HomeMy WebLinkAbout6.i. Final Payment #13, Meadows of Bloomfield 3rd Street and Utility Improvements, City Project #380AGENDA ITEM: Final Payment #13, Meadows of Bloomfield 3rd Street and Utility Improvements, City Project #380 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer AGENDA NO. b, 1. ATTACHMENTS: Payment Voucher; Map APPROVED BY: RECOMMENDED ACTION: Motion to Approve Payment #13 and Final for the eadows of Bloomfield 1 and 2 Street and Utility Improvements, City Project #380, to Northdale Construction and Accepting it for Perpetual Maintenance. 'C ROSEMOUNT CITY COUNCIL City Council Meeting: January 2, 2007 EXECUTIVE SUMMARY BACKGROUND: This item is on the agenda to request Payment #13 and Final to Northdale Construction for the Meadows of Bloomfield 3r Addition, City Project #380. This project included the construction of streets, sanitary sewer, water main, storm sewer and sidewalks within the Meadows of Bloomfield 3ā€œ' Addition The final construction amount of $1,653,766.97 is 6.6% below the contract amount of $1,769,759.69. SUMMARY: Staff recommends that Council approve Payment #13 and final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. Gā€¢ \ENGPROJ \380 \Final PavmentCC01 -02 -07 doc Project Summa 1 Original Contract Amount $1,580,315 68 2 Contract Changes Addition $189,444 01 3 Contract Changes Deduction $0 00 4 Revised Contract Amount $1,769,759 69 5 Value Completed to Date $1,653,766.97 6 Material on Hand $0.00 7 Amount Earned $1,653,766.97 8 Less Retainage $0.00 9 Subtotal $1,653,766 97 10 Less Amount Paid Previously $1,631,800 17 11 Liquidated Damages $0 00 12 AMOUNT DUE THIS PAY VOUCHER NO 13 FINAL $21,966 80 01556 -31 Pay Voucher 13 Recommended for Approval by WSB Associates, Inc. Approved by Contractor Comment WSB Associates, Inc. Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 11/30/2006 to 12/15/2006 Contractor: Northdale Construction, Inc. 14450 Northdale Blvd. Rogers, MN 55374 Pay Voucher RSMT Meadows of Bloomfield 3rd Addition Client Contract No Project No 01556 -31 Client Project No I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER Approved by Owner: Northdale Construction, Inc. City of Rosemount Specified Contract Completion Date Date 6/30/2006 Construction Observer. Monday, December 18, 2006 Date: 12/18/2006 Request No.: 13 FINAL 1 of 6 s WSB Assoclntes, Inc December 18, 2006 Infrastructure 1 Engineering 1 Planning 1 Construction Honorable Mayor and City Council City of Rosemount 2875 ā€”145` Street West Rosemount, MN 55068 Attn: Cindy Domiden, City of Rosemount Re: Construction Pay Voucher No. 13 (Final) Meadows Bloomfield 3 Addition Street and Utility Construction City of Rosemount Project No. 380 WSB Project No. 1556 -31 Dear Mayor and Council Members: Please find enclosed the final Construction Pay Voucher No. 13 (Final) for the above- referenced project in the amount of $21,966.80. We recommend final payment subject to receipt of the following items: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. Please make payment in this amount to Northdale Construction, Inc. at your earliest convenience. Sincerely, WSB Associates, Inc. Morgan Project Engineer Enclosures cc: Andy Brotzler, City of Rosemount Northdale Construction, Inc. tsf Minneapolis 1 St Cloud Equal Opportunity Employer 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel 763 541 -4800 Fax 763 -541 -1700 A 10656J AtIqun Cuumniw IMnn L]R 10 13 /4L (fl k,,wr/2 /S 6 d,o Meadows of Bloomfield 3rd i 4 ROSEMOUNT MINNESOTA BAYBERRY TR C1R BIRDSONG CT n BIRDSONG PAT .MONT :T RCH F LMONT T/? :AST :H ST W I Xl L 0 337 5 675 w 0 O 0 x U cc 1,350 V Q m CON MARE PO 2,025 2,700 Feet MARE POND HSTW 0 0 z co Lu 0:C 0 Iā€” o re U AY 145TH December 2006 T /GIS/Cily/Maps /Departmental MapslEngineeringfChns /MOB 3rd Locate mxd