HomeMy WebLinkAbout6.j. Final Payment for Well #12, City Project 354CITY OF ROSEMOUNT
EXECUTIVE SUMMARY FOR ACTION
CITY COUNCIL MEETING DATE December 21, 2004
AGENDA ITEM: Final Payment for Well #12, CP #354
AGENDA SECTION:
Consent
PREPARED BY: Anthony A Aderhold, P E, Protect Engineer
A'
ATTACHMENTS: Payment Voucher #8 and Final
APPROVED BY.
RECOMMENDED ACTION: Motion to approve Payment #8 and Final to E H Renner
and Sons, Inc for Well #12, City Protect #354 and accept for perpetual maintenance
ACTION:
BACKGROUND:
This item is on the agenda to request Payment #8 and final to E. H Renner and Sons,
Inc in the amount of $35,873 49 for Well #12, City Protect #354 The revised contract
amount was $221,606 00 and the final total cost for the protect was $208,839 86 A
revised contract amount was the result of one change order The change order
consisted of the capping of the test well hole previously contracted adjacent to the
proposed new well
The protect was funded entirely by the Water Core Fund
SUMMARY:
Staff recommends that Council approve Payment #8 and final for the protect and
accept for perpetual maintenance subject to the following conditions
Satisfactory showing that the contractor has complied with the provisions of
Minnesota Statutes 290.92 requiring withholding state income tax
Evidence in the form of an affidavit that all claims against the contractor by
reasons of the contract have been fully paid or satisfactorily secured
3 Consent of Surety to Final Payment Certification from the contractor's surety
W
W B
Asso,iales, Inc
November 22, 2004
Honorable Mayor and City Council
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Attn Cindy Domiden, City of Rosemount
Re. Construction Pay Voucher No 8 (Final)
Municipal Production Well No 12
City of Rosemount Project No 354
WSB Project No 1391 -02
Dear Mayor and Council Members
Please find enclosed the final Construction Pay Voucher No 8 for the above referenced
project in the amount of $35,873 49 Work completed during October included test
pumping, televising the well, sand analysts, chemical analysis, and demobilization E H
Renner and Sons, Inc has completed a quality municipal well of the desired production
under budget and E H Renner and Sons, Inc was the sole contractor and has submitted
the IC -134 form signed by the Minnesota Department of Revenue, verifying that they have
completed provisions of Minnesota Statutes 290 92 requiring withholding state income tax.
We recommend final payment
Please make payment in this amount to E H Renner and Sons, Inc at your earliest
convenience
Sincerely,
WSB Associates, Inc.
7 0&
Nancy Zeigler
Project Manager
4150 Olson
Memorial Highway Enclosures
Suite 300
cc Cindy Doiniden, City of Rosemount
Minneapolis_
E H Renner and Sons, Inc
Minnesota
55422 tsh
7 63 541,4800
763 541 1700 FAX Minneapolis St Cloud Equal Opportunity Employer
F IWPWIM1391 -021. d fid 8r cry dx
k
W SB
h Auocwle9 lnc
Jwner City of Rosemount Date November 10 2004
or Penrod 10101!04 to 10MV34 Request No 8 and Rnal
'Ontractor E H Renner and Sons, Inc
PAY VOUCHER
MUNICIPAL PRODUCTION WELL NO 12
CITY OF ROSEMOUNT PROJECT NO 354
WSB PROJECT NO 1391 -02
SUMMARY
1 Original Contract Amount
2 ChangeOrder Addition
3 Change Order Deduction
4 Revised Contract Amount
5 Value Completed to Date
6 Material on Hand
7 Amount Earned
8 Less Retainage 0%
9 Subtotal
10 Less Amount Paid Previously
11 AMOUNT DUE THIS PAY VOUCHER NO
Recommended for Approval by
WSB Associates, Inc
Pr ft Manager/Engineer
Approved by Contractor
r E HH R'EENNNER AND SONS 14C.
8 and Final
220,116 00
1,49000
000
221,60600
208 839
86
000
208,839
86
000
208,839
86
172 966
37
35,87349
Approved by Owner
CITY OF ROSEMOUNT
Specified Contract Completion Date
August 9, 2004
Date
P'.1 W 3 F ii P 1231 OS W139102 Vou W 8A
Pay Voucher No 8 and Final
Municipal Production Well No 12
City of Rosemount Project No 354
WSB Project No 1391 -02
November 10, 2004
Item
No Item Description
Unit
Contract
Quantity
Unit
Price
Current
Quantity
Quantity
to Date
Amount
to Date
1 1 00 1 $1 49000 0001
1001
$1 400 DD
TOTAL CHANGE ORDER NO 1
$1,49000
1 MOBILIZATION /DEMOBILIZTION
LUMP SUM 1
$2200000 050
100
$2200000
2
DRILL B DRIVE 30' CASING
LIN FT 185
$22500 000
18058
$4063050
3
PLACE 24" CASING
LIN FT
397
$68001
000
40122
$27 282 96
4
DRILL d DPIVE 24" CASING
LIN FT
0
$15000
000
000
$0 W
5
DRILL 24 OPEN HOLE
LIN FT
80
S10000
000
8000
$8 000 00
6
PLACE 18' CASING
LIN FT
0
$55 00
000
0 D
$0 OC
7
NEAT CEMENT GROUT
CU YD
50
$31000
000
3724
$1154440
8
EXPLOSIVES
POUND
400
$1800
000 8500' $153000
9
SANDSTONE REMOVAL
CU YD
400
$5500
000 37000 $2405000
10
FIR DEVELOPMENT EQUIPMENT
LUMP SUM
1
$1000000
000,
1 001
$1000000
tt
DEVELC -MENT
HOUR
120
$150001
000
14300
$2145000
12
ITELEVISE WELL
SRW
1
$120000
100
100
5120000
13
F I R TEST PUMP EQUIPMENT
EACH
1
$5000001
033
100
$500000
14
TEST PUMP WELL
HR
80
$12000 9725
9725
$11670 D0
15
SAND ANALYSIS TEST
TEST
5
$7500 200
200
$50 00
16
CHEMICAL ANALYSIS TEST
LUMP SUM
1
$1 20000, 100
100
$1200 DO
17
F I R SILT FENCE
LIN FT 250
$5 DO
000
000
$o DO
18
SOUND BARRIER
SO FT 480
$900
000
000
$000
19
DRILL 30' OPEN HOLE
LIN T
210
$100 00
0 00
217 42
$21 742 00
20
DRILL 18' OPEN HOLE
LUMP SUM
0
$7500
000
000
$000
21 GAMMA LOG WELL
LOG
1
$110000
000
001 $000
TOTAL $207,34986
CHANGE ORDER NO 1
1 SEAL EXISTING TEST BORINGS
LUMP SUM
1 1 00 1 $1 49000 0001
1001
$1 400 DD
TOTAL CHANGE ORDER NO 1
$1,49000
GRAND TOTAL $208,83986
Page 2 of F IWMNI1391AZExseR139142 VouNer No 8 xis
PROJECT PAYMENT STATUS
OWNER CITY OF ROSEMOUNT
CITY OF ROSEMOUNT PROJECT NO 354
WSB PROJECT NO 1391 -02
CONTRACTOR E H RENNER AND SONS INC
CHANGE ORDERS
No Date
Desermhnn
Amount
t
4/2612004
SEAL EXISTING TEST BORING
$1 49000
2
6/30/2004
TIME EXTENSION
$01 00
Total Change Orders
$1 490 00
PAYMENTSUMMARY
No From To Payment Retain... Comnleted
1
03/12/04
03/31/04
$24 417 66
$1 285 14
$25 70280
2
04/01/04
04/30104
$20 03125
$2 339 52
$44 450 91
3
04130104
05130/04
$18 146 96
$3294 63
$53.120 50
4
06101104
06/30/04
$7 500 00
$3 69463
$61 120 50
5
07101104
07/31/04
$6 459 99
$4 034 63
$67 920 5D
5
08/01/04
08/31104
$38 526 36
$6062 33
$121 24656
7
09/01104
09/30/04
$57 782 15
$9 103 49
$182
8 and Final
10/01/04
10/31/04
$35 87349
$0 00
$208,839 86
Material on Hand
$000
Total Pa ment to Date
$172 966 37
Original Contract
$220 116 00
Retain. a Pa No 8
$0 DO
Chan a Orders
S1 49000
Total Amounl Earned
$172966 37
1 Revised Contract
$221 60600
$115 18422