Loading...
HomeMy WebLinkAbout6.f. Receive Bids/Awards Comtract - Evermoor Crosscroft 3rd Addition Streets & Utility Improvements, City Project #403AGENDA ITEM: Receive Bids /Award Contract Evermoor Crosscroft 3 Streets and Utility Improvements, City Project #403 AGENDA SECTION: Consent BY: Andrew J. Brotzler, P.E., City Enginee fly AGE •?1's t 6 F PREPARED ATTACHMENTS: Maps APPROVED BY: io'v RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Evermoor Crosscroft 3 Streets and Utility Improvements, City Project #403. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: May 16, 2006 EXECUTIVE SUMMARY ISSUE: Receive bids and award contract for the Evermoor Crosscroft 3` Streets and Utility Improvements. BACKGROUND: On Friday, May 12, 2006, bids for the referenced project were received and read aloud pubhcly. The project Includes the construction of new private streets and sidewalks, sanitary sewer, watermain, and storm sewer for the Evermoor Crosscroft 3` Addition The Evermoor Crosscroft 3` Addition is comprised of 47 single family residential units, and is a continuation of the Evermoor Crosscroft neighborhood, located along the north side of Connemara Trail and west of Evermoor Parkway. All costs associated with the project will be funded by the developer, D. R. Horton. SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting G \ENGPROJ\ 403 \RecB,d -AwardContractCC5 -16-06 doc ,W ADOPTED this 16 day of May, 2006 ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2006 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE EVERMOOR'S CROSSCROFT 3 ADDITON STREET AND UTILITY IMPROVEMENTS CITY PROJECT #403 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Evermoor's Crosscroft 3r Addition Street and Utility Improvements are hereby received and tabulated. 2. The bid of Ryan Contracting Co., in the amount of $777,682.19 for the construction of said improvements are m accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed. William H Droste, Mayor Motion by: Seconded by: Voted m favor: Voted against 0 E- s WSB Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Associates, Inc Suite 300 Minneapolis, MN 55416 May 12, 2006 Tel 763 541 -4800 Fax 763-541-1700 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Evermoor's Crosscroft 3 Addition Street and Utility Construction City of Rosemount Project No. 403 WSB Project No. 1556 -71 Dear Mayor and Council Members: Bids were received for the above referenced project on Friday, May 12, 2006, and were opened and read aloud Six bids were received The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $877,036.60 Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Co., Shakopee, Minnesota, in the amount of $777,682.19. We recommend that the City Council consider these bids and award a contract to Ryan Contracting Co., based on the results of the bids received. Sincerely, WSB Associates, Inc. Morgan Project Manager Enclosure cc: Ryan Contracting Co. Andy Brotzler, City of Rosemount Cindy Dorniden, City of Rosemount srb K.01556 ?id nuv`Gnnrunron ♦dmmV.1R REC M1w« -051206dx Minneapolis 1 St Cloud Equal Opportunity Employer PROJECT: Evermoor's Crosscroft 3rd Addition Street and Utility Construction City of Rosemount Project No. 403 LOCATION: Rosemount, MN WSB PROJECT NO.: 1556 -71 Bids Opened: Friday, May 12, 2006 at 10:00 a.m. Contractor BID TABULATIONS MMARY Bid Security Add. No. 1 Add. No. 2 Total Bid (5 Rec'd. Rec'd. (Schedules A -E) 1 Ryan Contracting Co. X X X $777,682.19 2 Dirt-Pro Equipment, Inc. X X X $878,172 85 3 Three Rivers Construction X X X $888,755 50 4 Manger Construction, Inc. X X X $909,595 00 5 Burschville Construction, Inc. X X X $925,481 10 6 Northdale Construction Co Inc. X X X $1,023,049 24 Engineer's Opinion of Cost $877,036.60 I hereby certify that this is a true and correct tabulation of the bids as received on May 12, 2006 Denotes corrected figure Morgan A. Da y, '.E., oje. Manager K101556- 711AdmmLConsirucbon Adminfl556 -71 Bid Tab Summary xis Crosscroft 3rd Addition 0 ROSEMOLINT FM PICISC yIMapsDspvlmeMel Ma eempLA IFeet 0 1,150 3300 nor Crcssva113rd Location dad Apr 26 2006 4 54 35 PM, CM of Rosemount MINNESOTA Crosscroft 3rd Addition 0 9 ROSEMOUNT' File TGISCly`MapsDepartmentel Maps Englneering'Anoy'EvemeotC !Feet 0 175 350 MINNESOTA