HomeMy WebLinkAbout6.o. Change Order #1 - Crosscroft 3rd Addition, City Project #403AGENDA ITEM: Change Order #1 Crosscroft 3
Addition, City Project #403
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer
AGENDA NO.
ATTACHMENTS: Change Order #1, Map
APPROVED BY:
RECOMMENDED ACTION: Motion to approve Change Order #1 for Crosscroft 3`
Addition Street and Utility Improvements, City Project #403
4ROSEMOUNT
City Council Meeting November 7, 2006
BACKGROUND:
CITY COUNCIL
1. Shortened 8" dip to Connemara right -of -way
2. Remove of 24' 15" RCP and rebuild manhole.
3. Remove 15" irrigation standpipe by water tower.
EXECUTIVE SUMMARY
Attached for Council consideration is Change Order No 1 for the Crosscroft 3' Addition Street and
Utihty Improvements, City Project #403 This change order addresses the following revisions to the
project
The above changes to the project result m a net increase of $4,426.48 for a revised contract amount of
$782,108 67 All additional costs will be paid by the developer, D R. Horton
SUMMARY:
Staff recommends Council approval of Change Order No. 1 for the Crosscroft 3rd Addition Street and
Utility Improvements, City Project #403
Packet page 146 of 177 1 \Engmeenng Cound \November 7, 7006 \CP403.Cbange OrdertCC11 -7 -06 doc
A
WSB
9ssocmtes. Inc
November 1, 2006
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 1
Evermoor's Crosscroft 3 Addition
City of Rosemount Project No. 403
WSB Project No. 1556 -71
Dear Mr. Brotzler:
Please find enclosed Change Order No. 1 (four copies) for the above- referenced project. The
change order reflects a net increase to the contract amount of $4,426.48 for a revised contract
total of $782,108.67. If the attached meets with your approval, please sign and process.
If you have any questions or comments regarding the enclosed, please contact me at 651 -322-
2724. Thank you.
Sincerely,
FVSB Associates, Inc.
Morgan
Project
Enclosures
cc: Cindy Domiden, City of Rosemount
Ryan Contracting Co.
tsf
Packet page 147 of 177
Infrastructure 1 Engineering 1 Planning 1 Construction
Minneapolis 1 St Cloud
Equal Opportunity Employer
701 Xenia Avenue South
Suite 300
Mmneaoohs, MN 55416
Tel. 763- 541 -4800
Fax 763 -541 -1700
GOCAMOtaenen(n r cn-o twetkr I11. day
EVERMOOR'S CROSSCROFT 3RD ADDITION
STREET AND BRIDGE CONSTRUCTION
CITY ROSEMOUNT PROJECT NO. 403
WSB PROJECT NO. 1556-71
OWNER:
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55068
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION.
EXTRA WORK SHORTENED 8" DIP TO CONNEMARA ROW, REMOVE 24' 15" RCP AND REBUILD MH, REMOVE 1 5" IRRIGATION
STANDPIPE BY WATERTOWER ALL WORK AT REQUEST OF DEVELOPER.
IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR
FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE.
CHANGE IN CONTRACT PRICE.
ORIGINAL CONTRACT PRICE
PREVIOUS CHANGE ORDERS: N/A
CONTRACT PRICE PRIOR TO THIS CHANGE ORDER:
NET INCREASE OF THIS CHANGE ORDER
CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS.
RECOMMENDED BY
APPROVED BY
MORG• DA EY, PE, PRO a MANAGER
WSB
ASSOCIATES, C
ENGINEER
CITY ENGINEER
DATE OF COUNCIL ACTION
Packet page 148 of 177
CHANGE ORDER NO. 1
CONTRACTOR:
RYAN CONTRACTING CO
8700 13TH AVENUE EAST
SHAKOPEE, MN 55379
CHANGE IN CONTRACT TIME
777,682.19 ORIGINAL CONTRACT TIME:
NET CHANGE FROM PREVIOUS CHANGE ORDERS;
777,682 19 CONTRACT TIME PRIOR TO THIS CHANGE ORDER:
4,42648 NET INCREASE WITH CHANGE ORDER
782,108 67 CONTRACT TIME WITH APPROyFnANGE ORDERS
tv,4 BY.
CCdNTRACTDR SIGNATURE
RYAN CONTRACTING CO
CONTRACTOR
CITY ADMINISTRATOR
fkIENOPRO.AM311536.71 Change Order 1 Slgnatun
11/7/2006
7/15/2006
0
7(15 /2006
NONE
7/15/2006
EVERMOOR'S CROSS CROFT 3RD ADDITION
STREET AND BRIDGE CONSTRUCTION
CITY ROSEMOUNT PROJECT NO. 403
WSB PROJECT NO. 1556.71
ADDED ITEMS
Item No Mat No, Description Note Qty Unit Price Extended Amount
108 2540 801 RELOCATE MISCELLANEOUS STRUCTURES 1 1 LUMP SUM $4,426 48 $4,426 48
TOTAL ADDED ITEMS CHANGE ORDER NO. 2 $4,426.48
DELETED ITEMS
Item No. Mat. No. Description Qty Unit Price Extended Amount
TOTAL DELETED ITEMS CHANGE ORDER NO. 2 $0.00
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $4,426.48
NOTES 1 EXTRA WORK SHORTENED 8" DIP TO CONNEMARA ROW, REMOVE 24' 15" RCP AND REBUILD MH, REMOVE 1 5' IRRIGATION
STANDPIPE BY WATERTOW ER ALL WORK AT REQUEST OF DEVELOPER
Packet page 149 of 177
CHANGE ORDER NO. 1 DETAIL
1117/2008
0 IENGPROJ4O3155G71 Change Order Wean
T
a �a C *ET usy N
133RD CT W
!la
\o
D d t Q CROSSRIDGE
WAY
TRL_
CROSSLOU
O
DELLWOOD
P
7 441ST
CT W
0 260 520
Parkat nano 150 of 177
ice r
11197-
O
U
COPPER POND
1,040
ir Z z I- 0 ILI
to j 0 U Q
U3
K
fJ
�rn
CROCU�
v 9,p i et N8
at, G
1,560 2,080
Feet
ROSEMOUNT
MINNESOTA
I
E ✓j�
CR
e s
COR MpCK
C1R
COU HTO
'0
ARC'
s)
-0 l
q T N
c7
13
S SA- z
R O PATH a o COLE
AO
CtL o o
pMWE
C 1 37TH 5 T.
'SCHWAF
POND
October 2006
FILE_ esnap2/sharel/GIS /Qty /Maps Depart mental MapslEnglneenng /Chas 2nd Locate mad