HomeMy WebLinkAbout6.h. Change Order #2 and Final Payment #12 Connemara Trail Overpass, City Project #379AGENDA ITEM: Change Order #2 and Final Payment #12
Connemara Trail Overpass, City Project
#379
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, P.E., City Engineer!
AGENDA NO. 6.h.
ATTACHMENTS: Change Order #2, Payment Voucher,
Map
APPROVED BY:
J/
RECOMMENDED ACTION: Motion to approve Change Order #2 for the Conn ara Trail
Overpass, City Project #379.
-and
Motion to Approve Payment #12 and Final for the Connemara Trail Overpass, City Project
#379, to Lunda Construction and Accepting it for Perpetual Maintenance.
4 ROSE
SUMMARY:
MOUNT
BACKGROUND:
CITY COUNCIL
City Council Meeting: October 3, 2006
EXECUTIVE SUMMARY
This item is on the agenda to request Payment #12 and Final to Lunda Construction for the Connemara
Trail Overpass, City Project #379, as well as Council consideration of Change Order No. 2 for the
aforementioned project. This project included the construction of the bridge deck and approaches for the
overpass. The change order addresses the following revisions to the project:
1. $15,702 42 for the extension of electrical power to the bridge for streetlights.
2. $12,611.50 for approach grading at the north abutment performed as extra work.
The final construction amount of $1,538,921.34 is 1.3% above the revised contract amount of
$1,519,586.37. Items contributing to Increases in the overall construction cost tnclude minor overruns on
select granular borrow, concrete slope paving, reinforcing bars, and traffic flagging
Staff recommends that Council approve Change Order #2 and Payment #12 and final for the project and
accept the project for perpetual maintenance subject to the following conditions.
1. Satisfactorily showing that the contractor has comphed with the provisions of Minnesota Statutes
290 92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all clanns against the contractor by reasons of the
contract have been fully paid or sausfactonly secured.
3 Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
G \ENGPROJ \379 \Change Order2 -Final PaymentCC10 -3 -06 doc
WSB
&Associates, Inc
September 21, 2006
Infrastructure 1 Engineering 1 Planning 1 Construction
Honorable Mayor and City Council
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Attn: Cindy Domiden, City of Rosemount
Re: Construction Pay Voucher No 12 and Final
Connemara Trail (STA. 72 +00.00 to STA. 76 +50.00)
Street and Bridge Construction and Appurtenant Work
5 A.P. No. 208 104 -04
Bridge No. 19557
City of Rosemount Project No. 379
WSB Project No. 1561 -00
Dear Mayor and Council Members:
701 Xenia Avenue South
Suite 300
Minneapolis, MN 55416
Tel 763 541 -4800
Fax 763 541 -1700
Please find enclosed the final Construction Pay Voucher No. 12 (Final) for the above referenced
project in the amount of $49,842.74. We recommend final payment subject to receipt of the
following items
1: Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requinng withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of
the contract have been fully paid or satisfactonly secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
Please make payment in this amount to Lunda Construction Co. at your earliest convenience.
Sincerely,
WSB Associates, Inc.
Enclosures
cc: Andy Brotzler, City of Rosemount
Lunda Construction Co.
tsf
Minneapolis 1 St Cloud
Equal Opportunity Employer
G LENGPROJU 9V.TR VO12 FM CTY -Nrcc- 093106 doe
Project Summary
1
Original Contract Amount
$1,491,272 45
2
Contract Changes Addition
$28,313 92
3
Contract Changes Deduction
$0 00
4
Revised Contract Amount
81,519,586 37
5
Value Completed to Date
$1,538,921 34
6
Material on Hand
$0 00
7
Amount Earned
$1,538,921 34
8
Less Retainage
$0 00
9
Subtotal
$1,538,92134
10
Less Amount Paid Previously
$1,489 078 60
11
Liquidated Damages
$0 00
12
AMOUNT DUE THIS PAY VOUCHER NO
12 FINAL
$49,842 74
01561 -00 Pay Voucher 12
Approved
Lunda Con
Comment
Owner: City of Rosemount
2875 145th Street West
f S'B Rosemount, MN 55068 -4941
f For Period: 31112006 to 9/15/2006
ONOMSOS Contractor: Lunda Construction Co.
K.4.sociares, Inc 620 Gebhardt Road
Black River Falls, WI 54615
Pay Voucher
RSMT Connemara Trail Bridge
Client Contract No
Project No 01561 -00
Client Project No 379
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS
BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO,
THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER
Recommended for Approval by
WSB Associates, Inc.
tractor
ion Co.
L
Specified Contract Completion Date
11/1/2005
Construction Observer
Approved by Owner
City of Rosemount
Date
Thursday, September 21, 2006
Date: 9/21/2006
Request No.: 12 FINAL
1 of 4
t
CONNEMARA TRAIL BRIDGE (STA. 72 +00 00 to STA 76 +50 00)
STREET AND BRIDGE CONSTRUCTION AND APPURTENANT WORK
CITY ROSEMOUNT PROJECT NO 379
S A P NO 208-104-04, BRIDGE NO. 19557
WSB PROJECT NO 1561 -00
OWNER
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE
PREVIOUS CHANGE ORDERS N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER
NET INCREASE OF THIS CHANGE ORDER
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS.
RECOMMENDED BY
APPROVED BY
CITY ENGINEER
DATE OF COUNCIL ACTION
CHANGE ORDER NO. 2
$1,491,272 45
$0 00
$1,491,27245
$28,31392
$1,519,58637
CONTRACTOR
LUNDA CONSTRUCTION CO.
620 GEBHARDT ROAD
BLACK RIVER FALLS, WI 54615
CHANGE IN CONTRACT TIME-
ORIGINAL CONTRACT TIME
NET CHANGE FROM PREVIOUS CHANGE ORDERS
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE WITH CHANGE ORDER
CONTRACT TIME WITH APPROVED CHANGE ORDERS
APPROVED
CONTRACTOR SIGNATURE
LUNDA CONSTRUCTION CO
CONTRACTOR
CITY ADMINISTRATOR
G IENGPRO A3 7 911561-00 Change Order 2C0.2
8/30/2006
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION.
CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
9/2/2005
59 Days
11/1/2005
NONE
11/1/2005
CONNEMARA TRAIL BRIDGE (STA 72+00 00 to STA 76+50.00)
STREET AND BRIDGE CONSTRUCTION AND APPURTENANT WORK
CITY ROSEMOUNT PROJECT NO 379
S.A P NO 208 104 -04, BRIDGE NO 19557
WSB PROJECT NO. 1561 -00
ADDED ITEMS
DELETED ITEMS
Item No Mat No. Description
CHANGE ORDER NO. 2 DETAIL
TOTAL DELETED ITEMS CHANGE ORDER NO. 2 $0.00
NOTES 1 EXTRA WORK LIGHTING POWER SERVICE INSTALLATION PERFORMED BY KILLMER ELECTRIC 6/06 7/06, INCLUDES
PRIME CONTRACTOR MARK UP OF 10
2 EXTRA WORK GRADING AT NORTH ABUTMENT PERFORMED BY DAHN CONSTRUCTION 3/11/05 4/22/05, INCLUDES
PRIME CONTRACTOR MARK UP OF 10
8/3012006
Item No Mat No Description Note Qty Unit Price Extended Amount
59 2545 602 ELECTRICAL SERVICE 1 1 EACH $15,702 42 $15,702 42
60 2401 601 APPROACH GRADING 2 1 LUMP SUM $12,611 50 $12,611 50
TOTAL ADDED ITEMS CHANGE ORDER NO. 2 $28,313.92
Qty Unit Price Extended Amount
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $28,313.92
G :IENGPROJI37941561.00 Change Order 2CO2 Detail
r
BIRD$ONG w
CT
a
DSONG PATH 0
136TH ST) 0
Sri
►NT ml
BCH IR
F LMONT TF?
0 Is‘
iT W
n
o TRL
k
x
Fa
BLO
Q r° PL
0 250 500 1,000 1,500
CON r
tO v
CT C
IZ
140TH ST c
IXI
r
saw 138TH ST 1 9G 'v pVE
J 4 I BELVIDERE
MARE POND to
t"' Q
IN 9
.PLo N PAry
AFIELD PATt1 •GOST A ,y
-OB A!
t I Q
J/, Q4� 2 ALEA i pPC
CIA/ p I ERRY\
w j I (bt BAY'
AYBERRY TRL C►R I
AURORA AVE
2,000
Feet
MARE
POND 135TH ST W
AT 17,
9� Ia
'0
moo 4*
F DO P
P VC \MN
P'i
FILe e snap2/ snarel /GIS /Gty'Maps/Departmental Maps/Engmeenng'Chns Connemara Oeercaas Loca;c nxo
\_)509
FI STW
qL I co La
0
PJ 0 1--
NR`�N�i CTRL
G; 1 42ND �p
Ij ST 5 t
C r O OMFIELD
Connemara Trail Overpass
4- A Y 145TH S'
August 2006,