HomeMy WebLinkAbout6.l. Change Order #1-GlenRose of Rosemount Street and Utility Improvements, City Project #397AGENDA ITEM: Change Order #1 GlenRose of
Rosemount Street and Utility
Improvements, City Project #397
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer iVpAGENDA
NO. 61
APPROVED BY:
ATTACHMENTS: Change Order #1
RECOMMENDED ACTION: Motion to approve Change Order #1 for GlenRose f
Rosemount Street and Utility Improvements, City Project #397.
4 ROSEMOLINT
City Council Meeting: June 6, 2006
BACKGROUND:
CITY COUNCIL
EXECUTIVE SUMMARY
Attached for Council consideration is Change Order No. 1 for the GlenRose of Rosemount Street and
Utility Improvements, City Project #397. This change order addresses the followmg revisions to the
project:
1. Relocation of watermain to accommodate retaining wall plans supplied by developer.
2. Community Center access modifications, signing striping modifications, to comply with
conditions of Mn /DOT access permit for 140` Circle.
3. Storm sewer modifications to accommodate retaining wall plans from developer and per
developer's comments.
The above changes to the project result in a net decrease of $6,647.43 for a revised contract amount of
$1,158,436.20.
SUMMARY:
Staff recommends Council approval of Change Order No. 1 for the GlenRose of Rosemount Street and
Utility Improvements, City Project #397.
G \ENGPROJ \397 \Change OrderlCC6 -6 -O6 doc
WSB
B
Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Assoc ates, Inc
Suite 300
Minneapolis, MN 55416
May 15, 2006 Tel 763 -541 -4800
Fax 763 541 -1700
Mr. Andy Brotzler, P.E.
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 1
GlenRose Addition
Street and Utility Construction
City of Rosemount Project No. 397
WSB Project No. 1556 -43
Dear Mr. Brotzler:
Please find enclosed Change Order No. 1 for the above referenced project. The change order
reflects a net dec ase to the contract amount of $6.647.43 for a revised contract total of
$1,158,436.20. Itie attached meets with your approval, please sign and process.
If you have any questions or comments regarding the enclosed, please contact me at 651 -322-
2724. Thank you.
Sincerely,
WSB Associates, Inc.
Morga
Project Manager
Enclosures
cc Cindy Dorniden, City of Rosemount
Richard Knutson, Inc.
srb
Mmneapohs 1 St Cloud
Equal Opportunity Employer
pw1555 4M M ConaOYOaYn AAxeaR CO r cn-a Lrvwu-051506 as
GLENROSE ADDITION
STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK
CITY PROJECT NO 397
CITY OF ROSEMOUNT, MN
WSB PROJECT NO. 1556 -43
OWNER.
CITY OF ROSEMOUNT
2875 145T11 STREET WEST
ROSEMOUNT, MN 55068
CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE'
PREVIOUS CHANGE ORDERS N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER
NET DECREASE OF THIS CHANGE ORDER
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS
RECOMMENDED BY
APPROVED BY
,V
WSB ASSOCIATES, INC
ENGINEER
CITY ENGINEER
DATE OF COUNCIL ACTION
DAVID E H ON, P E PROJECT MANAGER
CI-JANGE ORDER NO. 1
$1,165,083 63
$0 00
$1,165,083 63
($6,647 43)
$1,158,436 20
CONTRACTOR:
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
APPROVED BY
RICHARD KNUTSON, INC.
12585 RHODE ISLAND AVENUE SOUTH
SAVAGE, MN 55378
IT 15 UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT TIME:
NET CHANGE FROM PREVIOUS CHANGE ORDERS.
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE WITH CHANGE ORDER
CONTRACT TIME WITH APPROVED CHANGE ORDERS
CONTRACTOR SIGNATURE
RICHARD KNUTSON, INC
CONTRACTOR
CITY ADMINISTRATOR
11 101556- 431Adm,n Conslrucuon Admm11556-43 Change Order I s1s00 -1
1/26/2005
7/31 /2006
NONE
7/31/2006
NONE
7/31/2006
GLENROSE ADDITION
STREET AND UTILITY CONSTRUCTION AND APPURTENANT WORK
CITY PROJECT NO. 397
CITY OF ROSEMOUNT, MN
WS5 PROJECT NO. 1556 -43
ADDED ITEMS
DELETED ITEMS
TOTAL DELETED ITEMS CHANGE ORDER NO. 1
Item
No. Mat No. Description
CHANGE ORDER NO. 1 DETAIL
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT
1/26/2005
Qty Unit Price Extended Amount
118 2104 501 REMOVE CONCRETE CURB GUTTER 130 LIN FT $6 50 $845 00
119 2104 513 SAWING BITUMINOUS PAVEMENT (FULL DEPTH) 30 LIN FT $6 00 $180 00
120 2104 523 SALVAGE SIGN PANEL TYPE C 1 EACH $25 00 $25 00
121 2211 501 AGGREGATE BASE CLASS 5 11 TON $8 80 $96 80
122 2350 501 TYPE LV 3 WEARING COURSE MIXTURE (C) 5 TON $46 35 $231 75
123 2350 502 TYPE LV 3 NON WEARING COURSE MIXTURE IC) 5 TON $44 35 $221 75
124 2531 501 CONCRETE CURB GUTTER DESIGN B618 80 LIN FT $9 75 $780 00
125 2564 536 INSTALL SIGN PANEL TYPE C 1 EACH $150 00 $150 00
126 2564 603 24" SOLID LINE WHITE -EPDXY 12 LIN FT $6 50 $78 00
127 2504 602 HYDRANT 1 EACH $1,90000 $1,90000
128 2504 602 6" GATE VALVE AND BOX 1 EACH $710 00 $710.00
129 2504 603 8" WATER MAIN -DUCT IRON CL 52 4 LIN FT $23 53 $94 12
130 2504 620 DUCTILE IRON FITTINGS 40 POUND $2 40 $96 00
131 2503 541 18" RC PIPE SEWER DESIGN 3006 CLASS III 6 LIN FT $32 50 $195 00
132 2506 501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 60-4020 5.09 LIN FT $277 50 $1,412 48
133 2506 501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 66 -4020 4.51 LIN FT $322 50 $1,454 48
134 2531 604 7" CONCRETE VALLEY GUTTER 27 SO YD $60 00 $1,620 00
TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $10,090.37
Item
No. Mat. No. Description Oty Unit Price Extended Amount
135 2503.541 15" RC PIPE SEWER DESIGN 3006 CLASS V -193 LIN FT $27 00 ($5,211 00)
136 2503.541 21" RC PIPE SEWER DESIGN 3006 CLASS III -29 LIN FT $31 20 ($904 80)
137 2506.501 CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020 -6.2 LIN FT $185 00 ($1,14700)
138 2506502 CONSTRUCT DRAINAGE STRUCTURE DESIGN -5 EACH $1,34000 ($6,700 00)
SPECIAL 1
139 2506 516 CASTING ASSEMBLY -5 EACH $555 00 ($2,775 00)
($16,737.80)
($6,647.43)