Loading...
HomeMy WebLinkAbout6.j. Receive Bids/Award Contract-2006 Pedestrian Facility Improvements, City project #400AGENDA ITEM: Receive Bids /Award Contract -2006 Pedestrian Facility Improvements, City Project #400 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer �y AGEN S' ATTACHMENTS: Maps APPROVED BY: 01 7 RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the 2006 Pedestrian Facility Improvements, City Project #400. x ROSEtiouNr City Council Meeting: May 2, 2006 CITY COUNCIL EXECUTIVE SUMMARY ISSUE: Receive bids and award contract for the 2006 Pedestrian Facility Improvements. BACKGROUND: On Friday, April 28, 2006, bids for the referenced project were received and read aloud publicly. The project includes replacement of existing bituminous trails with sidewalk, new bituminous trail construction, and new sidewalk construction on segments of Shannon Parkway, 153` Street West, 155` Street West, and Claret Avenue. Costs associated with the project will be funded with encumbered funds, 2006 Pedestrian Improvement Funds, and Park Dedication Funds Park and Recreation Department Staff will also be preparing and submitting applications for grant monies, with any monies received being used to reduce the necessary Park Dedication funding level Homeowners will not be assessed for these improvements SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council mcenng G \EIN GPROJ \400 \RecBid- AwardContcactCC5 -2 -06_400 doe /ENPORT 3 0 O 1 O 1 O 3 0 O e Q 0 3 0 J W DELL ?DOO WAY 1 37TH ST W M r s z 0 i TRL 213 CONNEMARA PARK 0 C 12 141ST ST CT 12A Q Q 0 z o f 133 CT W 15A SHANNON PARK ELEM U SCHOOL 9 s q D AL TOry C/y 1 DAHLIA CT 1371H ST W r 0- r �R 41 z WAY Cr SHANNON PARK 0 LEGEND C\R RPN RMACK C \R 300 COUCHTOWN PA 600 EXISTING BITUMINOUS PATH EXISTING CONCRETE WALK PROPOSED BITUMINOUS PATH PROPOSED CONCRETE SIDEWALK a, EXISTING BITUMINOUS PATH TO BE REPLACE WITH CONCRETE WALK 22 SEGMENT NUMBER PROPOSED 2006 IMPROVEMENTS SEGMENTS 1, 2 3 4, 5, 12A, 12B, 15A, AND 41 701 Xenia Avenue South, Suite 300 WSB Minneapolis, MN 55416 WSB www wsbeng cram Associates, Inc 763 541-4800 Fax 763 541 -1700 INFRASTRUCTURE ENGINEERING PLANNING CONSTRUCTION 2006 IMPROVEMENTS PEDESTRIAN FACILITIES IMPROVEMENT PLAN t MINNESOTA WSB Project No 1566 -00 Nov 15, 2005 FIGURE 1 M \01556- 001cac52006 TRAIL_8X1 IA 6wg, 12722/2005 10 50 08 AM _n�.W,l l 1ST ST W CT W z 2 D ST W T W Z 0 YCEE U1 PARK 156tH ST w OCU o 1 Q z 0 w U 0 cc U YSTA INNAMON 1 51ST ST W GRc- 0 w U 3 COLUMBIA 2 U 0 es z CASCADE PATH 15411l sr w I CLARET CIR ,r te` U 0 m J 153 Q SI ix. CLARE PARK 16011-1 ST E CORNELL TRL W 156TH ST W 600 LEGEND EXISTING BITUMINOUS PATH EXISTING CONCRETE WALK PROPOSED BITUMINOUS PATH PROPOSED CONCRETE SIDEWALK EXISTING BITUMINOUS PATH TO BE REPLACE WITH CONCRETE WALK 22 SEGMENT NUMBER PROPOSED 2006 IMPROVEMENTS SEGMENTS 1, 2 3 4, 5, 12A, 126, 15A, AND 41 -1 SR 701 Xenia WS Associates, Inc INFRASTRUCTURE ENGINEERING Avenue South, Suite 300 Minneapolis, MN 55416 www wsbeng com 161541 -0100 -Fax 763 541 1 PLANNING CONSTRUCTION 2006 IMPROVEMENTS PEDESTRIAN FACILITIES IMPROVEMENT PLAN SROSEMOUNT WSB Protect No 1566 -00 Nov 15, 2005 FIGURE 2 M 101556- 001cad12006_TRAIL_ 8X116 dwg, 12/22/2005 10 50 54 AM