HomeMy WebLinkAbout6.q. Change Order #2 - Evermoor Glendalough 7th Additon, City Project #401AGENDA ITEM: Change Order #2- Evermoor
Glendalough 7 Addition, City Project
#401
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer j
I"
AGENDA NO. (i4.
ATTACHMENTS: Change Order #2 Map
APPROVED BY:
#2 for Evermod
Project #401.
RECOMMENDED ACTION: Motion to approve Change Order
Glendalough 7 Addition Street and Utility Improvements, City
4 ROSEMOUNT
CITY COUNCIL
City Council Meeting: January 16, 2007
EXECUTIVE SUMMARY
BACKGROUND:
Attached for Council consideration is Change Order No. 2 for the Evermoor Glendalough 7t Addition
Street and Utility Improvements, City Project #401. This change order addresses the following revisions
to the project:
1. Restock sanitary and storm sewer manhole sections revised as a result of design changes on Carlingford
Court approved by the developer.
2. Increase diameter size of storm sewer manhole #5109 from 84" to 96" to accommodate 42" pipe size
and angle.
The above changes to the project result in a net increase of $7,271.86 for a revised contract amount of
$1,831,284.16. All additional costs will be paid by the developer, Lennar.
SUMMARY:
Staff recommends Council approval of Change Order No. 2 for the Evermoor Glendalough 7 Addition
Street and Utility Improvements, City Project #401.
G \ENGPROJ \401 \Change Order2CC1 -16 -07 doc
s
WSB
Assoc Infrastructure 1 Engineering 1 Planning 1 Construction 701 Xenia Avenue South
Suite 300
January 10, 2007 Minneapolis, MN 55416
Tel 763 541 -4800
Fax. 763-541-1700
Mr. Andy Brotzler, PE
City Engineer
City of Rosemount
2875 145 Street West
Rosemount, MN 55068
Re: Change Order No. 2
Evermoor's Glendalough 7 Addition
City of Rosemount Project No. 401
WSB Project No. 1556 -63
Dear Mr. Brotzler:
Please find enclosed Change Order No. 2 (four copies) for the above referenced project. The
change order reflects a net increase to the contract amount of S7,271.86 for a revised contract
total of $1,831,284.16. All additional costs will be paid by the developer, Lennar. If the attached
meets with your approval, please sign and process.
This change order addresses the following revisions to the project:
1. Restock sanitary and storm sewer manhole sections revised as a result of design changes on Carhngford Court
approved by the developer.
2. Increase diameter size of storm sewer manhole #5109 from 84" to 96" to accommodate 42" pipe size and angle.
If you have any questions or comments regarding the enclosed, please contact me at 651 -322-
2724. Thank you.
Sincerely,
WSB Associates, Inc.
Morg
Projec
Enclosures
cc: Cindy Domiden, City of Rosemount
A -1 Excavating, Inc.
tsf
Minneapolis 1 St Cloud
Equal Opportunity Employer
6 IENGPROI4OIILTR CO 2Cfl bronkrO10907doc
EVERMOOR'S GLENDALOUGH TTH ADDITION
STREET AND UTILITY CONSTRUCTION
CITY ROSEMOUNT PROJECT NO. 401
W$N PROJECT 1356e63
OWNER:
CITY OF ROSEMOUNT
2875 145TH STREET WEST
ROSEMOUNT, MN 55088
YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION
1 COMPENSATION FCR RESTOCKING CHARGES NECESSARY CHANGES TO SANITARY SE:'ti E.R AND STORM SEWER MA NH-.LF SECTIONS AS A
RESULT OF DESIGN CHANGES ON CARI_INGFDRD COLS T AS APPROVE° By CEVELC-SPE SSE AT TACHED CCUNFr GF,T EPR.L51Nv0uCES_
2 INCREASE CIAMETER SIZE OF STORM SEWER fdANHOLE FROM 84' TO 9S' TO ACCOMMODATE 42 PIPE SIZE AND Ar IsLE_ 4 BUILD
I IT PAID FOR AT CONTRAC T PRICE FOR 84 "STRUCTURE CHANGE ORDER RSELECT3 A3C)IT IC +NAL COST PER ,NEAR FOOT FOR 96' STRUCTiUI
IT JS UNDERSTOOD THAT THIS CHANGE ORDER: NCLUDES ALL ADDITIONAL COSTS AND T!UE EATE1.SIONS'l.HICH ARE ,N ANY WAY SHAPE, OR
FORM ASSOCIATED WITH THE'v :'GR:C E FVENTS LIE5C41BED ASITAE
CHANGE IN CONTRACT PRICE:
ORIGINAL CONTRACT PRICE.
PREVIOUS CHANGE ORDERS
GCJ'4TRACT PRICE PRIOR TO THIS CHANGE ORDER 51,624 012 CONTRACT T PRIOR TO THIS CHANGE ORDER 7't raJU6
NEi INCREASE OF THIS CHANGE ORDER. ¢7,2 66 NET @.0 SEASE :".Ain CHAriGE URGER NONE
CONTRACT PRICE WITH ALL APFRCA CHANGE ORDERS _1631234.16 CONTRACT TIME WITH AP PRO ED CHANGE GPDERS a'5,20ob
RECOMMENDED BY.
NIA
APPROVED By
C ITY E'.G WE
DATE OF COUNCIL ACTION
CHANGE ORDER NO. 2
CONTRACTOR:
A4 EXCAVATING, INC.
P.0 BOX 9D
BLOOMER, WI 54724
CHANCE IN CONTRACT TIME.
St ,81J043 ORIGINAL. CONTRACT -1rAE 91112V06
54 559 20 NCI CHANGE FROM FEEL GUS Gr'A OROE
rsz1.63 C 1.7f 0 ELfl
1!9[2007
EVERMOOR'S GLENDALOUGH 7TH ADDITION
STREET AND UTILITY CONSTRUCTION
CITY ROSEMOUNT PROJECT Na 401
WSB PROJECT 1556 -63
ADDED ITEMS
TOTAL ADDED ITEMS CHANGE ORDER NO. 2
DELETED ITEMS
Item No MaL No Description
TOTAL DELETED ITEMS CHANGE ORDER NO. 2
CHANGE ORDER NO. 2 DETAI
Item No. Mat No Description Note Qty Unit Price Extended Amount
119 2506 601 MODIFY MANHOLE STRUCTURES 1 1 LUMP SUM $3,440 76 $3,44076
120 2506 501 CONSTRUCT DRAINAGE STRUCTURE DES 96 -4020 2 9 1 LIN FT $421 00 $3,831 10
$7,271.86
Qty Unit Price Extended Amount
$0.00
rh
119/2007
TOTAL ADJUSTMENT TO ORIGINAL CONTRACT AMOUNT $7,271.86
NOTES 1 COMPENSATION FOR RESTOCKING CHARGES NECESSARY CHANGES TO SANITARY SEWER AND STORM SEWER MANHOLE SECTIONS AS A
RESULT OF DESIGN CHANGES ON CARLINGFORD COURT AS APPROVED BY DEVELOPER SEE ATTACHED COUNTY MATERIALS INVOICES
2 INCREASE DIAMETER SIZE OF STORM SEWER MANHOLE #5109 FROM 84" TO 96" TO ACCOMMODATE 42" PIPE SIZE AND ANGLE #5109 BUILD
HEIGHT PAID FOR AT CONTRACT PRICE FOR 84' STRUCTURE CHANGE ORDER REFLECTS ADDITIONAL COST PER LINEAR FOOT FOR 96" STRUCTURE
K101556[]I4dMnIConSWCnon AdmInsN-N Chang. Order tDnaU
C ARE
0
0 250 500
rr
0
r
r
a v
S
GGS
L ICS
/7COUCHT"N 9
TN
�i Fi x
t1 3 cR� N o
1,000
SCHWARZ
POND
1,500
2,000
SO P
p RRq
z
,Lp
i /gip PATF�a o COLES_HIRF
CORM
U
TRL 0
J
MEW 137TH STo 0 V Q
0 V
0 U
cc re
0 0
142ND ST W
Feet
132ND CT
132ND ST 14
0
z
BROHZE
PKWY
CONNEMARA
c L.F 138TH STW
p >I 138TH ST Ni
z QI I
0 H V1 U. 138TH ST
M'
a 1 139TH ST
M o G Uj
z
z w
m Q z r
140TH ST VIL a I OI'
0
2
0
0
re
z
November 2006
FILE Osnap2 /sharel /GIS /City/Maps/Departmental Maps/Engineering /Chas /Glendalough 7th Locate mxd