HomeMy WebLinkAbout6.f. Change Order #1 - Old County Road 38/132nd Court West Street and Utility Improvements, City Project #387AGENDA ITEM: Change Order #1 Old County Road
38/132 Court West Street and Utility
Improvements, City Project #387
GENDA SECTION:
A GEND
A
PREPARED BY: Andrew J Brotzler, PE, City Engineer
AGENDA NO.
ATTACHMENTS: Change Order #1
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Old County Road
38/132' Court West Street and Utility Improvements, City Project #387
4 ROSEMOUNT
CITY COUNCIL
City Council Meeting October 17, 2006
EXECUTIVE SUMMARY
BACKGROUND:
Attached for Council consideration is Change Order No. 1 for the Old County Road 38/132 Court West
Street and Utility Improvements, City Project #387. This change order addresses the following revisions
to the project.
1. Increasing the size on two water manholes from 72" to 96" diameter in order to accommodate the
24" butterfly valves and allow sufficient clearance for safe and efficient operation
The above changes to the project result in a net increase of $8,660 for a revised contract amount of
$6,124,282.56,
SUMMARY:
Staff recommends Council approval of Change Order No. 1 for the Old County Road 38/132 Court
West Street and Utility Improvements, City Project #387.
Packet page 80 of 207
C \Documents and Settings \adc \Desktop \October 17, 2006 \CP387- ChangeOrder1CC10 -17 -06 doc
s
WSB
8 A xouarca, Inc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Suite 300
October 2, 2006 Minneapolis, MN 55416
Tel 763 -541 -4300
Fax 763- 541 -1700
Mr. Andy Brotzler, P.E.
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 1
Old County Road 38 and 132 Court West
Highland Way (7 Street to CSAH 75)
Street and Utility Improvements
City of Rosemount Project Nos. 387 and 393
WSB Project Nos. 1591 -02 and 1556 -52
Dear Mr. Brotzler:
Please find enclosed Change Order No. 1 (in triplicate) for the above referenced project. The
change order reflects a net increase to the contract amount of $8,660.00 for a revised contract
total of $6,124,282.56. If the attached meets with your approval, please sign and process.
The plan called for among other things for the installation of a 24" butterfly water valve in a 72"
diameter manhole. The butterfly valve ordered by the contractor would not fit into the manhole
specified and still allow sufficient clearance for the safe and efficient operation of the valve. The
water manhole was increased in size to 96" diameter which resulted in an additional cost of
$4,330.00 for each watermain manhole. There are two such manholes on the project which will
result in an overall increase with this change order in the amount of $8,660.00.
If you have any questions or comments regarding the enclosed, please contact me at 763 -287-
7184. Thank you.
Sincerely,
WSB Associates, Inc.
Jeff W. Stewart, PE
Project Manager
Enclosures
cc: Lee Mans, Arcon Construction Co., Inc.
Brian Connolly, WSB Associates, Inc.
tsf
Minneapolis 1 St. Cloud
Packet page 81 of 207 Equal Opportunity Employer arswanitha.rosi,.ar .&semen I CTF.knt.,.ramcs.
OLD COUNTY ROAD 38 AND 132ND COURT WEST
HIGHLAND WAY (7TH STREET TO CSAH 75)
STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NOS. 387 AND 393
CITY OF ROSEMOUNT, MN
WSB PROJECT NOS. 1591-02 AND 1556-52
OWNER:
CITY OF ROSEMOUNT
2875 145111 STREET WEST
ROSEMOUNT, MN 55068
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL
IT I5 UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
CHANGE IN CONTRACT AMOUNT.
ORIGINAL CONTRACT AMOUNT
PREVIOUS CHANGE ORDERS N/A
CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER:
NET INCREASE/DECREASE OF THIS CHANGE ORDER
CONTRACT AMOUNT WITH ALL APPROVED CHANGE ORDER:
RECOMMENDED BY
APPROVED BY
WSB 8 ASSOCIATES, INC
ENGINEER
CITY ENGINEER
DATE OF COUNCIL ACTION
Packet page 82 of 207
CHANGE, ORDER NO :1
$6,115,622 56
$000
$6,115,622 56
$8,660 00
56,124,282 56
CONTRACTOR:
ARGON CONSTRUCTION CO., INC.
P.O. BOX 159
HARRIS, MN 55032
CHANGE IN CONTRACT TIME:
ORIGINAL CONTRACT TIME
NET CHANGE FROM PREVIOUS CHANGE ORDERS
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE /DECREASE WITH CHANGE ORDER
CONTRACT TIME WITH APPROVED CHANGE ORDERS
APPROVED BY
CONTRACTOR SIGNATURE
ARCON CONSTRUCTION CO INC
CONTRACTOR
CITY ADMINISTRATOR
N:101591- 021AdminiConsOUction AdminlChange Orders1159l-02 Change Order ICO-1
9/20/2006
7/31/2007
NONE
7/31/2007
NONE
7/31/2007
5 e .41 r 4 1 fr t''
4: r CHANGE ORDER NO.1 DETAIL 1
OLD COUNTY ROAD 38 AND 132ND COURT WEST 9/20/2006
STREET AND UTILITY IMPROVEMENTS
CITY PROJECT NOS. 387 AND 393
CITY OF ROSEMOUNT, MN
WSB PROJECT NOS 1591-02 AND 1556-52
ADDED ITEMS
Item
No. Mat. No. Description Qty Unit Pnce Extended Amount
216 2504 602 UPSIZE WATERMAIN MANHOLE 2 EACH $4,330 00 $8,660 00
TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $8,660.00
DELETED ITEMS
Item
I4o. Mat. No. Description Qty Unit Price Extended Amount
TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $0.00
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $8,660.00
Packet page 83 of 207