HomeMy WebLinkAbout9.c. Authorize Preparation of Plans & Spec's 42/Shannon Parkway Intersection Improvements, City Project #412AGENDA ITEM: Authorize Preparation of Plans Spec's
42 /Shannon Parkway Intersection
Improvements, City Project #412
AGENDA SECTION:
New Business
PREPARED BY: Andrew J. Brotzler, PE, City Engineer
AGENDA NO. 6j,(
ATTACHMENTS: Preliminary Layout; Cost Estimate;
Resolution
APPROVED BY: /y
7J
RECOMMENDED ACTION: Motion to Adopt a Resolution Ordering Plans and
Specifications for 42 /Shannon Parkway Intersection Improvements, City Project #412.
�C ROSEMOUNT
CITY COUNCIL
City Council Meeting: January 16, 2007
EXECUTIVE SUMMARY
BACKGROUND:
In 2006, Council discussed on several occasions the CSAH 42 /Shannon Parkway intersection and issues at
this intersection. The two issues at this intersection are 1) the offset m the driving lanes on Shannon
Parkway that creates a challenge for left turning and through traffic, and 2) the cross section of CSAH 42
when traveling north and south on Shannon Parkway.
As an interim measure to address the cross section of CSAH 42, "Slow Bump Ahead" advisory signs
were installed on northbound and southbound Shannon Parkway. In addition, Council authorized the
preparation of preliminary plans to evaluate permanent solutions to the above two issues and to develop a
cost estimate for the necessary improvements.
At this time, a preliminary layout has been developed for the intersection and is attached. As shown on
the attached layout, the following improvements are proposed:
Add raised concrete median and widen Shannon Parkway north of CSAH 42.
Mill and overlay CSAH 42 and modify the raised concrete medians on CSAH 42 to flatten the
profile on Shannon Parkway through the intersection of CSAH 42.
Install new signal system with protective /permissive left tum phasing for Shannon Parkway,
similar to the recent revisions to the signal system at CSAH 42 and Chippendale Avenue This
proposal will need to be approved by Dakota County.
A cost estimate and proposed funding split with Dakota County has also been developed and is attached.
Dakota County staff has indicated that the County has funding available for this project m 2007 and will
begin the preparation of a joint powers agreement upon City authonzanon. The City's share of the
estimated project costs is ehgible for municipal state aid CMSA) funds. Due to past MSA funding
commitments for the TH 3 /Connemara Trail /McAndrews Road Signal System project and the
Connemara Trail Overpass project, for the project to move forward in 2007, Street CIP Reserve Funds
would need to be used to upfront the cost. As MSA funds become available m 2008, those future funds
can be collected for this project.
G \ENGPROJ \412 \O dPISpcCC1 -16 -07 doc
Opinion of Probable Cost
11S3 Project SHANNON PARKW sill CSAH 42 PRELIMINARY DESIGN Design By JPK
Pi oject Locution ROSEMOUNT, MN Checked By
Cety Pi oleo' No 412
PVSB Piojecl No ]556 -54 Dale 01/04/2007
Item
No
MN /DOT
Specification
No
Description
Unit
Estimated
Total
Quantity
Estimated
Unit Price
Estimated
Total Cost
A. IMPROVEMENTS
1 2021 501
MOBILIZATION
LUMP SUM 1
36500 00
$6,500 -00
2 2104 501
REMOVE CURB AND GUTTER
LIN FT 650
$350
$2,275 00
3
2104 501
REMOVE SEWER PIPE (STORM)
LIN FT
B
$15 DD
$120 DC
4
2104 503
REMOVE CONCRETE SIDEWALK
SQ FT
75
$1 00
$75 0D
5
2104 503
REMOVE CONCRETE MEDIAN
SO YD
165
$10 DO
$1,65900
6
2104 505
REMOVE BITUMINOUS PAVEMENT
SO VD
175
$2 00
$350 09
7
2104 513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
1,000
$3 5D
$3,50000
8
2104 601
REMOVE SIGNAL SYSTEM
LUMP SUM
i
$25,000 00
$25,000 DO
9
2105 522
SELECT GRANULAR BORROW (CV)
CU YD
20
$9 50
$19000
10
22115D1
AGGREGATE BASE CLASS 5 (100% CRUSHED)
TON
160
$130D
$2,08000
1
2232 604
MILL BITUMINOUS PAVEMENT (SPECIAL)
SQ YD
1,950
$3 00
$5,850 00
12
2331 609
LEVELING COURSE MIXTL RE
TON
150
$5800
$8,70000
13 2350 501
TYPE HV 3 WEARING COURSE MIXTURE (F)
TON
315
$55 00
$17,325 00
14 2350 502
TYPE MV 3 NON WEARING COURSE MIXTURE (8)
TON
305
$47 00
$14,335 00
15
2357 502
BITUMINOUS MATERIAL FOR TACK COAT
GAL
350
$2 00
$700 00
16
2501 511
15' RC PPE SEWER DESIGN 3003 CLASS V
LIN FT
16
$65 00
$1,040 OD
17
2506 502
CONSTRUCT DRAINAGE STRUCTURE DES SPECIAL (2 X3' CB)
EACH
1
$1,200 OD
$1200 OD
1B
2505 522
ADJUST FRAME RING CASTING (MANHOLE)
EACH
1
$32500
$325 00
19
2505 602
ADJUST FRAME RING CASTING (CATCH BASIN)
EACH
3
$400 00
$1,200 OD
20
2521501
4' CONCRETE SIDEWALK
SOFT
50
$4 50
$225 00
21
2521602
TRUNCATED DOME PEDESTRIAN RAMP
EACH
1
$450 00
$450 00
22
1 2531501
CONCRETE CURB GUI DESIGN 0615
LIN FT
940
$13 00
$12,220 OD
23
2531 511
CONCPETE MEDIAN
SQ YD
200
$23 00
$4,600 OD
24
2563 601
TRAFFIC CONTROL
LUMP SUM
1
$6,000 OD
15,000 OD
25
256551'
FULL ACT TRAFFIC CONTROL SIGNAL SYSTEM
SYSTEM
1
$200,00000
$200,000 00
26
2575 505
SODDING TYPE LAWN (INCL TOPSOIL FERTILIZER)
SD YD
210
$6 00
$1,26000
Subtotal $316,170.00
+ICY Contingencies $31,620 00
Subtotal $347,790 00
30% Indirect Cost $104,340.00
Total $452,100.00
Cost Estimate
Shannon Parkway/ CSAfd 42 Improvements
City P1 oject No. 412
Rosemount, MN
JI'SB Project No. 1556 -34
O'Domnleeistnd SerbgslaJb(LOCat SertmgslTemporary Infemef FYes1OLKEBOpmmn of Probable Cos's_JPK (3)
ADOPTED this 16th day of January, 2007.
ATTEST:
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2006
A RESOLUTION AUTHORIZING THE PREPARATION OF PLANS AND SPECIFICATIONS
FOR 42 /SHANNON PARKWAY INTERSECTION IMPROVEMENTS
CITY PROJECT #412
WHEREAS, the City Council has determined that certain improvements are necessary for the intersection of
CSAH 42 and Shannon Parkway, and
WHEREAS, the City Council directed Staff to prepare a preliminary layout and cost estimate for said
improvements, and
WHEREAS, said prehmmary layout and cost estimate are on file in the Public Works Department.
NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF ROSEMOUNT,
MINNESOTA:
1. Such improvements are hereby ordered as proposed for the project.
2. The City Engineer is hereby ordered to prepare plans and specifications for the making of such
improvements at the 42 /Shannon Parkway Intersection.
3. The City Council requests the preparation of a Joint Powers Agreement with Dakota County for cost
pardcipation.
Amy Domeier, City Clerk
Motion by: Seconded by:
Voted in favor:
Voted against.
1
William H Droste, Mayor
CRY PROJECT NO 412
SHEET OF 1 SHEETS
9so A.
-4
0
C
10 0
D
1 Z
'm
O)
2
ZZ
0
A
N
SAW Cul armeNous
seal
E5o3
9.2
se,
F Sr.wuN e50555y
9E,
8 aal
eseo
esso
s%aa
9800
Woo
ss.9
X
no
z Ws9 nA
su�ryT 3iiAYlxous
PA SA
c.ee 59wW &luwn[as
Wes
0 1
Eye•
'H S -mil
V ELEv.953 82
95H H1 460 cl PA STA
v£Sreol D 0 E ELEV=S
fsaP pa
e 959%
PA STA =1
560.5
56o6
G
550 5
050,5 G
PN ELEV=959 43
95954 CA
Z
g 95909
I
9%a3
9W 51
Dec D
96061 ST0.1,e0 END
sm. 0,T elnuNW6
0552
o W03
900,
6co
Was
•SH— lP666W90
rn
CO
03
0
Z
0
r
Z
m
1 0
N
2
z
N
sr CUT DANU NM
a 9656
Woo
a 9561
Web
0600
9595
0697 ;9650OVMN.ws
6
0
0,r
o
o
u
n
A 1
wSB
150TH STREETISHAANON PARKWAY
INTERSECTION IMPROVEMENTS
ROSEMOUNT, MINNESOTA
"SE'
:t 4 N9