Loading...
HomeMy WebLinkAbout6.r. Final Payment #4, 2006 Pedestrian Facilities Improvements, City Project #400AGENDA ITEM: Final Payment #4, 2006 Pedestrian Facilities improvements, City Project #400 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Enginee AGENDA NO. 15•r ATTACHMENTS: Payment Voucher; Map APPROVED BY: RECOMMENDED ACTION: Motion to Approve Payment #4 and Final for the 2 06 Pedestrian Facilities Improvements, City Project #400, to Concrete Idea, Inc. and Accepting it for Perpetual Maintenance. 4 ROSEMOUNT City Council Meeting: December 19, 2006 BACKGROUND: SUMMARY: CITY COUNCIL EXECUTIVE SUMMARY This item is on the agenda to request Payment #4 and Final to Concrete Idea, Inc. for the 2006 Pedestrian Facilities Improvements, City Project #400 This project included the replacement of existing bituminous trails with concrete sidewalk along portions of the east side of Shannon Parkway, and along portions of 153' Street West and 155`" Street West, the construction of new bituminous trails along poruons of the west side of Shannon Parkway; and the construction of new concrete sidewalks along a portion of the east side of Claret Avenue. The final construction amount of $250,812.82 is 12.3% below the contract amount of $286,070.50. Staff recommends that Council approve Payment #4 and final for the project and accept the project for perpetual maintenance subject to the following condmons. 1. Satisfactorily showing that the contractor has comphed with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence m the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. G: \ENGPROJ \400 \Final PaymentCC12- 19- 06.doc A WSB Associates. Inc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 November 27, 2006 Minneapolis, MN 55416 Tel 763 541 -4800 Honorable Mayor and City Council Fax.763- 541 -1700 City of Rosemount 2875 —145` Street West Rosemount, MN 55068 Attn. Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 4 (Final) 2006 Pedestrian Facilities Improvements City of Rosemount Project No. 400 WSB Project No. 1556 -56 Dear Mayor and Council Members: Please find enclosed the final Construction Pay Voucher No. 4 (Final) for the above referenced project in the amount of $17,102.67. We recommend final payment subject to receipt of the following items: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. Please make payment in this amount to Concrete Idea, Inc. at your earliest convenience. Sincerely, WSB Associates, Inc. Kevin B Kawlewski, PE Senior Project Manager Enclosures cc: Concrete Idea, Inc tsf Minneapolis St Cloud Equal Opportunity Employer K N/3345614JmmlCoamankonAMwICTR M I FNLQY- hmm112706Jac Project Summary 1 Original Contract Amount $286,070 50 2 Contract Changes Addition $0 00 3 Contract Changes Deduction $0 00 4 Revised Contract Amount $286,070 50 5 Value Completed to Date $250,812 82 6 Material on Hand $0 00 7 Amount Earned $250,812 82 8 Less Retainage $0 00 9 Subtotal $250,812.82 10 Less Amount Paid Previously $233,710 15 11 Liquidated Damages $0 00 12 AMOUNT DUE THIS PAY VOUCHER NO 4 FINAL $17,102 67 01556 56 Pay Voucher 4 I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER Recommended for Approval by; WSB s In Approved by Contractor: Concrete Idea, I y r -4% Specified Contract Completion Date: 7/20/2006 Comment: Q SL..i� A.v ociaies, Gw. F Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 11/112006 to 11/30/2006 Contractor Concrete Idea, Inc. 13961 44th Lane NE St. Michael, MN 55376 Pay Voucher RSMT 2006 Trail Sidewalk Improvements Client Contract No Project No 01556 -56 Client Project No 400 Construction Observer: Request No.: 4 FINAL Approved by Owner Date: Monday, November 27, 2006 Date: 1112712006 1 of 7 MHU LN Z,ObCbE DROMCLIFFE D� uF CT nm 2' 7 CROW( L1 I! RM DOaq nroi- jnn,str e W 157THSTyI 160TH ST W (CSAH 46) L _l 153RD 5T W a 1 '9w y _f 154TH ST XSTW 2 y G z 4. _(.0( g GORHELL TRL a `CT s CHARLSTON WAY G M I =J I t31STAT W r l J I 1 13 CT W 1( f/ t3PNOI MI _ym T p m oa Duos ce C �I e. L SLNNNPI Potl Schwa Po r Z- -'O Pond L 4 CO'ial eWA S CRO r G �(1 4 WooOS ARNp STW 1 i W 0�� I Pvh F I psT C :;1a9PUSi�1' 143RDSTW ,.3.5.at=1A eM oRANT 1 4TN w 1 4 ENT C {{t 15 OSTW �r3p f� r BOSTON BOISE 3 1 1 1 5.3. ,<dYB l s*T Feet 0 625 1,250 2,500 3,750 5,000 TGIS /Gty /Maps/Deparlmental Maps /Engmeenng'Chds/Tra l- Sidewalk Locate December 2006