Loading...
HomeMy WebLinkAbout2.c. AH 42/Shannon Parkway Intersection Improvements, City project #412AGENDA ITEM: CSAH 42 /Shannon Parkway Intersection Improvements, City Project #412 AGENDA SECTION: J i IO kl PREPARED BY: Andrew J. Brotzler, PE, City Engineer A J AGENDA NO. 2.C. ATTACHMENTS: Preliminary Layout, Cost Estimate APPROVED BY: RECOMMENDED ACTION: Discussion 4 ROSEMOUNT CITY COUNCIL City Council Work Session: January 10, 2007 BACKGROUND EXECUTIVE SUMMARY In 2006, Council discussed on several occasions the CSAH 42 /Shannon Parkway mtersecnon and issues at this intersection. The two issues at this mtersection are 1) the offset m the driving lanes on Shannon Parkway that creates a challenge for left turning and through traffic; and 2) the cross- section of CSAH 42 when traveling north and south on Shannon Parkway. As an mtenm measure to address the cross section of CSAH 42, "Slow Bump Ahead" advisory signs were installed on northbound and southbound Shannon Parkway. In addition, Council authorized the preparation of preliminary plans to evaluate permanent solutions to the above two issues and to develop a cost estimate for the necessary improvements. At this time, a prehrnmary layout has been developed for the intersection and is attached. As shown on the attached layout, the following improvements are proposed: Add raised concrete median and widen Shannon Parkway north of CSAH 42. Mill and overlay CSAH 42 and modify the raised concrete medians on CSAH 42 to flatten the profile on Shannon Parkway through the intersection of CSAH 42. Install new signal system with protective /permissive left turn phasing for Shannon Parkway, similar to the recent revisions to the signal system at CSAH 42 and Chippendale Avenue. This proposal will need to be approved by Dakota County A cost estimate and proposed funding spht with Dakota County has also been developed and is attached. Dakota County staff has indicated that the County has funding available for this project in 2007 and will begin the preparation of a joint powers agreement upon City authorization. The City's share of the estimated project costs is eligible for municipal state aid (MSA) funds. Due to past MSA funding commitments for the TH 3 /Connemara Trail /McAndrews Road Signal System project and the Connemara Trail Overpass project, for the project to move forward in 2007, Street CIP Reserve Funds would need to be used to upfront the cost. As MSA funds become available in 2008, those future funds can be collected for this project. G \ENGPROJ\ 412 \42- ShannonInmrsecaonC W S1 -10 -07 doc SUMMARY Pending Council direction, Staff will plan to include this item on the January 16, 2006 City Council meeting agenda for Council consideration to authorize the preparation of plans and specifications and Dakota County preparation of a joint powers agreement. 2 CRY PROJECT NO 412 SHEET OF 1 SHEETS a=, 13400 C.S.A.H. NO.42 9, i ,�0., KWAY a 2 a Si 1 17.00 4 m WSB o ,-o, 150TH STREETISHAANON PARKWAY INTERSECTION IMPROVEMENTS ..^.oar,. r ..o ^'°'a 'v. a ,..,..G a —P. ROSEMOUNT, MINNESOTA o Opinion of Probable Cost 145B Project SHANNON PARKA \Y CSAH 42 PRELIMINARY DESIGN Design By 1PK Project LOLLING,, ROSEMOUNT, MN Chec/edBy C11r'Pr q/ect No 412 WSB Protect No 1556 -84 Date 01/04/2007 Item No MN/ DOT Specification Na Dean ipion Unit Estimated Total Quantity Estimated Um Price Estnnated Total Cost A. IMPROVEMENTS 1 23215011MOBILIZATICN LUMP SUMS LIN FT 1 $6,50000 $6,50000 2 1 2104501 CURB AND GUTTER 650 $3 50 52,275 00 3 2104 501 REMOVE SEWER PIPE (STORM) LIN FT 8 $1500, $120 00 4 2104 503 REMOVE CONCRETE SIDEWALK SQ FT 75 $1001 57500 5 2104 503 REMOVE CONCRETE MEDIAN SO YD 165 $10001 $1,650 CO 6 2104 505 REMOVE B ITUVI NODS PAVEIAENT SO YD 175 $2 00 $350 00 7 2104 513 SAWING BITU4dINCJS PAVEMENT (FULL DEPTH) LIN FT 1 000 $3 50 $3,500 00 8 2104 601 REMOVE SIGNAL SYSTEM LUMP SUM 1 $25,00000 525,000 CO 9 2105 522 SELECT GRANULAR BORROW (CV) CU YD 20 $950 $19000 10 2211 501 AGGREGATE BASE CLASS 5 (100% CRUSHED) TON 160 $1300 $2,080 CO 1 2232 604 MILL BITUMINOUS PAVEMENT (SPECIAL) SO YD 1950 $300 $5 650 00 1 12 2331 609 LEVELING COURSE MIXTU RE TON 150 $58 00 $870000 13 2350 501 TYvE RV 3 WEARING COURSE W IXTURE (0) TON 315 $55 00 $17 325 00 14 2350 502 TYPE UV 3 NON WEARING COURSE MIXTURE (B) TON 305 $47 00 514,33500 15 2357 502 BITUMINOUS MATERIAL FOR TACK COAT GAL 350 5200 570000 i6 250:511 15" RC PIPE SEINER DESIGN 3006 CLASS V LIN FT 16 $65 00 $1,04000 17 2506 502 CONSTRUCT DRAINAGE S RJCTURE DES SPECIAL (2' X3' CB) EACH 1 51,200 00 $1,20000 19 2506 522 ADJUST FRAME 8 RING CASTING (MANHOLE) EACH 1 $325 00 $325 00 19 2506 602 ADJUST FRAME RING CASTING (CATCH BASIN) EACH 3 $40000 $1,20000 20 2521 501 4" CONCRETE SIDEWALK 5Q FT 50 5450 $225 00 21 2521 602 TRUNCATED DOME PEDESTRIAN RAMP EACH 1 $450 00 $450 00 22 2531 501 CONCRETE CURB 3 GUTTER DESIGN B618 LIN FT 940 $13 00 $1222000 23 24 2531 511 CONCRETE MEDIAN SO YD 200 $23 00 $4,60000 2563 601 TRAFFIC CONTROL LUMP SUM 1 $5 000 00 $5,00000 25 L 2565 511 FULL ACT TRAFFIC CONTROL SIGNAL SYSTEM SYSTEM 1 $200,000 00 $200000 00 26 25 505 SODDING TYPE LAWN (INCL TOPSOIL 8 FERTILIZER) SQ YD 210 56 D0 $1,260 00 Subtotal $316,170 00 10% Contingencies S31 620 00 Subtotal 5347,790 00 +30% Indirect Cost S104,340 00 Total S452,100 00 Cost Estimate Shannon Parkway/ CSAl742 Imp, nremenh Cult Project No 412 Rosemount, MN WSB Ao/ect No 7556 -34 C t0ocunte01sbnd Settrngsla)DYOcaI Settings %Temporary Intemer Files \OLKEIOprnion of Probable Costs JPK (3)