HomeMy WebLinkAbout6.p. Payment #5 & Final - 2004 SCADA System, City Project #377AGENDA ITEM: Payment #5 Final 2004 SCADA System, City Project #377 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Enginee i I� AGE ATTACHMENTS: Final Pay Voucher; Letter of Recommendation APPROVED BY: RECOMMENDED ACTION: Motion to Approve Payment #5 and Final for the 2 4 SCADA System, City Project #377, to US Filter Control Systems and Accepting it for Perpetual Maintenance. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: April 18, 2006 EXECUTIVE SUMMARY BACKGROUND: The supennsory control and data acquisition (SCADA) system to control the City's water system and monitors the sanitary and storm sewer hft stations is complete Attached for Council consideration is a letter of recommendation from Kaedmg and Associates, Inc to make final payment to U.S. Filter m the amount of $20,083.72 for a final total contract amount of $401,674 39. This project was funded by the City's sewer, water and storm utility funds. SUMMARY: Staff recommends that Council approve Payment #5 and final for the project and accept for perpetual maintenance subject to the following conditions. 1. Satisfactory showing that the contractor has comphed with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured 3. Consent of Surety to Final Payment Certification from the contractor's surety. G ENGPROJ 377 FinalPaymentCC4-18-06 doc KAEDING AND ASSOCIATES, INC. 7300 France Avenue South Suite 330 Minneapolis, Minnesota 55435 -4545 Phone: (952) 831 0317 April 7, 2006 CITY OF ROSEMOUNT Attn: Mr Andy Brotzler 2875 145' Street West Rosemount, MN 55068 -4997 RE: CITY OF ROSEMOUNT SCADA SYSTEM Dear Mr. Brotzler: E Mail. mfo @kaeding tom Fax (952) 831 2179 Enclosed please fihd the Final Application and Certificate for Payment, the Contractor's Affidavits of Release of Liens, Consent of Surety to Final Payment, and Lien Waiver from Electrical Installation and Maintenance Company. We believe this satisfies the final requirements for the project, and payment is recommended. This completes the obligations of USFilter Control Systems, Inc. except for potential warranty items and the fmal program CD which is expected within the next week or two. If you have questions, please contact me. ou y, ding DING AND ASSOCIATES, INC. PFK:mj Enclosure U m 0 a c O a R L c K E E m U 0 m cc W a O 0 t U a. u) N W W m O w 10 C_ y L 2 10 5 D: W r y U K m to Q T N 2 cram 0 Jr- U 3 J O a�- W W N C c m 0 o CO Z Z LO 2 2 0 1- 1- U UQ W W K t-O Z CC U O a CL to U LL 0) 0 M M U N 4) 0 N c [1) )O U m Z U Q W Q U of o m o a o a m o _c Y N 2 o R r E o N 5 m 2 o 1212 m 0 3 m 021 LL 0) C L N r c 0 E O 0 0 0 CD o n 0 M 0) r o n N N O C O O c] C..- o 0 W. 0 0 r O CO ol L O n 3 EL O )n w w w w S w w w U m c 0 C U O M c r O o t' W m w m F fA C j N Q O (f v 0 W o p r 0 R2-0 CO O WU' o O L F 2 c u Q y a 0 0 O W d O Q W W m Q W ja r• J O O c 2 L0 1-0 C m c0 E maw N 5 a W 0 C N o W- 0 0 W n J m c v o F- o_Od fp CI- N U 0 W fa O c O C C m W 7 W p Z y 0) 0 .0 '4 U D J O O O w N 1 W J 0 C} E J E UUO yF 2 CIA 0) 0_ >dah 0 O m a N 0: O c Z 0 e N J a W W 2 u c 0 2 F F- c 1- co Q-' J II 201 UM o 0 W aD Q a m p m a F F- J a O co a, -c r N t") R v N w f- co a, F- 2 W 2 Q a 0 LL 2 0 F- Q U J a a a 0 0 Q U F 2 O 0 x 2 2 co co cc cc 0 W 0 z 2 U C 0 0 O 0..0 E to L y N c E O E y W 0) o 0 m 0 L G U aQ Eft O y C y C m a 0 L E o 3 s 0 0 O a 3 0 a U p y C U a m m y C y 5A--o T V 3 0�m `0 a d m a N r O C 3 m 3 0 3 o o o c a 0 o m U w L 3 E m m E y V OU L N v� N d a c O c u� m a E O E m C 0 o m a c E .o `0 L c O O a U m c 0 m c E m L m t0 m y U c c d m e m o 3 y rn E UO -o O C m 0 m c m o 3 E m L c CO m m 0 F .0 a r n 1 r p T 0 y V E as a) E fra c n O m U Fa. m 3 m N m a 0 c c a E CO 75 E -0 a E o 0 a) uU m U io o) Z 2 M 0 O N 09 O 0 4) a m O N _T L Q a m m a -C i m m p c 3 C C m m a Y F-' y O c W 75.1-152 S m W g a m y E U y m m o F CD L -o p L.0 Q w O 7 ti WI a m w o �Q E w o O) a 0 L m c m y U 0 a 0 L E w y 0 Y r m c 0 3 E, o t L .c U a U c m m `m `m C C 0 0 N c U m c m y N y c O Y O O 0 O m y m o Z E u m m y 'C o m Q c O c .c c `o m F. 0_ "g L_ 0 U U 3 N C _c 2 m 0 W c O F y N It C a) L O W m F c T m 3 O IL U u c F x W k. o 0 2 L 1- m U U O 0 U m m re L N C 0 <m1 -0.mO m 0 RETAINAGE OF G) 0% 00000000000000000000000000 00000000000000000000000000 00000000000000000000000000 �00 0 00 0 00 0 1000 loon I BALANCE TO FINISH 00000000000000000000000000 00000000000000000000000000 00000000000000000000000000 1000 00 0 00 0 1 00 0 1000 C9 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000000000000000 0000000000000000000 %004 %004 %00 I %00 4 COMPLETED AND STORED TO DATE 0 0 0 0 0 0000000000000000000000 00000000000000000000000000 up M 0 0 0 0 0 0 0 co co co co N O N N N c7 0 CD 0 0 0 0 0 (D r v V Q R 7 C 'C 0) 0) 0) 0) V(0 T m (D Q r t (0 (0 C) (c) NO (0 CD 0 CD (D N 0 t- (O r- N N r ai al al 0) ai 0) O) 0) 0) 0) a) 0) r o v' v: r 371,472 00 18,596 00 11,606 39 30,202 391 401,674.391 LL MATERIALS PRESENTLY STORED (NOT IN D Ioo•o 00 0 00 0 100 0 THIS PERIOD 00'0 3,596 00 606 39 6E'Z0Z 4,202.391 a WORK COM', FROM PREVIOUS APPLICATION 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 CD c7 0 0 0 0 0 0 0 c0 c0 N N 0 O) In N N Cl OD r- c v v Q v c v 0) 0) 0) 0) V CO V CO (D C N- R C') CO (0 C) co C) CO CO (D CO O N O I CD r Ln N LO 0 CV CD LO u n 0 0) O Di D) 0) 0) 0) 0) 0 6 0) r 0 v' V r in r r r r 1 371,472.001 15,000 00 11,000 00 100'000'9Z 397,472 001 U SCHEDULE OF VALUE 0 0 0 0 0 00000000000000000000 0000000000000000000 u 0) 0 0 0 0 0 0 0 (0(0(0(0 u) a) LC) N N 0) our-- V v'0 v v 0) 0) 0) 0) v 0 a OD (0 v' LO r-0000 n Cr CO C) cc) M C') Cc) M (D CO CO CO CO O f- CO r N Ln r CA ai QC Oi Qi Di Oi of Di Qi Di ai r O V v' r Ln r rr (OOZL6' L£ 18,596 00 11,606 39 I6£'Z0Z'0C 401,674.391 CO DESC. OF WORK a Ta LE o N O o as o y m m a c m a 0 O m m c v a a o `m 3 m a 9 y w m P E 3 co m c o 0 3 m E z s a E 3 N o U o m a `O b a u d 0 o 0 3 3 V r (0 V LO (0 f� OD a a a o 3 N m *at m .O C C C C C C C O C C a 0 Ln 0 0 0 1 m O O O O O O 0 O O E- CO u) u) N j m m m w m m m a (8 c 3@ 3 w°°°- E F 1- t .'C t t t o m U N _o) 0 -,(0 0 m c---r 0 o a 2 U J J J J J J J 0 r 5 CO m S U>> 5 2 CO U O m m a m Cn U 'Total Original Contract C/O #1 Misc. Changes C/O #2 SCADAIarm, Radio Tone, etc. Total Change Orders I TOTAL Q W U F 2 r co (0 7 Ln (0 r co 00 0 y- N (n V In CO n CO 0) O N C) .(1 (n N N N N N N 0 0 m a tD nwoo L Owa 7I- rn a v o a a I- a. re cc 0. 0 a N A E E O. IX Ica m 0 O CO I0 IL c It c cc m I0 0 0 CI u a 0 l0 m o t ic 0 A C 0 U O G z 'y a b y C E 0 E 7 2 A O 7 0 O .a a (2 b O 0 U S. 0 0) m