Loading...
HomeMy WebLinkAbout6.f. Change Order #1 - Old County Road 38/132nd Court West Street and Utility Improvements, City Project #387AGENDA ITEM: Change Order #1 Old County Road 38/132 Court West Street and Utility Improvements, City Project #387 GENDA SECTION: A GEND A PREPARED BY: Andrew J Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Change Order #1 APPROVED BY: RECOMMENDED ACTION: Motion to Approve Change Order #1 for the Old County Road 38/132' Court West Street and Utility Improvements, City Project #387 4 ROSEMOUNT CITY COUNCIL City Council Meeting October 17, 2006 EXECUTIVE SUMMARY BACKGROUND: Attached for Council consideration is Change Order No. 1 for the Old County Road 38/132 Court West Street and Utility Improvements, City Project #387. This change order addresses the following revisions to the project. 1. Increasing the size on two water manholes from 72" to 96" diameter in order to accommodate the 24" butterfly valves and allow sufficient clearance for safe and efficient operation The above changes to the project result in a net increase of $8,660 for a revised contract amount of $6,124,282.56, SUMMARY: Staff recommends Council approval of Change Order No. 1 for the Old County Road 38/132 Court West Street and Utility Improvements, City Project #387. Packet page 80 of 207 C \Documents and Settings \adc \Desktop \October 17, 2006 \CP387- ChangeOrder1CC10 -17 -06 doc s WSB 8 A xouarca, Inc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 October 2, 2006 Minneapolis, MN 55416 Tel 763 -541 -4300 Fax 763- 541 -1700 Mr. Andy Brotzler, P.E. City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 Old County Road 38 and 132 Court West Highland Way (7 Street to CSAH 75) Street and Utility Improvements City of Rosemount Project Nos. 387 and 393 WSB Project Nos. 1591 -02 and 1556 -52 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 (in triplicate) for the above referenced project. The change order reflects a net increase to the contract amount of $8,660.00 for a revised contract total of $6,124,282.56. If the attached meets with your approval, please sign and process. The plan called for among other things for the installation of a 24" butterfly water valve in a 72" diameter manhole. The butterfly valve ordered by the contractor would not fit into the manhole specified and still allow sufficient clearance for the safe and efficient operation of the valve. The water manhole was increased in size to 96" diameter which resulted in an additional cost of $4,330.00 for each watermain manhole. There are two such manholes on the project which will result in an overall increase with this change order in the amount of $8,660.00. If you have any questions or comments regarding the enclosed, please contact me at 763 -287- 7184. Thank you. Sincerely, WSB Associates, Inc. Jeff W. Stewart, PE Project Manager Enclosures cc: Lee Mans, Arcon Construction Co., Inc. Brian Connolly, WSB Associates, Inc. tsf Minneapolis 1 St. Cloud Packet page 81 of 207 Equal Opportunity Employer arswanitha.rosi,.ar .&semen I CTF.knt.,.ramcs. OLD COUNTY ROAD 38 AND 132ND COURT WEST HIGHLAND WAY (7TH STREET TO CSAH 75) STREET AND UTILITY IMPROVEMENTS CITY PROJECT NOS. 387 AND 393 CITY OF ROSEMOUNT, MN WSB PROJECT NOS. 1591-02 AND 1556-52 OWNER: CITY OF ROSEMOUNT 2875 145111 STREET WEST ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION CONTRACT QUANTITIES ARE MODIFIED AS SHOWN ON THE ATTACHED DETAIL IT I5 UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT AMOUNT. ORIGINAL CONTRACT AMOUNT PREVIOUS CHANGE ORDERS N/A CONTRACT AMOUNT PRIOR TO THIS CHANGE ORDER: NET INCREASE/DECREASE OF THIS CHANGE ORDER CONTRACT AMOUNT WITH ALL APPROVED CHANGE ORDER: RECOMMENDED BY APPROVED BY WSB 8 ASSOCIATES, INC ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION Packet page 82 of 207 CHANGE, ORDER NO :1 $6,115,622 56 $000 $6,115,622 56 $8,660 00 56,124,282 56 CONTRACTOR: ARGON CONSTRUCTION CO., INC. P.O. BOX 159 HARRIS, MN 55032 CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT TIME NET CHANGE FROM PREVIOUS CHANGE ORDERS CONTRACT TIME PRIOR TO THIS CHANGE ORDER NET INCREASE /DECREASE WITH CHANGE ORDER CONTRACT TIME WITH APPROVED CHANGE ORDERS APPROVED BY CONTRACTOR SIGNATURE ARCON CONSTRUCTION CO INC CONTRACTOR CITY ADMINISTRATOR N:101591- 021AdminiConsOUction AdminlChange Orders1159l-02 Change Order ICO-1 9/20/2006 7/31/2007 NONE 7/31/2007 NONE 7/31/2007 5 e .41 r 4 1 fr t'' 4: r CHANGE ORDER NO.1 DETAIL 1 OLD COUNTY ROAD 38 AND 132ND COURT WEST 9/20/2006 STREET AND UTILITY IMPROVEMENTS CITY PROJECT NOS. 387 AND 393 CITY OF ROSEMOUNT, MN WSB PROJECT NOS 1591-02 AND 1556-52 ADDED ITEMS Item No. Mat. No. Description Qty Unit Pnce Extended Amount 216 2504 602 UPSIZE WATERMAIN MANHOLE 2 EACH $4,330 00 $8,660 00 TOTAL ADDED ITEMS CHANGE ORDER NO. 1 $8,660.00 DELETED ITEMS Item I4o. Mat. No. Description Qty Unit Price Extended Amount TOTAL DELETED ITEMS CHANGE ORDER NO. 1 $0.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $8,660.00 Packet page 83 of 207 1001591-021.4dmintConsfruction AdatInIChangeOglers11191-02 Change Onfor1C01 Detail