HomeMy WebLinkAbout6.n. Change Order #1 - Evermoor Glendalough 7th Addition, City Project #401AGENDA ITEM: Change Order #1 Evermoor
Glendalough 7 Addition, City Project
#401
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer
AGENDA NO.
ATTACHMENTS: Change Order #1, Map
APPROVED BY:
RECOMMENDED ACTION: Motion to approve Change Order #1 for Evermoor
Glendalough 7 Addition Street and Utility Improvements, City Project #401.
ROSEMOLIN 1
BACKGROUND:
CITY COUNCIL
City Council Meeting: November 7, 2006
EXECUTIVE SUMMARY
Attached for Council consideration is Change Order No. 1 for the Evermoor Glendalough 7 Addition
Street and Utility Improvements, City Project #401 This change order addresses the following revisions
to the project:
1. Installation of 4" watermain instead of 1" irrigation service for Outlot B at the request of
developer.
2. Installation of 16" riser on storm sewer hft station wet well to better accommodate site grades.
The above changes to the project result in a net increase of 4,969 20 for a revised contract amount of
$1,824,012.30. All additional costs will be paid by the developer, Lennar
SUMMARY:
Staff recommends Council approval of Change Order No. 1 for the Evermoor Glendalough 7 Addition
Street and Utility Improvements, City Project #401
Packet page 141 of 177 1 \Engmeenng Council \November 7, 2006 \CP401 Change OrderiCC11 -7 -06 doc
WSB
Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Assonates, Inc
Suite 300
November 1, 2006 Minneapolis, MN 55416
Tel 763 -541 -4800
Fax 763 -541 -1700
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 —145' Street West
Rosemount, MN 55068
Re: Change Order No. 1
Evennoor's Glcndalough 7 Addition
City of Rosemount Project No. 401
WSB Project No. 1556 -63
Dear Mr. Brotzler:
Please find enclosed Change Order No. 1 (four copies) for the above- referenced project, The
change order reflects a net increase to the contract amount of $4,969.20 for a revised contract
total of $1,824,012.30. If the attached meets with your approval, please sign and process.
If you have any questions or comments regarding the enclosed, please contact me at 651 -322-
2724. Thank you.
Sincerely,
WSB Associates, Inc.
Morg
Project
Enclosures
cc: Cindy Dorniden, City of Rosemount
A 1 Excavating, Inc.
tsf
Packet page 142 of 177
Minneapolis 1 St Claud
Equal Opportunity Employer
O,C40PflQNa1 Lie LT l (T u Mah..10106 /1AL
WVERMOOR'S GLENDALOUGH 7TH ADDITION
tTREET AND UTILITY CONSTRUCTION
;IT( ROSEMOUNT PROJECT NO. 401
VS8 PROJECT 1556 -63
)WNER
:1N OF ROSEMOUNT
'575 145TH STREET WEST
2OSEMOUNT, MN 55068
:HANGE IN CONTRACT PRICE:
)RIGINAL CONTRACT PRICE'
(REVIOUS CHANGE ORDERS WA
ONTRACT PRICE PRIOR TO THIS CHANGE ORDER
4ET INCREASE OF THIS CHANGE ORDER
:ONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS:
2ECOMMENOED BY-
1PPR0VED BY'
CITY ENGINEER
DATE OF COUNCIL ACTION
Packet page 143 of 177
CHANGE ORDER N0. 1
51.819,043 10
50 00
51 819,043 10
54, 960.20
51 824.012 30
CONTRACTOR
A -1 EXCAVATING, INC
P.O. BOX 90
BLOOMER, WI 54724
'OU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
VSTALL 4^ WATERMAIN INSTEAD OF 1' IRRIGATION SERVICE SHOWN ON PLAN TO OUTLOT B AT THE REQUEST OF THE DEVELOPER (LENNAR)
NSTALL 16" RISER ON STORM SEWER LIFT STATION WET WELL TO BETTER ACCOMMODATE SITE GRADES
T 15 UNDERSTO00 THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE. OR
ORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE
CHANGE IN CONTRACT TIME'
ORIGINAL CONTRACT TIME'
NET CHANGE FROM PREVIOUS CHANGE ORDERS.
CONTRACT TIME PRIOR TO THIS CHANGE ORDER
NET INCREASE WITH CHANGE ORDER
CONTRACT TIME WITH APPROVED CHANGE ORDERS
CCNTRACTO SIGNATURE
A-1 EXCAVATING, INC
CONTRACTOR
CITY ADMINISTRATOR
11l7l200
9/1/2006
0
9 .1/2006
NONE
9t172008
EVERM OOR'S GLENDALOUGH 7TH ADDITION
STREET AND UTILITY CONSTRUCTION
CITY ROSEMOUNT PROJECT NO 401
WSB PROJECT 1556 -63
ADDED ITEMS
Item No Mat No. Description Note Qty Unit Price Extended Amount
117 2504 601 WATERMAIN PROVISIONS 1 1 LUMP SUM $3,05020 $3,050 20
118 2506 601 CONSTRUCT LIFT STATION 2 1 LUMP SUM $1,919 00 $1,919.00
TOTAL ADDED ITEMS CHANGE ORDER NO. 2 $4,969.20
DELETED ITEMS
Item No Mat No. Description Qty Unit Price Extended Amount
TOTAL DELETED ITEMS CHANGE ORDER NO. 2 $0.00
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $4,969.20
NOTES t EXTRA WORK INSTALL 4" WATERMAIN INSTEAD OF 1" IRRIGATION SERVICE SHOWN ON PLAN TO OUTLOT B AT THE
REQUEST OF THE DEVELOPER (LENNAR)
2 EXTRA WORK INSTALL ADDITIONAL 16" RISER ON STORM SEWER LIFT STATION TO BETTER ACCOMMODATE SITE
GRADES
Packet page 144 of 177
CHANGE ORDER NO. 1 DETAIL
11/7/2006
G:ENGPROJ4011155 &55 Change Order 1Detall
CROLLY
GGS
I N ORO O GS-/ `µN
G\ c
1
A z 136Ty ST W 0
0 250 500
c
C oUCHTOW K ,fl ICpR�RAC O
C FO t f
U
Q
/44pPATH1w 2 COLESHIRE PA "o¢
s C& c� 8I
p
CR 137TH ST a a a o
0
CC 0
O 0
�VtD UMP 0 CORLISSTRL o
Packet page 145 of 177
0
SCHWARZ
POND
1,000 1,500
G
CHARLSTON WAY
k- het
C.) p. RRA
1
131ST ST W
V
142ND ST W_
2,000
Feet
H
U)
-J
H
140TH ST W
TOOTH CIR- -V
3`
j c 0
m �Q J
132ND CT
132ND IST
BRONZE
CT f,
CO
0
L. 138TH ST W
p uj
138TH ST W
Z
U. 138TH ST W
139TH ST W
m
z
z w,
z
o z
N
z
m 7
0
m
w w w
a
7
0
0
2
CONNEMARA
November 2006
FILE 'r snap2/ sharel /GIS /City,Maps,Departmental Maps /Engmeenng /Chas /Glendalough 7th Locate nixed