Loading...
HomeMy WebLinkAbout6.n. Change Order #1 - Evermoor Glendalough 7th Addition, City Project #401AGENDA ITEM: Change Order #1 Evermoor Glendalough 7 Addition, City Project #401 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Change Order #1, Map APPROVED BY: RECOMMENDED ACTION: Motion to approve Change Order #1 for Evermoor Glendalough 7 Addition Street and Utility Improvements, City Project #401. ROSEMOLIN 1 BACKGROUND: CITY COUNCIL City Council Meeting: November 7, 2006 EXECUTIVE SUMMARY Attached for Council consideration is Change Order No. 1 for the Evermoor Glendalough 7 Addition Street and Utility Improvements, City Project #401 This change order addresses the following revisions to the project: 1. Installation of 4" watermain instead of 1" irrigation service for Outlot B at the request of developer. 2. Installation of 16" riser on storm sewer hft station wet well to better accommodate site grades. The above changes to the project result in a net increase of 4,969 20 for a revised contract amount of $1,824,012.30. All additional costs will be paid by the developer, Lennar SUMMARY: Staff recommends Council approval of Change Order No. 1 for the Evermoor Glendalough 7 Addition Street and Utility Improvements, City Project #401 Packet page 141 of 177 1 \Engmeenng Council \November 7, 2006 \CP401 Change OrderiCC11 -7 -06 doc WSB Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Assonates, Inc Suite 300 November 1, 2006 Minneapolis, MN 55416 Tel 763 -541 -4800 Fax 763 -541 -1700 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 —145' Street West Rosemount, MN 55068 Re: Change Order No. 1 Evennoor's Glcndalough 7 Addition City of Rosemount Project No. 401 WSB Project No. 1556 -63 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 (four copies) for the above- referenced project, The change order reflects a net increase to the contract amount of $4,969.20 for a revised contract total of $1,824,012.30. If the attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, WSB Associates, Inc. Morg Project Enclosures cc: Cindy Dorniden, City of Rosemount A 1 Excavating, Inc. tsf Packet page 142 of 177 Minneapolis 1 St Claud Equal Opportunity Employer O,C40PflQNa1 Lie LT l (T u Mah..10106 /1AL WVERMOOR'S GLENDALOUGH 7TH ADDITION tTREET AND UTILITY CONSTRUCTION ;IT( ROSEMOUNT PROJECT NO. 401 VS8 PROJECT 1556 -63 )WNER :1N OF ROSEMOUNT '575 145TH STREET WEST 2OSEMOUNT, MN 55068 :HANGE IN CONTRACT PRICE: )RIGINAL CONTRACT PRICE' (REVIOUS CHANGE ORDERS WA ONTRACT PRICE PRIOR TO THIS CHANGE ORDER 4ET INCREASE OF THIS CHANGE ORDER :ONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: 2ECOMMENOED BY- 1PPR0VED BY' CITY ENGINEER DATE OF COUNCIL ACTION Packet page 143 of 177 CHANGE ORDER N0. 1 51.819,043 10 50 00 51 819,043 10 54, 960.20 51 824.012 30 CONTRACTOR A -1 EXCAVATING, INC P.O. BOX 90 BLOOMER, WI 54724 'OU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION VSTALL 4^ WATERMAIN INSTEAD OF 1' IRRIGATION SERVICE SHOWN ON PLAN TO OUTLOT B AT THE REQUEST OF THE DEVELOPER (LENNAR) NSTALL 16" RISER ON STORM SEWER LIFT STATION WET WELL TO BETTER ACCOMMODATE SITE GRADES T 15 UNDERSTO00 THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE. OR ORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE CHANGE IN CONTRACT TIME' ORIGINAL CONTRACT TIME' NET CHANGE FROM PREVIOUS CHANGE ORDERS. CONTRACT TIME PRIOR TO THIS CHANGE ORDER NET INCREASE WITH CHANGE ORDER CONTRACT TIME WITH APPROVED CHANGE ORDERS CCNTRACTO SIGNATURE A-1 EXCAVATING, INC CONTRACTOR CITY ADMINISTRATOR 11l7l200 9/1/2006 0 9 .1/2006 NONE 9t172008 EVERM OOR'S GLENDALOUGH 7TH ADDITION STREET AND UTILITY CONSTRUCTION CITY ROSEMOUNT PROJECT NO 401 WSB PROJECT 1556 -63 ADDED ITEMS Item No Mat No. Description Note Qty Unit Price Extended Amount 117 2504 601 WATERMAIN PROVISIONS 1 1 LUMP SUM $3,05020 $3,050 20 118 2506 601 CONSTRUCT LIFT STATION 2 1 LUMP SUM $1,919 00 $1,919.00 TOTAL ADDED ITEMS CHANGE ORDER NO. 2 $4,969.20 DELETED ITEMS Item No Mat No. Description Qty Unit Price Extended Amount TOTAL DELETED ITEMS CHANGE ORDER NO. 2 $0.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $4,969.20 NOTES t EXTRA WORK INSTALL 4" WATERMAIN INSTEAD OF 1" IRRIGATION SERVICE SHOWN ON PLAN TO OUTLOT B AT THE REQUEST OF THE DEVELOPER (LENNAR) 2 EXTRA WORK INSTALL ADDITIONAL 16" RISER ON STORM SEWER LIFT STATION TO BETTER ACCOMMODATE SITE GRADES Packet page 144 of 177 CHANGE ORDER NO. 1 DETAIL 11/7/2006 G:ENGPROJ4011155 &55 Change Order 1Detall CROLLY GGS I N ORO O GS-/ `µN G\ c 1 A z 136Ty ST W 0 0 250 500 c C oUCHTOW K ,fl ICpR�RAC O C FO t f U Q /44pPATH1w 2 COLESHIRE PA "o¢ s C& c� 8I p CR 137TH ST a a a o 0 CC 0 O 0 �VtD UMP 0 CORLISSTRL o Packet page 145 of 177 0 SCHWARZ POND 1,000 1,500 G CHARLSTON WAY k- het C.) p. RRA 1 131ST ST W V 142ND ST W_ 2,000 Feet H U) -J H 140TH ST W TOOTH CIR- -V 3` j c 0 m �Q J 132ND CT 132ND IST BRONZE CT f, CO 0 L. 138TH ST W p uj 138TH ST W Z U. 138TH ST W 139TH ST W m z z w, z o z N z m 7 0 m w w w a 7 0 0 2 CONNEMARA November 2006 FILE 'r snap2/ sharel /GIS /City,Maps,Departmental Maps /Engmeenng /Chas /Glendalough 7th Locate nixed