HomeMy WebLinkAbout6.h. Change Order #1, Payment 8 and final for Biscayne Point 4th Addition, City Project 352CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE December 21, 2004
AGENDA ITEM: Change Order #1, Payment #8 and Final for
AGENDA SECTION:
Biscayne Pointe 4 th Addition, CP #352
Consent
PREPARED BY: Anthony A Aderhold, P E Project Engineer
All N 1
$1,029 53
ATTACHMENTS: Change Order #1, Payment Voucher #8
APPROVED BY:
and Final
RECOMMENDED ACTION: Motion to approve Change Order #1 and authorize
necessary signatures and approve Payment #8 and Final to Three Rivers Construction,
for Biscayne Pointe 4` Addition, Street and Utility Improvements, City Project #352 and
accept for perpetual maintenance
ACTION:
BACKGROUND:
Change Order #1, Biscayne Pointe 4 Addition, Street and Utility Improvements,
City Project #352 includes the addition of $12,215 37 to the original contract amount of
$1,035,949 62, for a new total of $1,048,164 99 The work included under Change
Order #1 was additional grading and erosion control deemed necessary by storm water
basins
All work included as part of Change Order #1 will be funded by the developer
Also part of this agenda item is to request Payment #8 and final to Three Rivers
Construction, in the amount of $65,456 65, for the Biscayne Pointe 4 th Addition, Street
and Utility Improvements, City Project #352 The revised contract amount as
mentioned previously was $1,048,164 99 and the final total cost for the project was
$1,029,624 53 A revised contract amount was the result of the aforementioned
change order
The final breakdown for funding of the project for City and Developer is as follows
Heritage Development
City of Rosemount
Total
$922,15831
$107,46622
$1,029 53
The City portion is being funded by $107,466 22 from the Storm Core Fund
SUMMARY:
Staff recommends that Council approve Change Order #1, Payment #8 and final for the
project and accept for perpetual maintenance subject to the following conditions
Satisfactory showing that the contractor has complied with the provisions of
Minnesota Statutes 290 92 requiring withholding state income tax
2 Evidence in the form of an affidavit that all claims against the contractor by
reasons of the contract have been fully paid or satisfactorily secured
3 Consent of Surety to Final Payment Certification from the contractor's surety
4 Two -year maintenance bond
CHANGE ORDER NO 1
BISCAYNE POINTE 4TH ADDITION December 7, 2004
STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK
CITY OF ROSEMOUNT, MN
CITY PROJECT NO 352 WSB PR OJECT NO 1458 -00
OWNER
City of Rosemount
2875 145th Street West
Rosemount, MN 55068
CONTRACTOR
Three Rivers Construction
15001 Hudson Road
Lakeland, MN 55043
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
ITEM 105 ADDITIONAL EROSION CONTROL AND GRADING WORK
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE,
OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
CHANGE IN CONTRACT PRICE CHANGE IN CONTRACT TIME
ORIGINAL CONTRACT PRICE
$1,035,949 62
ORIGINAL CONTRACT TIME
6/1512004
PREVIOUS CHANGE ORDERS N/A
$000
NET CHANGE FROM PREVIOUS CHANGE ORDERS
N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER
$1,035,949 62
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
611512004
NET INCREASE /DECREASE OF THIS CHANGE ORDER
$12,21537
NET INCREASE OF CHANGE ORDER
NIA
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS
$1,048,164 99
CONTRACT TIME WITH APPROVED CHANGE ORDERS
6/15/2004
RECOMMENDED BY
ANTHON q ADERHOLD, PE
WSB 8 ASSOCIATES, INC
ENGINEER
APPROVED BY
THREE RIVERS CONSTRUCTION
APPROVED BY
CITY ENGINEER
CITY ADMINISTRATOR
DATE OF COUNCIL ACTION
1458-00 CC ICO-1
t db Tom«"` i�rfr v�9E Y/ 'u+{ 4T�Y'xruan a. zee= Y€/t3i�M.2*�'� p..
Change Order No 1 Detail
BISCAYNE POINTE 4TH ADDITION
CITY OF ROSEMOUNT, MN
CITY PROJECT NO. 352
ADDITIONAL QUANTITIES
Item No Descri
105 ADDITIONAL EROSION CONTROL AND GRADING
WORK
Unit Price Amount
LUMP SUM $12,21537 $12,21537
TOTAL ADDITIONAL QUANTITIES $12,21537
TOTAL INCREASE CHANGE ORDER NO 1 $12,215 37
1458 -00 CO iC01 Detail
01458 -00 Pay Vouchers 8
Owner: City of Rosemount
2875 145th Street West
Rosemount, MN 55068 -4941
For Period: 11/1/2004 to 11/30/2004For Period: 11/1/2004 to 1 1 /3 012 0 04
Contractor: Three Rivers Construction
k_9)Sporarea,trrc 15001 Hudson Road
Lakeland, MN 55043
Monday, December 13, 2004
Date: 12/13/2004
Request No.: 8 FINAL
Pay Vouchers
RSMT Biscayne Pointe 4th Addition
Client Contract No
Project No 01458 -00
Client Project No 352
Pr Summary
1
Original Contract Amount
$1,035,949 62
2
Contract Changes Addition
$12,21537
3
Contract Changes Deduction
$000
4
Revised Contract Amount
$1,048,164 99
5
Value Completed to Date
81,029,624 53
6
Material on Hand
$000
7
Amount Earned
$1,029,624 53
8
Less Retainage
$0 00
9
Subtotal
$1,029,624 53
10
Less Amount Paid Previously
$964,16788
11
Liquidated Damages
$000
12
AMOUNT DUE THIS PAY VOUCHERS NO 8 FINAL
$65,45665
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED
CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF
WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF
THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE
CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER
Recommended for Approval by
WSB &Associates, Inc.
Approved by Owner.
City of Rosemount
Approved by Contractor
Three Rivers Construction
Specifie Contr ct ompletion Date
6/15/2004
Date
1 of 5
0 145 8-00 Pay Vouchers 8
Project Material Status
Monday, December 11, 2004
Item
No
Its
Descnpnon
Units
Unit Pnce
Contract
QuanOty
Quantity to
Date
Current
Quantity
Amount to
Date
SCHEDULE A- SURFACE IMPROVEMENTS
1
2021501
MOBILIZATION
LUMP SUM
$11,00000
1
1
0
$1100000
2
2104 501
REMOVE CURB AND GUTTER
LIN FT
$3 00
150
20
0
$60 00
3
2104 505
REMOVE BITUMINOUS PAVEMENT
SO YO
$200
200
200
0
$400 00
4
2104 513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$3 00
60
60
0
$180 00
5
2105 507
SUBGRADE EXCAVATION
CU YD
5500
200
0
0
$0 00
6
2105 522
SELECT GRANULAR BORROW (CV)
CU YD
$8 60
300
0
0
$0 00
7
2112 501
SUBGRADE PREPARA710N
ROAD STA
$150 00
46
46
0
$6,900 00
8
2211 501
AGGREGATE BASE CLASS 5 (100% CRUSHED)
TON
$975
6300
5290741
0
$51 58472
9
2350 501
TYPE LV 3 WEARING COURSE MIXTURE (C)
TON
$31 95
1930
1708 25
0
$54,578 59
10
2350 502
TYPE LV 3 NON WEARING COURSE MIXTURE (C)
TON
S3075
1930
194825
0
$59 908 69
11
2357 502
BITUMINOUS MATERIAL FOR TACK COAT
GALLON
$2 00
880
900
0
$1,800 00
12
2451 602
GRANULAR FOUNDATION AND /OR BEDDING
TON
$13 90
50
0
0
$0 00
13
2502 541
4" PERF PVC PIPE DRAIN
LIN FT
$2 50
750
750
0
$1 87500
14
2521 501
6 CONCRETE WALK
SO FT
$2 80
19750
20365
5
$57 02200
15
2531 501
CONCRETE CURB GUTTER DESIGN MODIFIED S
LIN FT
$725
8820
9599
0
$69 592 75
16
2545 52314
NON METALLIC CONDUIT
LIN FT
1 $300
600
620
0
$1 96000
17
2554 602
PERMANENT BARRICADES (TYPE III)
EACH
$240 00
3
3
0
$72000
18
2563 601
TRAFFIC CONTROL
LUMP SUM
$1 25000
1
1
0
S1 250 00
19
2564 531
SIGN PANELS TYPE C
SO FT
$21 00
6 25
16 75
0
$351 75
20
2564 602
FURNISH INSTALL SIGN PANEL TYPE D
EACH
$239 00
7
8
0
$1 91200
21
2573 501
BALE CHECK
EACH
$10 oo
50
0
0
Son
22
2573 502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
$4 00
100
100
0
$40000
23
2575 501
SEEDING
ACRE
$1 45000
2 75
75
2
0
S3 987 50
24
2575 505
SODDING TYPE LAWN (INCL TOPSOIL 8 FERT)
SQ YD
$2 15
7500
6953
0
$14 95
25
2575 523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
$2 00
251
0
0
$000
Totals For Section SCHEDULE A SURFACE IMPROVEMENTS $340,33195
SCHEDULE B SANITARY SEWER
26
2503 602
CONNECT TO EXISTING SANITARY SEWER
EACH
$514 50
2
2
0
$1,02900
27
2503 602
8 "X4" PVC WYE
EACH
$3225
54
52
0
$1 677 00
28
2503 602
15 "X4" PVC WYE
EACH
$13970
17
19
0
$2,654 30
29
2503 603
TELEVISE SANITARY SEWER
LIN FT
$0 60
5185
4136
4136
$2481 60
30
2503 603
4" PVC PIPE SEWER SDR 26
LIN FT
S7 15
3500
3472
0
$24 824 80
31
2503 603
8" PVC PIPE SEWER SDR 26
LIN FT
$15 15
30
32
0
$48480
32
2503 603
15' PVC PIPE SEWER SDR 26
LIN FT
$23 10
886
889
0
$20 535 90
33 12503
603
6' PVC PIPE SEWER SOR 35
LIN FT
$10 691
2975
2921
0
$31 22549
34
2503 603115
PVC PIPE SEWER SDR 35
LIN FT
$18 45
294
294
0
$5 424 30
35
2506 516
CASTING ASSEMBLY
EACH
$400 00
20
20
0
S8 000 00
36
2,506 522
ADJUST FRAME RING CASTING
EACH
$40000
1
0
0
$0 00
37
2506 603
CONSTRUCT 8' OUTSIDE DROP
LIN FT
$225 00
23 5
23 5
0
$5 287 50
38
2506 603
CONST 48" DIA SAN SEWER MANHOLE
LIN FT
$115 52
289
288 81
0
$33 363 33
Totals For Section SCHEDULE B SANITARY SEWER
$136,988 02
SCHEDULE C WATERMAIN
39 12504
502
HYDRANT JEACH
$1 599001
9
9
0
$1439100
40 12504
602
HYDRANT TYPE BLOW -OFF
EACH
$1,59900
1
1
0
$1,59900
41 12504
602
HYDRANT TYPE CLEAN -OUT
EACH
S1 599 00
1
1
0
$1 59900
42
2504 602
V CORPORATION STOP
EACH
$2040
73
73
0
$1 48920
43
2504 602
5' GATE VALVE AND BOX
EACH
$452 10
11
11
0
$4 973 10
44
2504 602
8" GATE VALVE AND BOX
EACH
$346 00
8
8
0
$2 768 00
45
2504 602
16" GATE VALVE AND BOX
EACH
$3,01400
3
3
0
$9,04200
46
2504 602
1 "CURB STOP 8 BOX
EACH
$59 05
73
,31
0
$4,31065
2of5
01458 -00 Pay Vouchers 8
Monday, December 13, 2004
Item
No
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
47
2504 602
CONNECT TO EXISTING WATERMAIN (8
EACH
$62500
11
1
0
$62500
48
2504 602
CONNECT TO EXISTING WATERMAIN (16
EACH
$50000
1
1 1
0
$50000
49
2504 603
1" TYPE K COPPER PIPE
LIN FT
$6 84
32001
3200
0
$21,888 00
50
2504 603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$13 92
108
132 5
0
$1 84440
51
2504 603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
$14 28
3439
3542
0
$50,579 76
52
2504 603
16' WATER MAIN DUCT IRON CL 50
LIN FT
$24 75
1021
1049
0
$25,962 75
53
2504 603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
$27 90
160
150
0
$4,18500
54
2504 603
VALVE BOX EXTENSION
LIN FT
$8075
4
0
0
S000
55
2504 603
VALVE STEM EXTENSION
LIN FT
$9285
4
0
0
so 00
56
2504 603
HYDRANT EXTENSION
LIN FT
$332 40
2
0
0
$0 00
57
2504 602
ADJUST GATE VALVE AND BOX
EACH
5250 00
1
0
0
$000
58
2504 605
4" POLYSTYRENE INSULATION
SO YD
$15 87
20
0
0
$0 00
59
2504620
1 DUCTILE IRON FITTINGS
POUND
$200
7800
7588
0
$15,17600
Totals For Section SCHEDULE C WATERMAIN
$160,932 86
SCHEDULE D SITE STORM SEWER
60
2501 515
12' RC PIPE APRON
JEACH
1 $49969
2
2
0
$999 38
61
2501 515
15" RC PIPE APRON
EACH
$53071
5
5
0
$2,653 55
62
2501 515
18" RC PIPE APRON
EACH
S58864
1
1
0
$588 64
63
2501 515
21" RC PIPE APRON
EACH
$628 01
2
2
0
$1,256 02
64
2501 515
24' RC PIPE APRON
EACH
$734 53
2
2
0
$1,469 06
65
2501 602
36" RC PIPE APRON W /PILING
EACH
S3281 97
1
1
0
$3281 97
66
2501 602
TRASH GUARD FOR 12" PIPE APRON
EACH
$430 51
2
2
0
$861 02
67
2501 602
TRASH GUARD FOR 15" PIPE APRON
EACH
$515 91
5
5
0
$2 579 55
fib
12501602
TRASH GUARD FOR 18" PIPE APRON
EACH
$581 48
1
1
0
$581 48
69
2501 602
TRASH GUARD FOR 21" PIPE APRON
EACH
1 $90473
21
2
0
$1,80946
70
2501 602
TRASH GUARD FOR 24" PIPE APRON
EACH
1$1,171 13
2
2
0
$2 34226
71
2501 602
TRASH GUARD FOR 36" PIPE APRON
EACH
1$1,86768
1
1
0
$1,86768
72
2501602
SKIMMER
EACH
$3,25000
2
2
0
$650000
73
2502 541
PERF PVC PIPE DRAIN
LIN FT
$1260
496
414
0
$5,21640
74
2503 51118"
DUCTILE IRON PIPE SEWER CL 52
LIN FT
$24 31
36
36
0
$875 16
75
2503 541112
RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$18 11
32
48
0
$86928
76
2503 541116'
RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$19 37
2104
2083
0
$40 34771
77
2503 541
18" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
S21 04
271
277
0
$5,828 08
78
2503 541
18" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$21 04
150
150
0
$3,156 00
79
2503 541
21" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$24 17
676
666
0
$16,09722
80
2503 541
24" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT 1
$25 67
294
306
0
$7 855 02
81
2503 541
27' RC PIPE SEWER DESIGN 3006 CLASS IV
LIN FT
$36 96
139
139
0
$5 13744
82
2503 541
30 RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$3575
352
280
0
$10 01000
83
2503 541
33" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
S4200
433
505
0
$21 21000
84
2503 541136"
RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$4798
72
70
0
$3,35860
85
2503 602
CONNECT TO EXISTING STORM SEWER
EACH
$650 00
1
1
0
$65000
86
2503 602
CONNECT TO EXISTING STRUCTURE
EACH
$750 001
11
ill
0
$75000
87
2506 501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$12162
109 351
103 281
0
$12,56091
88
2506 501 1CONSTRUCT
DRAINAGE STRUCTURE DESIGN 604020
LIN FT 1
$179 03
85 311
85 631
0
$15,330 34
89
2506 501 ICONSTRUCT
DRAINAGE STRUCTURE DESIGN 78 -4020
LIN FT
$320 86
1168
11 18
0
$3 58721
90
2506 502
CONSTRUCT DRAINAGE STRUCTURE DESIGN G
EACH
$1,360 00
3
3
0
S4 080 00
91 12506
502 ICONSTRUCT
DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
S1 109 16
16
17
0
$18 855 72
92
2506 502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 2
EACH
54 545 90
1
1
0
$4 5 93
2506 502
CONS�RUCT DRAINAGE STRUCTURE DESIGN SPECIAL 3
EACH
$7 027 97
1
1
0
$7
94 2506 502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 4
EACH
$4,545 90
1
1
0
$4
3 of 5
0 145 8-00 Pay Vouchers 8
Monday, December 13, 2004
Item
No
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to
Date
95
2506 516
CASTING ASSEMBLY
EACH
$400 00
25
25
0
$10,000 00
96
2511 501
RANDOM RIPRAP CLASS III
Cu YO
S46 80
102
82
0
.3,537601
97
2511 501
RANDOM RIPRAP CLASS IV
CU YD
$46 80
88 1
76 5
0
$3 580 20
98
2511 515
GEOTEXTILE FILTER TYPE IV
SO YD
S1 40
370
118 84
0
$166 38
Totals For Section SCHEDULE D SITE STORM SEINER
1 $236 269 11
SCHEDULE E TRUNK STORM SEWER
99
2503 541
30" RC PIPE SEWER DESIGN 3006 CLASS 4000 #D
LIN FT
$108 34
520
522
0
$56 553 48
100
2503 541
30" RC PIPE SEWER DESIGN 3006 CLASS 5000 #0
LIN FT
$108 00
657
660
0
S71 280 00
101
2503 602
CONNECT 70 EXISTING STORM SEWER
EACH
$75000
1
1
0
$750 00
102
2506 501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$80 78
62 68
62 68
0
$5 063 29
103
2506 501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
$154 50
50 1
50 1
0
$7 74045
104
2506 516
CASTING ASSEMBLY
EACH
$500 00
3
31
0
$1 50000
Totals For Section SCHEDULE E TRUNK STORM SEWER
$142 887 22
Change Order 1
105 191176 1 ADDITIONAL EROSION CONTROL AND GRADING WORK LUMP SUM 1 $12 215 37 1 1 1
$12 215 37
Totals For Cdange Order 1
$12,215 37
Project Totals
$1,029 624 53
4of5
01458 -00 Pay Vouchers 8
Project Payment Status
Owner City of Rosemount
Client Project No 352
Client Contract No
Project No 01458 -00
Contractor Three Rivers Construction
Contract Chanoes
Monday, December 13, 2004
No
Type
Date
Description
Amount
C01
Change Order
11/30/2004
JModification to Contract Quantities
$12,21537
Change Order Totals
$12,21537
Payment Summary
No
From
Date
To Date
Payment
Total
Payment
Retamage
Per Payment
Total
Retainage
Completed
1
3/26/2003
4/3012003
$515,76297
$515,76297
$27,14542
$27,14542
$542.90839
2
5/1/2003
5/31/2003
$135,42631
$651,18928
$7,12770
$34,273 12
$685,46240
3
6/1/2003
6/30/2003
$227,82034
$879,00962
$11,99054
$46,26366
$925,27328
4
7/1/2003
7/31/2003
$11,625 19
$890,63481
$611 86
$46,87552
$937,51033
5
8/1/2003
8/31/2003
S1,29527
$891,930.08
$68 17
$46,94369
$938,87377
6
9/112003
12/31/2003
$5,01268
$896,94276
$263 82
$47,20751
$944,15027
7
1/1/2004
10/31/2004
$67,225 12
$964.16788
$3,538 17
$50,74568
$1,014,913 56
8
FINAL
11/1/2004
11/30/2004
$65,45665
$1,029,624 53
($50,745 68)
$0 00
$1,029,624 53
Payment Totals
$1,029,624 53
$000
$1,029,624 53
Proj ect Su
Material On Hand:
Total Payment to Date
Total Retamage
Total Amount Earned:
$0.00
$1,029,624.53
$0.00
$1,029,624.53
Original Contract: $1,035,949.62
Contract Changes: $12,21537
Revised Contract: $1,048,164.99
5 of 5