Loading...
HomeMy WebLinkAbout2.a. 42/52 Interchange Project UpdateAGENDA ITEM: 42/52 Interchange Project Update SECTION: i AGENDA a' PREPARED BY: Andrew J. Brotzler, P.E., City Enginee AGENDA NO. 2 A A. ATTACHMENTS: Memo's; Trunk Highway 52- Dakota County Partnership; Maps APPROVED BY: RECOMMENDED ACTION: Discussion Q 4 ROSEMOUNT City Council Work Session: June 14, 2006 BACKGROUND: See attached information. CITY COUNCIL EXECUTIVE SUMMARY G. \ENGPROJ \transportation plan \42- 52lnterchangeCW S6-14 W doc 4 ROSE MOUNT PUBLIC WORKS DEPARTMENT M E M O R A N D U M To: Honorable Mayor and City Council Members Jamie Verbrugge, City Administrator From: Andrew J. Brotzler, P.E., City Engineer Date: June 8, 2006 Re: Highway 52/42/55 Interchange Partnership Project Update BACKGROUND In May, 2002, the Hi wa 52 42 55 Iterchange and Hi•hwa 55 Re onal Corridor Stud was completed by Dakota County m partnership with Mn /DOT, City of Hastings, Nmmger Township, City of Coates and the City of Rosemount The primary objective of this study was the assessment of the need for transportation improvements to the Highway 52, 55 and 42 corridors to accommodate future development plans m the area. The major improvement need identified m the study with the most significant impact to the City of Rosemount is the proposed upgrade of the Highway 52/42 interchange. Since the completion of the Highway 52/42/55 Interch and High 55 Regional Corridor Study the following activities have occurred Led by Dakota County, a preliminary layout was prepared for the Highway 52/42 Interchange Project. This preliminary layout was the basis for the preparation of an environmental assessment (EA) for the project, and an Official Map for the future right -of -way needs for the project. Based on this preliminary layout, Mn /DOT has developed a prehmmary project cost estimate of $416 million not including right -of- way costs. In July 2003, a draft EA was prepared for the Highway 52/42/55 Interchange Partnership Project by Dakota County. The final EA was completed m February 2004 with a pubhc hearing held on March 18, 2004. In 2005, led by Mn /DOT an Official Map of the future right -of -way needs was prepared for the project By State Statute, a municipality has the authority to adopt an Official Map of future right -of -way needs. The effect of an Official Map is that the issuance of building permits and development approvals become subject to the right -of -way needs identified by the Official Map. 1 G: \ENGPROJ \transportation plan Mcmo- 52- 42- 55lnterchangeProiectC WS6- 1406.doc In the event that a property owner applies for a building permit or development project, the adoption of an Official Map provides a six month period for the municipality to initiate proceedings to acquire the proposed right-of-way. In the case of this project, the acquisition of tight -of -way would be facilitated by the City with funding from Dakota County, Mn /DOT or other sources One source of funding that can be accessed for right -of -way acquisition is the Right -of -Way Acquisition Loan Fund (RALF) program admitiistered through the Metropolitan Council. The adoption of an Official Map is a prerequisite for access to RALF funding. Should funding not be made available to acquire the right -of -way within the six month period, the Official Map for the property essentially becomes null and void and the building permit or development proposed would be subject only to the municipalities local ordinances. As part of the City's work to develop the (now adopted) land use plan for the east side, an assessment of the City transportation system was completed to support the proposed Highway 52/42 interchange improvements and Highway 42 and 55 corridor improvements. This proposed transportation system is reflected in the draft transportation plan As shown in the draft transportation plan, as improvements occur to the Highway 52/42/55 corndors, supporting City transportation improvements will be necessary. CURRENT ACTIVITIES Official Map Based on the Official Map that has been prepared by Mn /DOT, City Staff is working with Dakota County and Mn /DOT to develop a process for the adoption of the Official Map. By State Statute, the City is the local governmental unit with the authority to adopt the Official Map. Therefore, with Council concurrence, Staff will begin working to inmate the adoption of the Official Map by Council which will include a public hearing for all properties included m the Official Map. Final Design Dakota County is currently developing a Request for Proposals (RFP) to begin final design work on the Highway 52/42 Interchange project with federal funds that have been received by Dakota County in the amount of $250,000. In order to access these federal dollars, a local match of 20 percent is required. Through discussions with County Staff it is proposed that Dakota County will fund the 20 percent local match and the City will complete the storm water design at an estimated cost of $39,400. As additional funding for the project becomes available, design work will continue. The initiation and continuation of final design work will enable the project impacts 2 G \ENGPROJ \transportation plan Memo-52- 42- 55lnterchangeProjectCW56 -7406 doc SUMMARY for right -of -way, cost, etc. to be further refined and will place the project in a better posmon for future federal funding opportunities As final design work continues, it will be necessary for the City to initiate more detailed planning and design work for the City street system adjacent to and supporting the proposed interchange and corridor improvements. During the preparation of the 2007 budget, Staff will be evaluating the potential inclusion of CIP funds for future project costs that will be incurred. As outlined above, there has been a significant amount of work that has been completed to date for the Highway 52/42 Interchange project. Dakota County and Mn /DOT have spent approximately $400,000 and $125,000, respectively thus fax on preliminary engineering for the project. At this time, the primary unknown for the project is the source of funding for co.astruction. The Dakota County and City CIP's include funding beginning m the year 2008. The anticipated primary project funding source, Mn /DOT, does not have funding programmed for the project at this time. As plans for the All Cargo Facility are developed, additional opportumtres for project funding may become available. Staff will provide an overview of the Highway 52/42 Interchange project at the City Council Work Session on June 14. 3 G \ENGPROJ \transportation plan Memo-52- 42- 55lnterchangeProjectCWS6 -14-06 doc +'7 COUNTY V N Congressman Kline's Office TRUNK HIGHWAY 52 UPDATE May 31, 2006 1. Highway 52 Freeway Partnership Congressman Kline's attendance at the February 21 meeting much appreciated. Partnership will be visiting the Capitol in June. Top priority in CSAH 24 in Cannon Falls. This project will remove the last 2 Dakota County fully supports this project. in Zumbrota was the corridor is signals along 52. 2. CSAH 47 (Hampton) Overpass construction is currently underway ($4M), and is expected to open in late August. The Congressman may be invited to a ribbon- cutting upon opening. $1M appropriation funds spent $500k for R/W, $494k for construction. All has been spent Thank You! MnDOT is leading a study to develop frontage /backage roads in the area to eliminate access directly to 52. Dakota County, Hampton, Hampton Township, and property owners are all involved. MnDOT has approximately $900k in access management funds (2011) for frontage roads in Hampton, but costs are expected to approach $2M. Dakota County has discussed funding the construction of the ramps at the time access can be removed from 52 and the frontage roads are built. 2011? 3. CSAH 42 (Rosemount) Conceptual design and EA complete for interchange $250k appropriation will be used in the next year to continue preliminary design work. MnDOT is contributing $50k to study 42/55 intersection area. City considering taking on storm water design as their share of the study. We are working with State Aid to allow $3.25M authorization to be available for further design and r/w acquisition ($550k/yr for 2006 2010). MnDOT's current estimate for the project is $27 -30M for construction. Per MnDOT's cost participation policy, their share would be approximately 1/3 of the total costs We are coordinating with the City on any Air -Cargo Facility plans. 4. 111 Street to CSAH 56 (Inver Grove Heights) Continues conversion to freeway by removing access and building frontage roads. Dakota County is supportive of this project (no County funds involved). 0 a 0 0 X p x x n x x x b co H .H ez 0 C� R v 54 4' n n 0 ter.. L N S H x 0 S O CD R. a, F t f. O O E 5 w 5 a g F 3 r a OO n o `C `t 0" O 3 a n P J... 0. O 0 P. O O h 0 N P O N LA S p cn n xi O O n n CD r-j w 7 0 m 0 a; v a s r. N `c:: (nt r• 2 0 n G n 0 m r i. 0 a p. j P. n o L-.:: P p z C4 `a n cG ,j' 0 O ,0 an n D W Irt W n P 'OV' m N G v: a a H A. G P% n .ct g. N n n 0 n s P% (y. n O n 5 .7 r A S O O a- .'V -a O ern N lti En P G' C O O a n O O N 0 `c 0 a S O Q. cp O C O ."'4 is a- P-- W o OA v: C]O N w sC =l7 G n CD d a 7 C P ^3 R I-. 0 W rr;a w 0 r. a t s p n n 5 a h g °.Oa n 0 P Co a G y W N g y "0 S N O 0 G fn X rn- O 5 c m 1 m: a zo tN O ry Dr 0 0 O 0 0 0 E....5 0 7 2 m b y E O x "s con -a a E s x N �a ��ow oP o. m n a c v 5 e O t a as n -r o' w 0 o c a: 0 0 n G O R n a n N pi m x -a ac rti 0 0 0 M 0 Q O 0 mom' n m A- P> m P. g o n00 av U on j -I P� m� w 0 4m n 0 '6 Ct N n i a n ie 'a 5 P' n "J fJ 2 0 0 O '14 O O O 9 n-. 'P 0 7 N 4 S W y X O O v' i a r J B P+ M P. O 0 O Ca O qe 0 n 0 O.. 1 W W O 0) 7 a. o 7 0 J I' 0 0 0 0-0 n A ƒ CD CD ƒ P. 0 S q o f 2/� -0 ƒ 7 o 0 0_ 0 CL, 0 g I t a 0 0 0 a CI- rr. eIN CID N fa- t ml n O CD 0 j R a q 0 q q CZ) C o 0 2 y Z E ƒ f z g 0 0-I n 9 o 01 0 q 7 5 0 0 E 0 6 AD j CD o c E P 0 0 0 0 g ƒ e G 0 2 k j E 0 k G g 0 CA 0 3 CD z 0 CD 0 k` trio 'a z 3 0 t 8 0 a S 0 0 0 J fig O 7 0 0 0 y F N ;P t CD VI n /j $P 3 !rI C RIGHT -OF -WAY INFORMATION 1 (Z) S91ON 1 (Z1l 11 (Z) W N (Z) 133HS DOCUMENT 2210537 1819307 440755 1907271 859928 2094118 1425848 1631708 1631708 750900 934594 804443 663897 886472 504143 629086 380268 595920 1005781 1684300 905272 0905273 1684366 1842920 PROPERTY ID 34- 65900 -030-01 34- 02500 -012 -14 34 -02500 -010-25 34 -02500 -010-01 -02500 -012 -07 1 -02500 -011 -07 -02500 -010-06 -63950-010-01 34 -03000 -020 -55 34 -03000 -030 -55 34 -02500-011 -75 34 -02500 -012 -75 34 -02500 -010 -90 34 -03000-010 -30 Ra annn.mnna 34 -03000-010 -90 34 -03000 014-75 34 -03000 -012 -75 34 -03000- 013 -75 69 09 K 6I-0L0 34 -03100-018 -25 34 -03100 017 -25 34 -03100 -019 -25 34-63950-020 -01 34 -01900 -010 -57 34- 65900 -010-01 34 -02500 -011 -02 34- 63950 -010 -00 34- 65900 -020-01 ACQUISITION TYPE PARTIAL TOTAL PARTIAL PARTIAL PARTIAL PARTIAL TOTAL TOTAL TOTAL TOTAL aZQ �ai PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL PARTIAL N/A ACRES IMPACTED 029 121 LE 0 EE 0 9L 6 6 0 61 L Z4 0 PL 0 91. 0 111 l BE b 9 0 99 L L 9Z 0 90 6 Z LZ 0 66 0 9E 0 90 -601- viva 190 ADDRESS 3151 145TH ST E 3151 145TH ST E 3275 145TH ST E 3337 145TH ST E 3381 145TH ST E 3405 145TH ST E 3615 145TH ST E W Ili 15102 CLAYTON AVE E 14345 CONLEY AVE 3147 145TH ST E WEST SIDE OF TH52 EAST SIDE OF TH52 RICH VALLEY IND PARK OUTLOT A NAME DUANE MELVIN GOULSON ROBERTJ PHELPS t KOCH EXPLORATION PROPERTIES DENNIS D AND GAIL OZMENT KOCH EXPLORATION PROPERTIES CHICAGO AND NORTHWESTERN RR KENNETH AND BARBARA ANGERMAN NAPPER DANIEL G CLARKE SOLBERG LLP 1 'MARLIN AND JOANN RECHTZIGEL CAREY AND LESLIE RECHTZIGEL 'VICTOR AND BERNICE WENZEL RHAN FAMILY LIMITED PARTNERSHIP MARLIN AND JOANN RECHTZIGEL RAYMOND OSTERTAG FRANK A JR AND BETTE J KNOLL JOHN A REESE 9 KN0DT KNODT PERTIES LLC(WAYNE TRANSPORT) DAKOTA COUNTY KOCH EXPLORATION PROPERTIES LLC CMC PROPERTIES LLC ROLLAND J AND DIANE SACHS DESIGNATION A B OOWu. 02 Y J gZ020C WHO>X NQmUOwi I I II HH OD TH 52/CSAH 42 OFFICIAL MAP Z N O0 O V O 0 1 W 2 ¢1— N 0 S O 0 V 2 U N a N O 0 O z LLV) I— I— 00 Oa 0 O O (5133HS b 30 Z 133HS 33S) s a V 3NI1 H71tlW d X Z 0 2Q 0 <0 ¢W mLal W W 'I I a Z LL- 0 N O 0 c O dl N >2 o cn 0 IT V J 6T O N 00 w 2 LN O O d O K 2 X 3 N 6133HS b 30 1 13345 33S1 V 3N_1 HO_VW SHEET 2 OF 4 SHEETS 0 UM a Z LL- 0 N O 0 c O dl N >2 o cn 0 IT V J 6T O N 00 w 2 LN O O d O K 2 X 3 N 6133HS b 30 1 13345 33S1 V 3N_1 HO_VW SHEET 2 OF 4 SHEETS 2 Z l N O O v O a o >L .0 �S C V U Cr O o N O LL1 U 2 4N oO on- o o CL o a ]Rr 2 S 4n X Cn w SHEET 3 OF 9 SHEETS I t II 2 Z l N O O v O a o >L .0 �S C V U Cr O o N O LL1 U 2 4N oO on- o o CL o a ]Rr 2 S 4n X Cn w SHEET 3 OF 9 SHEETS