HomeMy WebLinkAbout6.q. Change Order #2 - Evermoor Glendalough 7th Additon, City Project #401AGENDA ITEM: Change Order #2- Evermoor Glendalough 7 Addition, City Project #401 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, City Engineer j I" AGENDA NO. (i4. ATTACHMENTS: Change Order #2 Map APPROVED BY: #2 for Evermod Project #401. RECOMMENDED ACTION: Motion to approve Change Order Glendalough 7 Addition Street and Utility Improvements, City 4 ROSEMOUNT CITY COUNCIL City Council Meeting: January 16, 2007 EXECUTIVE SUMMARY BACKGROUND: Attached for Council consideration is Change Order No. 2 for the Evermoor Glendalough 7t Addition Street and Utility Improvements, City Project #401. This change order addresses the following revisions to the project: 1. Restock sanitary and storm sewer manhole sections revised as a result of design changes on Carlingford Court approved by the developer. 2. Increase diameter size of storm sewer manhole #5109 from 84" to 96" to accommodate 42" pipe size and angle. The above changes to the project result in a net increase of $7,271.86 for a revised contract amount of $1,831,284.16. All additional costs will be paid by the developer, Lennar. SUMMARY: Staff recommends Council approval of Change Order No. 2 for the Evermoor Glendalough 7 Addition Street and Utility Improvements, City Project #401. G \ENGPROJ \401 \Change Order2CC1 -16 -07 doc s WSB Assoc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South Suite 300 January 10, 2007 Minneapolis, MN 55416 Tel 763 541 -4800 Fax. 763-541-1700 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Re: Change Order No. 2 Evermoor's Glendalough 7 Addition City of Rosemount Project No. 401 WSB Project No. 1556 -63 Dear Mr. Brotzler: Please find enclosed Change Order No. 2 (four copies) for the above referenced project. The change order reflects a net increase to the contract amount of S7,271.86 for a revised contract total of $1,831,284.16. All additional costs will be paid by the developer, Lennar. If the attached meets with your approval, please sign and process. This change order addresses the following revisions to the project: 1. Restock sanitary and storm sewer manhole sections revised as a result of design changes on Carhngford Court approved by the developer. 2. Increase diameter size of storm sewer manhole #5109 from 84" to 96" to accommodate 42" pipe size and angle. If you have any questions or comments regarding the enclosed, please contact me at 651 -322- 2724. Thank you. Sincerely, WSB Associates, Inc. Morg Projec Enclosures cc: Cindy Domiden, City of Rosemount A -1 Excavating, Inc. tsf Minneapolis 1 St Cloud Equal Opportunity Employer 6 IENGPROI4OIILTR CO 2Cfl bronkrO10907doc EVERMOOR'S GLENDALOUGH TTH ADDITION STREET AND UTILITY CONSTRUCTION CITY ROSEMOUNT PROJECT NO. 401 W$N PROJECT 1356e63 OWNER: CITY OF ROSEMOUNT 2875 145TH STREET WEST ROSEMOUNT, MN 55088 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION 1 COMPENSATION FCR RESTOCKING CHARGES NECESSARY CHANGES TO SANITARY SE:'ti E.R AND STORM SEWER MA NH-.LF SECTIONS AS A RESULT OF DESIGN CHANGES ON CARI_INGFDRD COLS T AS APPROVE° By CEVELC-SPE SSE AT TACHED CCUNFr GF,T EPR.L51Nv0uCES_ 2 INCREASE CIAMETER SIZE OF STORM SEWER fdANHOLE FROM 84' TO 9S' TO ACCOMMODATE 42 PIPE SIZE AND Ar IsLE_ 4 BUILD I IT PAID FOR AT CONTRAC T PRICE FOR 84 "STRUCTURE CHANGE ORDER RSELECT3 A3C)IT IC +NAL COST PER ,NEAR FOOT FOR 96' STRUCTiUI IT JS UNDERSTOOD THAT THIS CHANGE ORDER: NCLUDES ALL ADDITIONAL COSTS AND T!UE EATE1.SIONS'l.HICH ARE ,N ANY WAY SHAPE, OR FORM ASSOCIATED WITH THE'v :'GR:C E FVENTS LIE5C41BED ASITAE CHANGE IN CONTRACT PRICE: ORIGINAL CONTRACT PRICE. PREVIOUS CHANGE ORDERS GCJ'4TRACT PRICE PRIOR TO THIS CHANGE ORDER 51,624 012 CONTRACT T PRIOR TO THIS CHANGE ORDER 7't raJU6 NEi INCREASE OF THIS CHANGE ORDER. ¢7,2 66 NET @.0 SEASE :".Ain CHAriGE URGER NONE CONTRACT PRICE WITH ALL APFRCA CHANGE ORDERS _1631234.16 CONTRACT TIME WITH AP PRO ED CHANGE GPDERS a'5,20ob RECOMMENDED BY. NIA APPROVED By C ITY E'.G WE DATE OF COUNCIL ACTION CHANGE ORDER NO. 2 CONTRACTOR: A4 EXCAVATING, INC. P.0 BOX 9D BLOOMER, WI 54724 CHANCE IN CONTRACT TIME. St ,81J043 ORIGINAL. CONTRACT -1rAE 91112V06 54 559 20 NCI CHANGE FROM FEEL GUS Gr'A OROE rsz1.63 C 1.7f 0 ELfl 1!9[2007 EVERMOOR'S GLENDALOUGH 7TH ADDITION STREET AND UTILITY CONSTRUCTION CITY ROSEMOUNT PROJECT Na 401 WSB PROJECT 1556 -63 ADDED ITEMS TOTAL ADDED ITEMS CHANGE ORDER NO. 2 DELETED ITEMS Item No MaL No Description TOTAL DELETED ITEMS CHANGE ORDER NO. 2 CHANGE ORDER NO. 2 DETAI Item No. Mat No Description Note Qty Unit Price Extended Amount 119 2506 601 MODIFY MANHOLE STRUCTURES 1 1 LUMP SUM $3,440 76 $3,44076 120 2506 501 CONSTRUCT DRAINAGE STRUCTURE DES 96 -4020 2 9 1 LIN FT $421 00 $3,831 10 $7,271.86 Qty Unit Price Extended Amount $0.00 rh 119/2007 TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $7,271.86 NOTES 1 COMPENSATION FOR RESTOCKING CHARGES NECESSARY CHANGES TO SANITARY SEWER AND STORM SEWER MANHOLE SECTIONS AS A RESULT OF DESIGN CHANGES ON CARLINGFORD COURT AS APPROVED BY DEVELOPER SEE ATTACHED COUNTY MATERIALS INVOICES 2 INCREASE DIAMETER SIZE OF STORM SEWER MANHOLE #5109 FROM 84" TO 96" TO ACCOMMODATE 42" PIPE SIZE AND ANGLE #5109 BUILD HEIGHT PAID FOR AT CONTRACT PRICE FOR 84' STRUCTURE CHANGE ORDER REFLECTS ADDITIONAL COST PER LINEAR FOOT FOR 96" STRUCTURE K101556[]I4dMnIConSWCnon AdmInsN-N Chang. Order tDnaU C ARE 0 0 250 500 rr 0 r r a v S GGS L ICS /7COUCHT"N 9 TN �i Fi x t1 3 cR� N o 1,000 SCHWARZ POND 1,500 2,000 SO P p RRq z ,Lp i /gip PATF�a o COLES_HIRF CORM U TRL 0 J MEW 137TH STo 0 V Q 0 V 0 U cc re 0 0 142ND ST W Feet 132ND CT 132ND ST 14 0 z BROHZE PKWY CONNEMARA c L.F 138TH STW p >I 138TH ST Ni z QI I 0 H V1 U. 138TH ST M' a 1 139TH ST M o G Uj z z w m Q z r 140TH ST VIL a I OI' 0 2 0 0 re z November 2006 FILE Osnap2 /sharel /GIS /City/Maps/Departmental Maps/Engineering /Chas /Glendalough 7th Locate mxd