Loading...
HomeMy WebLinkAbout6.h. Payment #12 & Final - Glendalough 5th Street and Utility Improvements, City Project #389AGENDA ITEM: Payment #12 Final Glendalough 5th Street and Utility Improvements, City Project #389 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Payment Voucher, Map APPROVED BY: RECOMMENDED ACTION: Motion to Approve Payment #12 and Final for the Glendalough 5 Street and Utility Improvements, City Project #389, to Richard Knutson, Inc. and Accepting it for Perpetual Maintenance 4 ROSEMOUNT City Council Meeting. October 17, 2006 BACKGROUND: This item is on the agenda to request Payment #12 and Final to Richard Knutson, Inc. for the Glendalough 5 Addition, City Project #389. This project included the construction of streets, sanitary sewer, water main, storm sewer and sidewalks within the Glendalough 5` Addition. The final construction amount of $816,685.76 is 2 9% below the contract amount of $840,890.28. SUMMARY: Packet page 88 of 207 CITY COUNCIL EXECUTIVE SUMMARY Staff recommends that Council approve Payment #12 and final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290 92 requiring withholding state income tax 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or sansfactonly secured. 3 Consent of Surety to Final Payment certification from the contractor's surety. 4. Two-year maintenance bond. C \Documents and Settings \adc Desktop \October 17, 2006 \CP389 Payment 12&Fina1CC10 -17 -06 doc 1 WSB Associates, Infrastructui e 1 Engineering 1 Plannang 1 Construction 701 Xenia Avenue South Suite 300 October 10, 2006 Minneapolis, MN 55415 Tel 763- 541 -4800 Honorable Mayor and City Council Fax 763 541 -1700 City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn Cindy Dorniden, City of Rosemount Re. Construction Pay Voucher No. 12 (Final) Evermoor's Glendalough 5 Addition Street and Utility Construction City of Rosemount Project No. 389 WSB Project No 1556 -21 Dear Mayor and Council Members: Please find enclosed the final Construction Pay Voucher No. 12 (Final) for the above referenced project in the amount of $45,585.05. We recommend final payment subject to receipt of the following items I. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. Please make payment in this amount to Richai d Knutson, Inc. at your earliest convenience. Sincerely, WSB Associates, Inc. Morgai Project Manager Enclosures cc Andy Brotzler, City of Rosemount Richard Knutson, Inc. tsf Minneapolis 1 St Cloud Packet page 89 of 207 Equal Opportunity Employer I. II con 1114__' mu) 1 fl l: h\L [714,,nrna106 Yy Project Summary 1 Original Contract Amount $831,955 26 2 Contract Changes Addition $8,935 02 3 Contract Changes Deduction 50 00 4 Revised Contract Amount $840,890 28 5 Value Completed to Date $816,685 76 6 Material on Hand $0 00 7 Amount Earned $816,685 76 8 Less Retainage $0 00 9 Subtotal $816,685 76 10 Less Amount Paid Previously $771,100 71 11 Liquidated Damages $0 00 12 AMOUNT DUE THIS PAY VOUCHER NO 12 FINAL $45,585 05 01556 -21 Pay Voucher 12 Recommended for Approval by WSB Associa ..s, Inc. by Co tract nutso .Ir( Approv Richard Specified Contract Completion Date 6/30/2005 Comment. WSB aaWatirfAilra d csnc,ates, Mc.. Packet page 90 of 207 Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 8/1/2006 to 9/30/2006 Contractor: Richard Knutson, Inc. 12585 Rhode Island Ave. South Savage, MN 55378 Pay Voucher RSMT Evermoor" s Glendalough 5th Addition Plan Review Client Contract No Project No 01556 -21 Client Project No 389 I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER Construction Observer. Approved by Owner: City of Rosemount Date Thursday, October 05, 2006 Date: 10/5/2008 Request No.: 12 FINAL 1 of 4 _IFFE OCT Zel 0 T "t GGS Al O a iffE, scr `q‘k CROLL Y C G OUC F G R- CHARLSTON WAY 1 a n -o 9 TH U 4. Glendalough 5th Addition 0) Ce 0 250 500 1,000 1,500 z 135IH ST 0 COLESHIRE P,q is CORLISSTRL 0 0 iN 137TH ST a Q a 0 G o 0 0 CC CC 0 0 SCHWARZ POND 2,000 Feet C O September 2006 FILE /Isnap2/sharel /GISIC,rvlMaps /Departmental Maps /Eng,neennglChnsl2006 Glendalough 5111 Locate mxd Packet page 91 of 207