Loading...
HomeMy WebLinkAbout6.k. Brockway Park-Professional ServicesAGENDA ITEM: Brockway Park Professional Services AGENDA SECTION: Consent PREPARED BY: Dan Schultz, Director of Parks and Recreation AGENDA 140. 6k ATTACHMENTS: Price quotes APPROVED BY: RECOMMENDED ACTION: Motion to approve contracting with SRF to provide professional services for the four phases of development for Brockway Park 9 ROSEMOUN 1 CITY COUNCIL City Council Regular Meeting: July 11, 2006 EXECUTIVE SUMMARY BACKGROUND There is $400,000 in the 2006 CIP budget for the construction of Brockway Park m the Harmony Development In preparation of possibly starting development m the park this year, staff has recently requested that a number of landscape architect /engineering firms provide us with a quote for professional services. The services requested include the four phases listed below: Phase I Provide the City with a colored drawing of the park plan and a cost estimate for the park construction. The park plan will be available in a digital format. Phase 1I Review of current grading plan and adjustments needed for the current park plan designed by Westwood Professional Services The consultant should calculate the amount of additional earth moving quantities needed to meet the grades set by Westwood Professional Services. Phase III Provide Civil and Electrical Engineering services to develop the construction documents (plans and specifications) Conduct the pre -bid conference. Attend the bid opening and provide the contractor letter of recommendation The construction and bid documents will be for all amenities m the park, except for the playground equipment and sun shelter. Items would include trails, parking lot, tennis courts, bocce ball courts, horseshoe pits, basketball court, baseball /softball field, all fencing and trngauon It is not necessary to included tune for storm water pondmg calculations, design or agency reviews Phase IV Provide construction administration and construction inspection services. SUMMARY Staff received price quotes form ten different consulting firms The prices quotes submitted are broken down by phase and also hsted as a total package. The Parks and Recreation Commission reviewed the submittals on Monday, June 26 and recommended that the City Council approve contracting with SRF for the professional services needed to develop Brockway Park leiol Z60'1Z 24,800 096' LE 000 000'6E 000`01$ 43,480 56,375 57,800 96,900 or more Al Ped 5,468 00 L' L 001`6 000'Z4 009'01. 000'0Z 003`04 10,500 008'6 000'09 000'017$ III Ped 66L'1L 1 001'01 008`8 L 000'91 009' L 3 13,000 09L'9Z 043'6£ OOL'ZE 0 00'81 1 II Ped 9LO'E 'I 004'1$ 001'9 000' 5,000 000'L 001'4 41£'17 006'9 4,500 I lied 61L 2,500 099'3 000'E 2,000 64 OZL`Z 043'3 001'9 00 Consultants dHS (q,00 AbbeA r cGhie Betts Od1H 130 I 8MS 1 Brauer and Assoc. I Va711 s Brockway Park Professiona