HomeMy WebLinkAbout6.j. Receive Bids/Award Contract-2006 Pedestrian Facility Improvements, City project #400AGENDA ITEM: Receive Bids /Award Contract -2006
Pedestrian Facility Improvements, City
Project #400
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer
�y
AGEN
S'
ATTACHMENTS: Maps
APPROVED BY:
01
7
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding
the Contract for the 2006 Pedestrian Facility Improvements, City Project #400.
x ROSEtiouNr
City Council Meeting: May 2, 2006
CITY COUNCIL
EXECUTIVE SUMMARY
ISSUE:
Receive bids and award contract for the 2006 Pedestrian Facility Improvements.
BACKGROUND:
On Friday, April 28, 2006, bids for the referenced project were received and read aloud publicly. The
project includes replacement of existing bituminous trails with sidewalk, new bituminous trail construction,
and new sidewalk construction on segments of Shannon Parkway, 153` Street West, 155` Street West, and
Claret Avenue.
Costs associated with the project will be funded with encumbered funds, 2006 Pedestrian Improvement
Funds, and Park Dedication Funds Park and Recreation Department Staff will also be preparing and
submitting applications for grant monies, with any monies received being used to reduce the necessary
Park Dedication funding level Homeowners will not be assessed for these improvements
SUMMARY:
The tabulation of bidders, resolution and letter of recommendation to award will be provided at the
Council mcenng
G \EIN GPROJ \400 \RecBid- AwardContcactCC5 -2 -06_400 doe
/ENPORT
3
0
O
1 O 1
O 3 0
O
e Q 0 3 0
J
W
DELL ?DOO WAY
1 37TH ST W
M
r
s z
0
i
TRL 213
CONNEMARA
PARK
0
C
12
141ST ST CT
12A
Q
Q
0
z
o f
133 CT W
15A SHANNON
PARK
ELEM
U SCHOOL
9 s
q
D AL TOry
C/y
1
DAHLIA CT
1371H ST W
r
0-
r �R
41
z
WAY
Cr
SHANNON
PARK
0
LEGEND
C\R
RPN
RMACK C \R
300
COUCHTOWN PA
600
EXISTING BITUMINOUS PATH
EXISTING CONCRETE WALK
PROPOSED BITUMINOUS PATH
PROPOSED CONCRETE SIDEWALK
a, EXISTING BITUMINOUS PATH TO BE
REPLACE WITH CONCRETE WALK
22 SEGMENT NUMBER
PROPOSED 2006 IMPROVEMENTS
SEGMENTS 1, 2 3 4, 5,
12A, 12B, 15A, AND 41
701 Xenia Avenue South, Suite 300
WSB Minneapolis, MN 55416
WSB www wsbeng cram
Associates, Inc
763 541-4800 Fax 763 541 -1700
INFRASTRUCTURE ENGINEERING PLANNING CONSTRUCTION
2006 IMPROVEMENTS
PEDESTRIAN FACILITIES
IMPROVEMENT PLAN
t
MINNESOTA
WSB Project No 1566 -00
Nov 15, 2005
FIGURE
1
M \01556- 001cac52006 TRAIL_8X1 IA 6wg, 12722/2005 10 50 08 AM
_n�.W,l l
1ST ST W
CT W
z
2
D ST W
T W
Z
0
YCEE U1
PARK
156tH ST w
OCU o 1
Q
z
0
w
U
0
cc
U
YSTA
INNAMON
1 51ST ST W
GRc-
0
w
U
3
COLUMBIA
2
U
0
es
z
CASCADE PATH
15411l sr w
I
CLARET CIR ,r
te`
U
0
m
J
153 Q SI ix.
CLARE
PARK
16011-1 ST E
CORNELL TRL W
156TH ST W
600
LEGEND
EXISTING BITUMINOUS PATH
EXISTING CONCRETE WALK
PROPOSED BITUMINOUS PATH
PROPOSED CONCRETE SIDEWALK
EXISTING BITUMINOUS PATH TO BE
REPLACE WITH CONCRETE WALK
22 SEGMENT NUMBER
PROPOSED 2006 IMPROVEMENTS
SEGMENTS 1, 2 3 4, 5,
12A, 126, 15A, AND 41
-1
SR 701 Xenia
WS Associates, Inc
INFRASTRUCTURE ENGINEERING
Avenue South, Suite 300
Minneapolis, MN 55416
www wsbeng com
161541 -0100 -Fax 763 541 1
PLANNING CONSTRUCTION
2006 IMPROVEMENTS
PEDESTRIAN FACILITIES
IMPROVEMENT PLAN
SROSEMOUNT
WSB Protect No 1566 -00
Nov 15, 2005
FIGURE
2
M 101556- 001cad12006_TRAIL_ 8X116 dwg, 12/22/2005 10 50 54 AM