Loading...
HomeMy WebLinkAbout6.k. Change Order #1 Evermoor Glendalough 5th Addition, City Project #389AGENDA ITEM: Change Order #1 Evermoor Glendalough 5 Addition, City Project #389 a AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Enginee AGENDA NO, 6k ATTACHMENTS: Change Order #1 APPROVED BY: RECOMMENDED ACTION: Motion to approve Change Order #1 for Evermoor Glendalough 5 Addition Street and Utility Improvements, City Project #389. 4 ROSEMOUNT BACKGROUND: CITY COUNCIL City Council Meeting: August 2, 2006 EXECUTIVE SUMMARY Attached for Council consideration is Change Order No. 1 for the Evermoor Glendalough 5t Additon Street and Utility Improvements, City Project #389. This change order addresses the following revisions to the project. 1. Additional grading work necessary for utility installation not completed by developer's contractor. 2. Hydrant extension necessary as part of watermam overdepth. 3. Sanitary sewer lift station work and plumbing as a result of field design modifications. The above changes to the project result m a net increase of $8,935.02 for a revised contract amount of $840,890.28. SUMMARY: Staff recommends Council approval of Change Order No. 1 for the Evermoor Glendalough 5 Addition Street and Unhty Improvements, City Project #389. G \ENGPROJ \389 \Change Orde1CC8 -2 -06 doc WSB Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Aasoc pates, Inc Suite 300 Minneapolis, MN 55416 May 15, 2006 Tel 763 -541 -4800 Fax 763 -541 -1700 Mr. Andy Brotzler, P.E. City En gineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re. Change Order No. 1 Evermoor's Glendalough 5 Addition Street and Utility Construction City of Rosemount Project No. 389 WSB Project No. 1556 -21 Dear Mr. Brotzler: Pease find enclosed Change Order No. 1 for the above referenced project. The change order reflects a net increase to the contract amount of $8,935.02 for a revised contract total of $840,890 28. If the attached meets with your approval, please sign and process If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, WSB Associates, Inc. Moraari Project Manager Enclosures ce Cindy Domiden, City of Rosemount Richard Knutson, Inc. srb Minneapolis 1 St Cloud Equal Opportunity Employer E WPWIOu SW, 2ACTR co 1 Cry-a brach n0:1506.d EVERMOOR'S GLENDALOUGH 5TH ADDITION STREET AND UTILITY CONSTRUCTION CITY PROJECT NO 389 CITY OF ROSEMOUNT, MN WSB PROJECT NO 1556 -21 CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 CHANGE IN CONTRACT PRICE: RECOMMENDED BY APPROVED BY CITY ENGINEER DATE OF COUNCIL ACTION CHANGE ORDER NO. 1 OWNER. CONTRACTOR: RICHARD KNUTSON, INC 12585 RHODE ISLAND AVENUE SOUTH SAVAGE, MN 55378 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE 5831,955 26 ORIGINAL CONTRACT TIME 6/15/2006 PREVIOUS CHANGE ORDERS N/A SO 00 NET CHANGE FROM PREVIOUS CHANGE ORDERS. NONE CONTRACT PRICE PRIOR TO THIS CHANGE ORDER $831,955 26 CONTRACT TIME PRIOR TO THIS CHANGE ORDER 6/15/2006 NET INCREASE OF THIS CHANGE ORDER 58,935 02 NET INCREASE WITH CHANGE ORDER NONE CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS $840,890 28 CONTRACT TIME WITH APPROVED CHANGE ORDERS 6/15/2006 1st— CONTRA* OR SIGNATURE 4/18/2006 RICHARD KNUTSON, INC CONTRACTOR CITY ADMINISTRATOR F I WPW/MI55E411EXCELV555 -21 Change Order 1 xJsCO -1 EVERMOOR'S GLENDALOUGH 5TH ADDITION STREET AND UTILITY CONSTRUCTION CITY PROJECT NO. 389 CITY OF ROSEMOUNT, MN WSB PROJECT NO. 1556 -21 ADDED ITEMS TOTAL ADDED ITEMS CHANGE ORDER NO. 1 DELETED ITEMS Item No. Mat. No. Description CHANGE ORDER NO.,1 DETAIL 4/18/2006 Oty Unit Price Extended Amount 83 ADDITIONAL GRADING WORK 1 LUMP SUM $550 00 $550 00 84 12" HYDRANT EXTENSION 1 LUMP SUM $851 02 $851 02 85 LIFT STATION PLUMBING MODIFICATIONS 1 LUMP SUM $7,534 00 $7,534.00 $8,935.02 Item No Mat. No. Description Oty Unit Price Extended Amount TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $0.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $8,935.02 F IWPW1N11556- 211EXCE111556 -21 Change Order 1 xisCO1 Detail