Loading...
HomeMy WebLinkAbout6.g. Receive Bids/Awards - JJT Business Park First 1st Addition Streets & Utility Improvements, City Project #402AGENDA ITEM: Receive Bids /Award Contract -JJT Business Park 1 Addition Streets and Utility Improvements, City Project #402 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer^ of .1 ATTACHMENTS: Maps APPROVED BY: RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the JJT Business Park 1 Addition Streets and Utility Improvements, City Project #402. ROSEMOUNT CITY COUNCIL City Council Meeting: May 16, 2006 EXECUTIVE SUMMARY ISSUE: Receive bids and award contract for the JJT Business Park 1" Addition Streets and Utility Improvements. BACKGROUND: On Friday, May 12, 2006, bids for the referenced project were received and read aloud publicly. The project includes the construction of new pubhc streets and sidewalks, sanitary sewer, watermain, and storm sewer for the JJT Business Park 1" Addition. The JJT Business Park development site is located south of CSAH 42 and east of Trunk Highway 3 adjacent to the Business Park Access to the site will be provided by an extension of Boulder Avenue and by a new cul -de -sac off Boulder Avenue. All costs associated with the project will be funded by the developer, Appro Development. SUMMARY: The tabulation of bidders, resolution and letter of recommendation to award will be provided at the Council meeting. G \ENGPROJ\ 402 \RecBid- AwardContraaCC5 -16-06 doe ADOPTED this 16 day of May, 2006. ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2006 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE JJT BUSINESS PARK 1 ADDITION STREET AND UTILITY IMPROVEMENTS CITY PROJECT #402 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the JJT Business Park 1" Addition Street and Utility Improvements are hereby received and tabulated. 2. The bid of Ryan Contracting Co., m the amount of $458,251.50 for the construction of said improvements are m accordance with the plans and specifications and advertisement for bids is the lowest responsible bid and shall be and hereby is accepted. 3. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of all successful bidder and the next two lowest bidders shall be retained until a contract has been executed William H Droste, Mayor Motion by: Seconded by: Voted in favor: Voted against: WSB Infrastructure 1 Engineering 1 Planning 1 Construction As.,oczates, Inc 8 0 A 701 Xenia Avenue South Suite 300 May 12, 2006 Minneapolis, MN 55416 Tel 763 -541 -4800 Fax 763 541 -1700 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: JJT Business Park 1 s` Addition Street and Utility Construction City of Rosemount Project No. 402 WSB Project No. 1556 -66 Dear Mayor and Council Members: Bids were received for the above referenced project on Friday, May 12, 2006, and were opened and read aloud. A total of four bids were received. The bids were checked for mathematical accuracy and tabulated. The Engineer's Estimate was $507,492.75. Please find enclosed the bid tabulation indicating the low bidder as Ryan Contracting Co., Shakopee, Minnesota, in the amount of $458,251.50. We recommend that the City Council consider these bids and award a contract to Ryan Contracting Co., based on the results of the bids received. Sincerely, WSB Associates, Inc. Morgan Project Manage Enclosure cc: Thomas J. Ryan, Ryan Contracting Co. tf Minneapolis 1 St Cloud Equal Opportunity Employer K101$$6- 66NCwriCwajn. ,bnAda,iLTR RECWW77 AumO$I:OSdx PROJECT: JJT Business Park 1st Addition Street and Utility Construction City of Rosemount Project No. 402 LOCATION: Rosemount, MN WSB PROJECT NO.: 1556 -66 Bids Opened: Friday, May 12, 2006 at 10:00 a.m. BID TABULATION Bid Security Add. No. 1 Contractor (5%) Rec'd. Grand Total Bid 1 Ryan Contracting Co X X $458,251 50 2 Dirt-Pro Equipment, Inc. X X $473,142 99 3 Three Rivers Construction X X 5476,321 73 4 Minger Construction, Inc X X 5478,672 35 5 Northdale Construction, Inc X X $525,661 30 Engineer's Opinion of Cost 5507,492.75 I hereby certify that this is a true and correct tabulation of the bids as received on May 12, 2006. Denotes corrected figure Morgan A Da -y, '�koiect Manager K.10155 6- 6 6lAdm,n Construction Admm11556 -66 Bad Tab Summary JJT Business Park e !C ROSEMOUNT Feet 0 1,150 2300 MINNESOTA F TIGISYCgyMaps DepagmeMat Maps Apr26 20066 ii71:1211l`d1lett& tneennglandyJJT Business Pep IA Location 22 PM City of Rose JJT Business (Park cn a 60TH ST W CSA STWCSAHy JJT Business Park 1 1 IFeet 0 175 350 aps\Ce 9 ROSEMOUNT 1el Map/ ngneennB1MtlyUJT Business Perk 151 Third Apr 26 2006 0 42 21 PM Cey of Rose MINNESOTA