Loading...
HomeMy WebLinkAbout6.o. Change Order #1 - Crosscroft 3rd Addition, City Project #403AGENDA ITEM: Change Order #1 Crosscroft 3 Addition, City Project #403 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. ATTACHMENTS: Change Order #1, Map APPROVED BY: RECOMMENDED ACTION: Motion to approve Change Order #1 for Crosscroft 3` Addition Street and Utility Improvements, City Project #403 4ROSEMOUNT City Council Meeting November 7, 2006 BACKGROUND: CITY COUNCIL 1. Shortened 8" dip to Connemara right -of -way 2. Remove of 24' 15" RCP and rebuild manhole. 3. Remove 15" irrigation standpipe by water tower. EXECUTIVE SUMMARY Attached for Council consideration is Change Order No 1 for the Crosscroft 3' Addition Street and Utihty Improvements, City Project #403 This change order addresses the following revisions to the project The above changes to the project result m a net increase of $4,426.48 for a revised contract amount of $782,108 67 All additional costs will be paid by the developer, D R. Horton SUMMARY: Staff recommends Council approval of Change Order No. 1 for the Crosscroft 3rd Addition Street and Utility Improvements, City Project #403 Packet page 146 of 177 1 \Engmeenng Cound \November 7, 7006 \CP403.Cbange OrdertCC11 -7 -06 doc A WSB 9ssocmtes. Inc November 1, 2006 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 1 Evermoor's Crosscroft 3 Addition City of Rosemount Project No. 403 WSB Project No. 1556 -71 Dear Mr. Brotzler: Please find enclosed Change Order No. 1 (four copies) for the above- referenced project. The change order reflects a net increase to the contract amount of $4,426.48 for a revised contract total of $782,108.67. If the attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, FVSB Associates, Inc. Morgan Project Enclosures cc: Cindy Domiden, City of Rosemount Ryan Contracting Co. tsf Packet page 147 of 177 Infrastructure 1 Engineering 1 Planning 1 Construction Minneapolis 1 St Cloud Equal Opportunity Employer 701 Xenia Avenue South Suite 300 Mmneaoohs, MN 55416 Tel. 763- 541 -4800 Fax 763 -541 -1700 GOCAMOtaenen(n r cn-o twetkr I11. day EVERMOOR'S CROSSCROFT 3RD ADDITION STREET AND BRIDGE CONSTRUCTION CITY ROSEMOUNT PROJECT NO. 403 WSB PROJECT NO. 1556-71 OWNER: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55068 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION. EXTRA WORK SHORTENED 8" DIP TO CONNEMARA ROW, REMOVE 24' 15" RCP AND REBUILD MH, REMOVE 1 5" IRRIGATION STANDPIPE BY WATERTOWER ALL WORK AT REQUEST OF DEVELOPER. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE. ORIGINAL CONTRACT PRICE PREVIOUS CHANGE ORDERS: N/A CONTRACT PRICE PRIOR TO THIS CHANGE ORDER: NET INCREASE OF THIS CHANGE ORDER CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS. RECOMMENDED BY APPROVED BY MORG• DA EY, PE, PRO a MANAGER WSB ASSOCIATES, C ENGINEER CITY ENGINEER DATE OF COUNCIL ACTION Packet page 148 of 177 CHANGE ORDER NO. 1 CONTRACTOR: RYAN CONTRACTING CO 8700 13TH AVENUE EAST SHAKOPEE, MN 55379 CHANGE IN CONTRACT TIME 777,682.19 ORIGINAL CONTRACT TIME: NET CHANGE FROM PREVIOUS CHANGE ORDERS; 777,682 19 CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 4,42648 NET INCREASE WITH CHANGE ORDER 782,108 67 CONTRACT TIME WITH APPROyFnANGE ORDERS tv,4 BY. CCdNTRACTDR SIGNATURE RYAN CONTRACTING CO CONTRACTOR CITY ADMINISTRATOR fkIENOPRO.AM311536.71 Change Order 1 Slgnatun 11/7/2006 7/15/2006 0 7(15 /2006 NONE 7/15/2006 EVERMOOR'S CROSS CROFT 3RD ADDITION STREET AND BRIDGE CONSTRUCTION CITY ROSEMOUNT PROJECT NO. 403 WSB PROJECT NO. 1556.71 ADDED ITEMS Item No Mat No, Description Note Qty Unit Price Extended Amount 108 2540 801 RELOCATE MISCELLANEOUS STRUCTURES 1 1 LUMP SUM $4,426 48 $4,426 48 TOTAL ADDED ITEMS CHANGE ORDER NO. 2 $4,426.48 DELETED ITEMS Item No. Mat. No. Description Qty Unit Price Extended Amount TOTAL DELETED ITEMS CHANGE ORDER NO. 2 $0.00 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $4,426.48 NOTES 1 EXTRA WORK SHORTENED 8" DIP TO CONNEMARA ROW, REMOVE 24' 15" RCP AND REBUILD MH, REMOVE 1 5' IRRIGATION STANDPIPE BY WATERTOW ER ALL WORK AT REQUEST OF DEVELOPER Packet page 149 of 177 CHANGE ORDER NO. 1 DETAIL 1117/2008 0 IENGPROJ4O3155G71 Change Order Wean T a �a C *ET usy N 133RD CT W !la \o D d t Q CROSSRIDGE WAY TRL_ CROSSLOU O DELLWOOD P 7 441ST CT W 0 260 520 Parkat nano 150 of 177 ice r 11197- O U COPPER POND 1,040 ir Z z I- 0 ILI to j 0 U Q U3 K fJ �rn CROCU� v 9,p i et N8 at, G 1,560 2,080 Feet ROSEMOUNT MINNESOTA I E ✓j� CR e s COR MpCK C1R COU HTO '0 ARC' s) -0 l q T N c7 13 S SA- z R O PATH a o COLE AO CtL o o pMWE C 1 37TH 5 T. 'SCHWAF POND October 2006 FILE_ esnap2/sharel/GIS /Qty /Maps Depart mental MapslEnglneenng /Chas 2nd Locate mad