HomeMy WebLinkAbout6.n. Payment # 9 & Final-Well House #12, City Project #351AGENDA ITEM: Payment #9 Final -Well House #12, City Project #354 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, P.E., City Engineer AGENDA NO. 6n ATTACHMENTS: Payment #9 Final APPROVED BY: /j RECOMMENDED ACTION: Motion to approve Payment #9 and Final to EnComm Midwest, Inc., for Well House #12, City Project #354 and accept for perpetual maintenance. 4 ROSEMOUNT City Council Meeting: July 11, 2006 BACKGROUND: SUMMARY: CITY COUNCIL EXECUTIVE SUMMARY This project consisted of the construction of Well House #12 on Boulder Avenue within the Business Park As noted m the attached letter from Ms. Nancy Zeigler with WSB, the final payment in the amount of $37,000.96 is retamage, sub -grade excavation and topsoil borrow The total final contract amount is $552,453.53 which is 1.5% 0 over the original contract amount The increase is due to additional sub -grade excavation that was necessary to remove unsuitable soils encountered on -site. Staff recommends that Council approve Payment #9 and final for the project and accept for perpetual maintenance subject to the following conditions. 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290 92 requiring withholding state income tax. 2. Evidence m the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or sausfactonly secured. 3. Consent of Surety to Final Payment Certification from the contractor's surety. G \ENGPROJ\ 354 \Payment#9- FinalWellHouseCC7 -11 -06 doc s WSB Associates, Inc June 29, 2006 Infrastructure 1 Engineering 1 Planning 1 Construction Mr. Andy Brotzler, P.E. City Engineer City of Rosemount 2875 145`" Street West Rosemount, MN 55068 Re: Construction Pay Voucher No. 9 (Final) Well No. 12 Well House City of Rosemount Project No. 354 WSB Project No 1391 -023 Dear Mr. Brotzler: Please find enclosed Construction Pay Voucher No. 9 (final) in the amount of $37,000.96 for the above- referenced project This is the final pay voucher for the project and is for some subgrade excavation, topsoil borrow, and the retamage. The project was over budget by approximately 1 5 or $8,200.00. because of more than anticipated subgrade excavation due to poor soil. The quantities completed to date have been reviewed and agreed upon by the contractor and we hereby recommend that the City of Rosemount approve Construction Pay Voucher No. 9 (final) for EnComm Midwest. Inc. The project has resulted in the completion of Well House No. 12, including a pump, piping, appurtenances, chemical feed, mechanical systems, electrical systems, and site work. Final paperwork is attached and includes 1 Contractor's Affidavit of Payment of Debts and Claims. 2 Contractor's Affidavit of Release of Liens. 3. Consent of Surety to Final Payment 4. IC -134 Form Withholding Affidavit for Contractors If you have any questions or comments regarding the enclosed, please contact me at 763 287 -8316. Thank you. Sincerely, WSB Associates, Inc. Enclosures '&34 Nancy D. Zeigler, P.E. Project Manager 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel 763 541 -4800 Fax 763 541 -1700 cc: Cindy Dorniden, City of Rosemount EnComm Midwest, Inc. srb Minneapolis 1 St Cloud FAWPWINV391L2TW LY Nome 12 Cerre.rpomieuceV.Th VO 9 PNL Cry a emtzk, 0626(M dor Equal Opportunity Employer WSB e As owes Inc Owner City of Rosemount Date June 16, 2006 For Period 01;26/06 through 04/13/06 Request No: 9 AND FINAL Contractor EnComm Midwest, Inc. SUMMARY 1 Onginal Contract Amount 2 Change Order Addition 3 Change Order Deduction 4 Revised Contract Amount 5 Value Completed to Date 6 Material on Hand 7 Amount Earned 8 Less Retainage 0% 9 Subtotal 10 Less Amount Paid Previously 11 AMOUNT DUE THIS PAY VOUCHER NO. Recommended for Approval by WSB ASSOCIATES, INC. Projec Man gin PAY VOUCHER WELL NO 12 WELL HOUSE CITY OF ROSEMOUNT PROJECT NO 354 WSB PROJECT NO 1391 -023 9 AND FINAL Specified Contract Completion Date Date: September 15. 2005 0.00 0.00 Approved by Contractor: Approved by Owner ENCOMM MIDWEST, INC. CITY OF ROSEMOUNT 544,265 00 544265 00 552 453 53 0.00 552 453 53 0.00 552,453.53 515,452 57 37,00096 PlpseMxW and SeMVSLLon HaJOinenLOCM Soltingsqemparary Yhnpt R,V91OLKf911391Y19 Voucher It 9 PM. 1 03/01/05 03/31/05 $19782 94 $1,041.21 $20.824 15 2 04/01/05 04/30/05 $68,913.00 $4,668 21 $93,364 15 3 05/01/05 06/02/05 $80,751 43 S8,918 28 $178,365 65 4 06/03/05 07/06/05 $83 517 82 $13,313 96 $266,279 15 5 07/07/05 08/02/05 548,457 13 $15,864 33 $317,286 65 6 08/03/05 09/09/05 $130,199 16 $22,716 92 S454.338 40 7 09/10/05 10/06/05 $63,720 54 $26,070 63 $521,412 65 8 10/07/05 01/25/06 $20,11055 $27,12908 $542,581.65 9 AND FINAL 01/26/06 04/13/06 $37,000.96 $0 00 $552,453 53 Total Payment to Date $552,453.53 Original Contract $544,265 00 Retainaqe Pay No. 9 AND FINAL $0 00 Change Orders 50 00 Total Amount Earned $552,453 53 Revised Contract $544,265.00 PROJECT PAYMENT STATUS OWNER CITY OF ROSEMOUNT CITY OF ROSEMOUNT PROJECT NO 354 WSB PROJECT NO. 1391 -023 CONTRACTOR. ENCOMM MIDWEST, INC. CHANGE ORDERS No. Total Change Orders $0 00 PAYMENT SUMMARY No. Material on Hand Date From To Payment $o 00 Description Retainage Amount Completed Peyo 1 e11 F IWPWIMp9I-0311]p-02.1 POUCHERS11391 -023 Voucher No 9 FM. Oa tO CO Cn NJ 50 cn 0 cn k NJ 01 CO Ca 0 a Ca NJ CFI 01 Cri 0) Ul 0 o 0. ro to 2 en co (0 6 co co 5 0 a to en 2 co 0 R j cr O CA O Er CD o /0- o- c ro co co O 2. o 6 5 S cID 0 at W CD cn o o 0 03 0 G 00 E O 71 o 0 NJ 0 CJ1 CO 0) CO CO CD 0 m 0 y p 0 r n `m a y O 0 C Z Z 0 C Z at 0, N p O O 0 A m W r CO W W 7. 0 0 0 0 0 N 0 0 O 0 0 m 0 0 0 T C m O 0 0 0 C N Payment Application containing Contractor's signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION N N N N N N N N N 0 0 0 0 CO V Cr 0 A W N 0 d CO CO -4 O (J( A W N- 0 (O CO V Of ITEM D SUB- TOTALS 0 0 -t -I >0-10 0 0 0. CO n n T o A m 0 n j c•o O ov 0 d ry a C d a c c O O g o 0 o c x <C ID 6 d O a 10 N m O j d c N d c 6 4 d a W W c A 0 d T t—) a> a o 0 d< O m C N O 2 d (D O C C c x 0 O T Z O 0 J a 3 3 N f d d j =a co IX 0 O ff, w n N? O p N? N r n O x x O C7 n 0 b n v O a a Z C 0 9 7 O F-5 c (n co x c w o n a d -1 W 0 n n CD 0 (0 a 0 C -y n r c j 0 g r CO CD 7 WORK DESCRIPTION CO $74,037 35 a fA IS .a 99 (T fA EP (A EA 99 f9 M fA Co O AOff L o J A 03 yJ E9 N ED ER a J f C O ED et di E GO A W J' 0 0 0 W P EA 0 0 v O N m 1 C A T 0 0 (r 0 0 CO N in 0 0 0 0 0 0 N N 0 0 0 0 N 0 0 0 0 0 0 0 0 0 0 0 CO 0 CI Ci CI 0 0 0 0 0 0 0 0 0 0 0 0 0 0000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 SCHEDULED AMOUNT I 0 $75,502 50 E9 E9 H 49 M IS E9 61 bi E9 E9 69 {A fe/ 69 N EA 41 W A 69 4t O N N N W E9 EN E9 E9 E9 .69 E CO A 01 0 V (O 0 10 A N L W m A 'co (T -...4 A pp C V N O O O O O O O O v 0 0 01 0 0 0 0 0 0 0 0 0 0 0( CI L11 0 0 0000000000 00000000000000000000000000000 AMOUNT PREVIOUS PERIODS 1 COMPLETED WORK 1 D I E $9,871 88 69 E9 W O) EA E9 E9 E9 E9 M W E9 E9 A E9 E9 M M E9 E9 E9 M S 49. .16 E9 E9 t9 E 0000000 0 0- 0 0 000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 0 0000000 AMOUNT THIS PERIOD $0 00 IS VI bf 45 fA EA E9 E9 b) E9 to E9 H M M W 44 69 .9 E9 M E9 E9 E9 4 00000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000000000000000000000000000 STORED MATERIALS (NOT IN D OR E) T $85,374 38 I N d) E9 4 dl EA *A 49 E9 EA EA fA d) 49 49 E9 N 41 W A y) W W ET N E9 N 49 M A V EA (O De M (A M M M 01 CO p a d W T V 0 O) (O N 0 U W W N A (O (11 .4 W (T 01 N O 0 0 0 0 0 0 0 0 (P 0 0 (n 0 0 0 0 0 0 0 0 0 0 0 0 01 0 0 0 0 0 0 0 0 CO 0 0 N 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 CO 00 0 00 0 0 00 0 00 000 0 000000 TOTAL COMPLETED AND STORED (D E F) 115 CO 0 CO CO CO cn CO 0 A 0 0 0 4 0 0 0 0 0 0 CO 0 0 W 0 W W 0 V W 0 0 0 0 9090 O W W m 0 0 e o e e e e o e e e o e ",3c).--; e o e e e o e e o -0 O e n y I 1 I ($11,337 03) H E9 EA E9 d1 E9 A f9 M N N M Er (R CO V W O co W V 0 A V_ m N 0 0 C 0 0 0 A 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 4 00000000000000000000000000000 00010000000000C-10000 BALANCE TO COMPLETION (C -G) RETAINAGE (If Variable) 0 m 0 y p 0 r n `m a y O 0 C Z Z 0 C Z at 0, N p O O 0 A m W r CO W W 7. 0 0 0 0 0 N 0 0 O 0 0 m 0 0 0 T C m O 0 0 0 C N Payment Application containing Contractor's signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION 0 0 0 0 L m --3 0 CD CD W 0 a 1 Payment Application containing Contractor's signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION CZ; eery; Q NC}� 0' a a a a A a a a a a a ca w w ((g� co W W c V N L W N O (O m J N O A W N O CO W J 0) Q1 a W l ITEM D 1 SUB- TOTALS co 'D T O co O 0 O m 3 V 71 0, 3 0 m O o m 0 N _m of N N 0_ O O W W N 3 W (_b C W O O C O o 0 o O a f 2 C Q F N N 0 W W a 5 N o W a 3 0 5 4 4 a O* O 1 Jk r y O N CO CO J J. co d N CO W W n (O IL C 'Z `2 n O W N m C C N W W Q N F O 2. �9 W w N O O C W J d N O N= 9 O a 0 Q d 0 N F O C 3 N O@ N N J O D 3 N N W W V 0 EP ET o x 5 W (0 N WORK DESCRIPTION CO $247,495 00 M 69 69 a a D N a a a 0+ W T a a m a m M a a N m W N a W y V CO 0) co N co co C O !+J J O A (0 W Co "(T t 0l 'co in co N fl CO NJ 10 0 8888 0 0 0 0 0 0 0 0 0 0 8888-a.8888 C 0 0 0 0 0 0 0 0 0 0 0 0 0 O O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 0 0 0 0 0 0 0 0 0 Cn O O o 0 0 C SCHEDULED AMOUNT 0 $245,811 65 a a a a a 69 a a a a a a a a a a a a A a a a a a a a CD N A Oa a W 0) a CO CO a N Co Cc 0) a 'V W O1 co N CO CO O CO J O a (O W 01 Q) N W a U N CO 10 0 0 01 C 01 69 U1 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 a 0 A 0> O tT C 000 000000000001000000000100000 000000000000000000 AMOUNT PREVIOUS PERIODS i1 1 COMPLETED WORK_ 1 D 1 $9,871 88 00000000000000000000000000000 O O C O O o O O O 0 O O O O O O O O O O O 0 0 0 0 0 C AMOUNT THIS PERIOD $000 n 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 C 00000,0000000 00000000000000000000000000000 0 0 0 0 0 0 0 0 0 0 STORED MATERIALS (NOT IN D OR E) m $255,68353 a a a a 49 a s+ M a s r a H a tN M M 4a9 A a a a a a a CO N A a a Co W OI a a CO a a Co 0) a a N N a N a s J CO Cr CO a N m Co O W N O A 0 W CO U 0 co (n CO CO CO N 0 0 0 0 0 CO 0 0 0 01 0 0 0 01 0 0 0 0 0 0 0 o a 0 0 A m 44 01 0 0 0 0 8888 o 00 00 00 0 0 o C 0 0 0 0 0 0 0 0 0 OO 0 0 CP o 0 0 O 0 0 0 C TOTAL COMPLETED AND STORED (D +E +F) Cl 103 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 m (a 0 W C S o o= s 0 0 0 0 0 o a o S. s 0 0 0 0 S 0 0 0 0S o O 1 ($8,188 53)', a la TA o 4 a a a a a a a a a a a a a a a a 0' a s fA a 0 w 01 0 a 000000000000000000000 A 0 0 0) 0 000000000000000000000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0000 BALANCE TO COMPLETION (C -G) 1 H RETAINAGE (If Variable) 0 0 0 0 L m --3 0 CD CD W 0 a 1 Payment Application containing Contractor's signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION Co o 0 A W CD W N 0 O 0 0 N 0 0 W O O) z 0 O m 0 O no m m D no O O E m c a ,t o z w C c z s m co 0 O Payment Application containing Contractors signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION BOY/c1 NOLLWINIINOO LLVOIlddV C7 1 a w o ITEM D TOTALS (n m o 0 m m a r V c o r C 17 1 3 9 to o x to o ci WORK DESCRIPTION m $544,265 00 eM A 9 a V ix CT 0 a 0, LT CT LT CO IV 00000000 00000000 00000000 SCHEDULED AMOUNT 0 $542,581 65 w W V A y! V (T m 0 0 cT CP LT DI CT I6) 0 00000000 0 0 0 00000000 AMOUNT PREVIOUS PERIODS COMPLETED WORK J D I E 1 $9,871 88 fH bl V 00000000 000 0 0 0 AMOUNT THIS PERIOD $0 00 N M f9 t 0 0 0 0 0 0 0 0 0 STORED MATERIALS (NOT IN ID OR E) T 1 $552,45353 AR fA W V N N A fy V 01 a N CO 01 0 -CO V V tD 0' 10 N UT 0 0 (T [T 0 0 0 O 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 00000000 TOTAL COMPLETED AND STORED (D E F) 0 102% 0 0 0 0 0 e e e 00 0 ($8,188 53) f» M 69 0 0 0 0 0 0000000 BALANCE TO COMPLETION (C -G) 1 RETAINAGE (If Variable) Co o 0 A W CD W N 0 O 0 0 N 0 0 W O O) z 0 O m 0 O no m m D no O O E m c a ,t o z w C c z s m co 0 O Payment Application containing Contractors signature is attached CONTINUATION PAGE FOR PAYMENT APPLICATION BOY/c1 NOLLWINIINOO LLVOIlddV