Loading...
HomeMy WebLinkAbout7.a. Assessment Hearing - 2006 Pavement Management Project, City Project #396AGENDA ITEM: Assessment Hearing 2006 Pavement Management Project, City Project #396 AGENDA SECTION: Public Heanng PREPARED BY: Andrew J Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Updated Project Cost and Funding Summary, Resolution; Map APPROVED BY: RECOMMENDED ACTION: Motion to Adopt a Resolution Adopting the Assessment Roll for the 2006 Pavement Management Project, City Project #396 4 ROSEMOUNT City Council Meeting October 17, 2006 SUMMARY: Packet page 104 of 207 CITY COUNCIL EXECUTIVE SUMMARY BACKGROUND: At the September 19, 2006 meeting the City Council declared costs and called for the Pubhc Hearing to consider the assessments for the 2006 Pavement Management Project, City Project #396. The total project cost is $1,341,579. Attached is an updated project cost and funding summary of the total amount, $582,305 is proposed to be assessed to adjacent properties as shown on the attached assessment roll. The project will be assessed over a 10 -year period at an interest rate of 5.9659 If required, Staff will provide a brief overview of the project and answer any questions that you or the pubhc may have regarding this item. Staff recommends that the City Council adopt a resolution adopting the assessment roll as presented. C \Documents and Settings \adc \Desktop \October 17, 2006\ CP396- AdoptAssessmentCC10 -17 -06 doc ITEM AMOUNT CONSTRUCTION COST: Watermain Sanitary Sewer Storm Drain Street $64,400 $48,379 $168,045 $777,220 Subtotal $1,058,044 ENGINEERING: Design Engineering Construction Engineering Soil Borings/Testing $96,977 $113,550 $19,581 Subtotal $230,108 ADMINISTRATION, LEGAL, FINANCE Administration (5% Construction Cost) Legal Notices Legal Fees Communication Costs Recording Fees Other Costs (Professional) Bond Issuance Costs Permits $52,902 $525 Subtotal $53,427 TOTAL PROJECT COST $1,341,579 PROJECT COST SUMMARY CITY PROJECT #396 2006 PAVEMENT MANAGEMENT PROJECT C\Documents and Settings \adc\Desktop \October 17, 2006\CP396- Project Cost Summary Assessments Final doc Packet page 105 of 207 TOTAL PROJECT COST FUNDING SOURCES AMOUNT Streets Sidewalk Fund CI P Assessments $403,194 $582,305 Subtotal $985,499 Storm Drain Utility Core Assessments $213,078 Subtotal $213,078 Sanitary Sewer: Utility Core Assessments $61,344 Subtotal $61,344 Watermain. Utility Core Assessments $81,658 Subtotal $81,658 TOTAL FUNDING $1,341,579 PROJECT FUNDING SUMMARY CITY PROJECT 396 2006 PAVEMENT MANAGEMENT PROJECT C \Documents and Settings \adc\Desktop \October 17, 2006\CP396- Project Funding Summary Assessments Final doe Packet page 106 of 207 A RESOLUTION ADOPTING THE ASSESSMENT ROLL FOR 2006 PAVEMENT MANAGEMENT PROJECT CITY PROJECT #396 WHEREAS, pursuant to nonce duly given as required by law, the City Council has met, heard and passed upon all objections to the proposed assessment for 2006 Pavement Management Project, City Project #396, and has amended such proposed assessment as it deems just. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Rosemount, Minnesota, as follows (1) Such proposed assessment, in the amount of $582,305 a copy of which is m Clerk's File dated 10 -17 -06 is hereby accepted and shall consntute the special assessment against the lands named therein, and each tract of land therein is hereby found to be benefited by the proposed improvement. (2) Such assessments shall be as follows: (3) CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2006- a. The assessments shall be payable in equal annual installments extending over a period of ten (10) years, the first of said installments to be payable with general taxes for the year 2006, collectible with such taxes during the year 2007 b. To the first installment shall be added interest at the rate of 5.9659% per annum on the entire principal amount of the assessment from the date of this resolution until December 31 of the year m which such installment is payable To each subsequent installment, when due there shall be added interest for one year at said rate on the unpaid pnncipal amount of the assessment. c. The owner of any property so assessed may at any time prior to the certification of the assessment or the first installment thereof to the County Auditor, pay the whole of the principal amount of the assessment on such property with interest accrued to the date of payment to the City Treasurer, except that no interest shall be charged if the entire assessment is paid within 30 days from the date hereof, and such property owner may at any time prior to November 15 of any year pay to the County Auditor the entire principal amount of the assessment remaining due with interest accrued to December 31 of the year in which said payment is made. The City Clerk shall forthwith transmit a cernfied duphcate copy of this assessment roll to the County Auditor to be extended on the tax hst of the County ADOPTED this 17th day of October, 2006. Packet page 107 of 207 ATTEST: Amy Domeier, City Clerk Packet page 108 of 207 (SEAL) CERTIFICATION William H. Droste, Mayor Resolution 2006 I hereby certify that the foregoing is a true and correct copy of a resolution presented to and adopted by the City Council of Rosemount at a duly authorized meeting thereof, held on the 17th day of October, 2006, as disclosed by the records of said City in my possession Amy Domeier, City Clerk Motion by Seconded by Voted in favor: Voted against: 2 cu co 0 el in LU 0 in 111 I 0 I- ZZLLILLILLI W W to to to 4 W W W OOw unw QD4« ILI cc WW(AcA CO W W W OOcococo re cc cncoco CO liJ 4 E' g c4 CO a) oi tsi o FE CO 2 W W CO CO CO W W W OO cod) v) aa¢a¢ CO 2 CD 0 CO 0 tr Z 11.1 2 I:13 ct W W OD OD OD W W W OOmtna) aa¢ -7 CO CO CO OOmCO CO aa¢¢ 2006 Pavement. Rana ement Pra'ec 2DSTW o -Pi r 0. J ST W DERBY' 'CIR DCTW i3RD ST 0 255 510 CR CENT CIR OF‘ J 9j. 43RD ST A MORANT <Yr O H co w U w UPPER 149TH ST W w w z CA W 111 cll 0 U 151ST r ST� NBER TRL/ 'TSTW Z 0 w de UU UU •S' O'LEARY'S cA R PONI07 COLUMBAR CIR w 1,020 1,530 w cc uJ w w m o o i x U ix 2006 Pavement Management Project y fl 9 CIMARRON 14P 152ND ST W 153RD ST W 2,040 Feet FILE Nsrf$pP1AIII113S13 /C,4tOM (Departmental Maps/Engineering /Chris /2006 PMP locate mxd 143RDFST W UPPER 144TH 143RD ST W Q 146TH L. 147TH 149TH ST W ST W 143RD ST IA 0 z U J 0 cc w 2 LL C L. 150TH ST W September 2006