HomeMy WebLinkAbout6.j. Change Order #2 - Meadows of Bloomfield 1st & 2nd Additions, City Project #351AGENDA ITEM: Change Order #2— Meadows of
Bloomfield 1 2n Additions, City
Project #351
AGENDA SECTION:
Consent
PREPARED BY: Andrew J Brotzler, PE, City Engineer
AGENDA NO.
ATTACHMENTS: Change Order #2; Map
APPROVED BY:
RECOMMENDED ACTION: Motion to approve Change Order #2 for Meadows of
Bloomfield 1 and 2 Street and Utility Improvements, City Project #351.
ROSS: MOUNT
CITY COUNCIL
City Council Meeting November 7, 2006
EXECUTIVE SUMMARY
BACKGROUND:
Attached for Council consideration is Change Order No. 2 for the Meadows of Bloomfield 1" and 2"
Street and Utility Improvements, City Project #351. This change order addresses the following revisions
to the project:
1. Increase in bituminous pavement unit price due to increase in oil price during developer- requested
delay of project schedule.
2. Installation of three valley gutters along 139 Street, including bituminous patching.
The above changes to the project result in a net increase of $40,917.98 for a revised contract amount of
$3,860,762 03 All additional costs will be paid by the developer, Centex Homes
SUMMARY:
Staff recommends Council approval of Change Order No. 2 for the Meadows of Bloomfield 1" and 2
Street and Utility Improvements, City Project #351
Packet page 119 of 177 1 \Engineering Council \November 7, 2006 \CP351 -Change Order2CC11 -7 -06 doe
WSB
Associates, Inc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
State 300
November 1, 2006 Minneapolis, MN 55416
Tel 763 541 -4800
Fax 763- 541 -1700
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 2
Meadows of Bloomfield l and 2 Additions
Street Construction and Appurtenant Work
City of Rosemount Project No. 351
WSB Project No. 1563 -00
Dear Mr. Brotzler:
Please find enclosed Change Order No. 2 (four copies) for the above referenced project. The
change order reflects a net increase to the contract amount of $40,917.98 for a revised contract
total of $3,860,762 03. If the attached meets with your approval, please sign and process.
If you have any questions or comments regarding the enclosed, please contact me at 651 -322-
2724. Thank you.
Sincerely,
WSB Associates, Inc.
•er
u _er
Morga
Projec
Enclosures
cc: Cindy Domiden, City of Rosemount
Ryan Contracting Co.
tsf
Packet page 120 of 177
Minneapolis 1 St. Cloud
Equal Opportunity Employer
0 rnrrRawi,unco, CM/ r.eo..r,eraaae.e
MEADOWS OF BLOOMFIELD 1ST AND 2ND ADDITIONS
STREET CONSTRUCTION AND APPURTENANT WORK
CITY ROSEMOUNT PROJECT NO 351
WSB PROJECT NO. 1563-00
OWNER:
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
INCREASE IN BITUMINOUS PAVEMENT UNIT PRICE TO BE PAID IN ADDITION TO ORIGINAL BID PRICE DUE TO INCREASE IN OIL PRICE.
DEVELOPER (CENTEX) AGREED TO PAY ADDITIONAL COSTS ASSOCIATED WITH THEIR REQUESTED DELAY OF PROJECT SCHEDULE.
EXTRA WORK INSTALLATION OF 3 VALLEY GUTTERS ALONG 139TH STREET INCLUDING BITUMINOUS PATCHING, PRIOR TO
PLACEMENT OF WEARCOURSE PAVING, TO IMPROVE DRAINAGE THROUGH INTERSECTIONS DUE TO FLAT STREET GRADES
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE
PREVIOUS CHANGE ORDERS N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER
NET INCREASE OF THIS CHANGE ORDER
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:
RECOMMENDED BY
APPROVED BY
CITY ENGINEER
DATE OF COUNCIL ACTION
Packet page 121 of 177
CHANGE ORDER NO. 2
3,785,848 40
33,995.65
3,819,844 05
$40.917 98
3,860,762 03
CONTRACTOR:
RYAN CONTRACTING CO.
870013TH AVENUE EAST
SHAKOPEE, MN 55379
CHANGE IN CONTRACT TIME
ORIGINAL CONTRACT TIME
NET CHANGE FROM PREVIOUS CHANGE ORDERS
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE WITH CHANGE ORDER.
CONTRACT TIME WITH APPROV D CHANGEpRDERS
PPROVE
SIGNATURE
RYAN CONTRACTING CO
CONTRACTOR
CITY ADMINISTRATOR
GM1ENGPR0.A35111563d0 Change Order 2Slgnatu e
11/7/2006
10/15/2004
0
10/15/2004
NONE
10/15/2004
MEADOWS OF BLOOMFIELD 1ST AND 2ND ADDITIONS
STREET CONSTRUCTION AND APPURTENANT WORK
CITY ROSEMOUNT PROJECT NO. 351
WSB PROJECT NO 1563 -00
ADDED ITEMS
Item No Mat. No, Description
278 2350 501 TYPE LV 3 WEARING COURSE MIXTURE (C) 1 1863 07 TON $14 50 $24,114 52
279 2531 601 INSTALL VALLEY GUTTER 2 1 LUMP SUM 316,803 48 $16,803 46
TOTAL ADDED ITEMS CHANGE ORDER NO. 2
DELETED ITEMS
Item No. Mat. No. Description
TOTAL DELETED ITEMS CHANGE ORDER NO. 2
Packet page 122 of 177
CHANGE ORDER NO. 2 DETAIL
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT
Note Qty Unit Price Extended Amount
Qty
11/7/2006
$40,917.98
Unit Price Extended Amount
$40,917.98
NOTES: 1 UNIT PRICE TO BE PAID IN ADDITION TO ORIGINAL BID PRICE DUE TO INCREASE IN OIL PRICE AND 12 MONTH DELAY IN PROJECT
COMPLETION DEVELOPER (CENTEX) AGREED TO PAY ADDITIONAL COSTS ASSOCIATED WITH THEIR REQUESTED DELAY
2 EXTRA WORK INSTALLATION OF 3 VALLEY GUTTERS ALONG 139TH STREET INCLUDING BITUMINOUS PATCHING, PRIOR TO
PLACEMENT OF WEARCOURSE PAVING, TO IMPROVE DRAINAGE THROUGH INTERSECTIONS DUE TO FLAT STREET GRADES
o.IENAPROJ165116563 -00 Change Order 2otYa
BIRDSONG ib
CT Q
BIRDSONG PAT 0
O
136TH ST 0
L ff
x
a V re
m
Fa CO
v TRL
MARE
POND 135TH ST W
ROSEMOLUN
I NNE507A
145TH
P LON p
J l
It Al
Q' ei L r E4 PA
Q- �c
H ST W /y> ,Q� mi! BAYBER�?
Qt BAYB RRY TRL CIR'
1
335 670
p v\FIELD p ATy i J cluS r4
(P S� A2A i<
1,340 2,010
2,680
Feet
ParkPt nanP 123 of 177
FILE osnap2/sharel,GIS /Crry/ Maps /Departmental Maps /EngmeeringdChns&MOB 1st -2nd Locate mad
October 2006