Loading...
HomeMy WebLinkAbout6.l. Change Order #1-GlenRose of Rosemount Street and Utility Improvements, City Project #397AGENDA ITEM: Change Order #1 GlenRose of Rosemount Street and Utility Improvements, City Project #397 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer iVpAGENDA NO. 61 APPROVED BY: ATTACHMENTS: Change Order #1 RECOMMENDED ACTION: Motion to approve Change Order #1 for GlenRose f Rosemount Street and Utility Improvements, City Project #397. 4 ROSEMOLINT City Council Meeting: June 6, 2006 BACKGROUND: CITY COUNCIL EXECUTIVE SUMMARY Attached for Council consideration is Change Order No. 1 for the GlenRose of Rosemount Street and Utility Improvements, City Project #397. This change order addresses the followmg revisions to the project: 1. Relocation of watermain to accommodate retaining wall plans supplied by developer. 2. Community Center access modifications, signing striping modifications, to comply with conditions of Mn /DOT access permit for 140` Circle. 3. Storm sewer modifications to accommodate retaining wall plans from developer and per developer's comments. The above changes to the project result in a net decrease of $6,647.43 for a revised contract amount of $1,158,436.20. SUMMARY: Staff recommends Council approval of Change Order No. 1 for the GlenRose of Rosemount Street and Utility Improvements, City Project #397. G \ENGPROJ \397 \Change OrderlCC6 -6 -O6 doc WSB B Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Assoc ates, Inc Suite 300 Minneapolis, MN 55416 May 15, 2006 Tel 763 -541 -4800 Fax 763 541 -1700 Mr. Andy Brotzler, P.E. City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 GlenRose Addition Street and Utility Construction City of Rosemount Project No. 397 WSB Project No. 1556 -43 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 for the above referenced project. The change order reflects a net dec ase to the contract amount of $6.647.43 for a revised contract total of $1,158,436.20. Itie attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, WSB Associates, Inc. Morga Project Manager Enclosures cc Cindy Dorniden, City of Rosemount Richard Knutson, Inc. srb Mmneapohs 1 St Cloud Equal Opportunity Employer pw1555 4M M ConaOYOaYn AAxeaR CO r cn-a Lrvwu-051506 as GLENROSE ADDITION STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY PROJECT NO 397 CITY OF ROSEMOUNT, MN WSB PROJECT NO. 1556 -43 OWNER. CITY OF ROSEMOUNT 2875 145T11 STREET WEST ROSEMOUNT, MN 55068 CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE' PREVIOUS CHANGE ORDERS N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER NET DECREASE OF THIS CHANGE ORDER CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS RECOMMENDED BY APPROVED BY ,V WSB ASSOCIATES, INC ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION DAVID E H ON, P E PROJECT MANAGER CI-JANGE ORDER NO. 1 $1,165,083 63 $0 00 $1,165,083 63 ($6,647 43) $1,158,436 20 CONTRACTOR: YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION APPROVED BY RICHARD KNUTSON, INC. 12585 RHODE ISLAND AVENUE SOUTH SAVAGE, MN 55378 IT 15 UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME: NET CHANGE FROM PREVIOUS CHANGE ORDERS. CONTRACT TIME PRIOR TO THIS CHANGE ORDER NET INCREASE WITH CHANGE ORDER CONTRACT TIME WITH APPROVED CHANGE ORDERS CONTRACTOR SIGNATURE RICHARD KNUTSON, INC CONTRACTOR CITY ADMINISTRATOR 11 101556- 431Adm,n Conslrucuon Admm11556-43 Change Order I s1s00 -1 1/26/2005 7/31 /2006 NONE 7/31/2006 NONE 7/31/2006 GLENROSE ADDITION STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK CITY PROJECT NO. 397 CITY OF ROSEMOUNT, MN WS5 PROJECT NO. 1556 -43 ADDED ITEMS DELETED ITEMS TOTAL DELETED ITEMS CHANGE ORDER NO. 1 Item No. Mat No. Description CHANGE ORDER NO. 1 DETAIL TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT 1/26/2005 Qty Unit Price Extended Amount 118 2104 501 REMOVE CONCRETE CURB GUTTER 130 LIN FT $6 50 $845 00 119 2104 513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 30 LIN FT $6 00 $180 00 120 2104 523 SALVAGE SIGN PANEL TYPE C 1 EACH $25 00 $25 00 121 2211 501 AGGREGATE BASE CLASS 5 11 TON $8 80 $96 80 122 2350 501 TYPE LV 3 WEARING COURSE MIXTURE (C) 5 TON $46 35 $231 75 123 2350 502 TYPE LV 3 NON WEARING COURSE MIXTURE IC) 5 TON $44 35 $221 75 124 2531 501 CONCRETE CURB GUTTER DESIGN B618 80 LIN FT $9 75 $780 00 125 2564 536 INSTALL SIGN PANEL TYPE C 1 EACH $150 00 $150 00 126 2564 603 24" SOLID LINE WHITE -EPDXY 12 LIN FT $6 50 $78 00 127 2504 602 HYDRANT 1 EACH $1,90000 $1,90000 128 2504 602 6" GATE VALVE AND BOX 1 EACH $710 00 $710.00 129 2504 603 8" WATER MAIN -DUCT IRON CL 52 4 LIN FT $23 53 $94 12 130 2504 620 DUCTILE IRON FITTINGS 40 POUND $2 40 $96 00 131 2503 541 18" RC PIPE SEWER DESIGN 3006 CLASS III 6 LIN FT $32 50 $195 00 132 2506 501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 5.09 LIN FT $277 50 $1,412 48 133 2506 501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 -4020 4.51 LIN FT $322 50 $1,454 48 134 2531 604 7" CONCRETE VALLEY GUTTER 27 SO YD $60 00 $1,620 00 TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $10,090.37 Item No. Mat. No. Description Oty Unit Price Extended Amount 135 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V -193 LIN FT $27 00 ($5,211 00) 136 2503.541 21" RC PIPE SEWER DESIGN 3006 CLASS III -29 LIN FT $31 20 ($904 80) 137 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 -6.2 LIN FT $185 00 ($1,14700) 138 2506502 CONSTRUCT DRAINAGE STRUCTURE DESIGN -5 EACH $1,34000 ($6,700 00) SPECIAL 1 139 2506 516 CASTING ASSEMBLY -5 EACH $555 00 ($2,775 00) ($16,737.80) ($6,647.43) K:I01556.431ACminlConstruchon Admm11556 -43 Change Order 1 xlsC01 Detail