY CIR CHOKECHERRY AVEU. 149TH CTBRENNER CT BOSTONCIR D E LT A C TDAVENPORTCT 143RD ST WCROFTONCT CRESCENT CIR CHASEWOOD CTC H E S T N U TWA YCROSSC LIFFE PL ATWOODCTB IR M IN G H A M C T BELVIDERE CT DELLWOOD CT DARNELL CT DALLASCTDELTA PLCROOKHAVEN CTD E R R Y -M O O R C T PATHDANUBECTDRUMCLIFFECT PKWYDRU MCLIFFE 142NDST W C I RCTWAYCORLISS W A YU. 156TH W156TH CT WDARLING PATHDARLING PATH CINNA M ONWAYCORNELLCT N CTCRESTONECTCRESTONEPATHTRL CANADA CIRCHEVELLECT151ST ST WDAMASKC T C O R M A C KCI R WAYCOBBLESTONECT 132ND ST W B E L L EC T 142N D C T WBREMEN AVECTAKRON AVEWAY1 3 5 T H S T W 1 3 3 R D S T BRI CK PATHWAY AVEBRASS PKWYGEM AVEBLANCACTBLARNEYCT PATHB R O N Z ECT ATWOODATWATERPATHATWOODAVE AVE ATRIUM ATHENA CTATWATERCTATHENACOACHFORDAVE BLANCACORM O R ANT WAYCTCARRAC H WAYPATH C A R R A C H AVE CARRACHAVECROLLYCT BLOO M F IELDPATH BLVDATWATER WAY CT AVEDANVILLE CT BIRNAMWOODBIRCHWOODAVEW A Y 139TH ST WAVEA V E CT CONNEMARA AVAL O N PATH LNB E NTLEYST W CIC E RONEPATHBOISECIRWAYCOACHFORD ST W BELMONT TR DARJEELINGPATHCO R N E LL 140T H ST W AUBURNAVE (CSAH 38)(STH 3)AZALEA P A THC O B A L T A V E 140TH ST W D A LLARAAVEWDANBURYPATHPATH AVEC O U C H TO W N C TC O UCHTOWN C T WAY 144THST W TRL (STH 3)AKRON AVE (CR 73)160TH ST W (CSAH 46)S ROBERT(STH 3)MARACON N EU 145TH ST W 146THST W 145TH ST W CHRYSLERDAYBREAK AVEAURORA AVE TRL 160TH ST W (CSAH 46)BROCKE M A R ACARLINGFORDCARLINGFORDLANE B O ULDE R CT 134TH ST W BRICK PATH140TH CIR BURGUNDY CTBURGUNDY WAYBURMA AVEBURNLEY WAYWAYCROSS C LIFFEPATHSHANNONPKWY CROSSMOORAVEST WDODD BLVDCARBURYWAYE V ERMOORPKWY---- 149TH ST W1 3 5 T H S T WBRONZE PKWY133RD ST BRONZE PKWYBUTTERFLY PATH1 3 4 T H S T CARBURYAVECOA C HFORDAVE L 147THCT ABBEYFIELDAVEABBEYFIELD CT AILESBURYCT141STST E ADDISONCTA D A I R A V E 149TH ST W ALBANYAVEALLINGHAMAVE141STST E 140TH ST E ALMAAVEADELAIDEAVEABERCORNAVE AILESBURY AVE ADRIANCT139TH STCROSSMOORCT131STSTAYRFIELDCTAYRFIELDCIRADEL L E AV E138THSTE ADDISIONAVEALDBOROUGHAVEALMA CIRDODD BLVD125TH CT AULDEN AVE Path: T:\GIS\City\Maps\Departmental Maps\Engineering\Pavement\2017\2017 CIP.mxd1,600 0 1,600800 Feet2017 CIP MILL & OVERLAY RECLAMATION SEALCOAT SHANNONHILLS Jaycee Park