HomeMy WebLinkAbout6.h. Receive Feasibilty Report/Set Public Hearing - Street Improvemens Project City Project # 410AGENDA ITEM: Receive Feasibility Report/Set Public
Hearing- Street Improvements Project,
City Project #410
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, City Engineer
AGENDA NO. 10.14.
ATTACHMENTS: Resolution; Feasibility Report
APPROVED BY; Cr
RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving the Feasibility Report
and Setting a Public Hearing for the Street Improvements Project, City Project #410.
4 ROSEMOUNT
City Council Meeting: February 6, 2007
BACKGROUND:
On October 17, 2006 the Rosemount City Council authorized the preparation of a Feasibility Report for
the Street Improvement Program. This project has been designated as City Project No. 410.
Attached please find a copy of the Feasibility Report for the 2007 -2010 Street Improvement Program and
2007 Street Improvement Program Project. This report addresses the reconstruction and bituminous
pavement rehabilitation of streets within the City of Rosemount that have been identified by the Pavement
Management Program and includes a recommended schedule. The report has been separated into two
sections. The first section includes a review of all areas identified by the City's Pavement Management
Program for reconstruction or rehabilitation. The second section focuses on the proposed 2007 Street
Improvement Program Project. As previously discussed, the goal with this report is to address not only
the proposed 2007 improvements but future year improvements. For future projects, this report will be
the basis for those projects as identified m the report.
A beef review of the proposed 2007 improvements is as follows:
1. LOCATION
The proposed project includes Areas 6 and 7. Area 6 is Camero Lane West and Cambrian Avenue
West to the south of Lower 147t Street; and Area 7 is Biscayne Way between 145t Street and
Biscayne Avenue.
2. PROPOSED IMPROVEMENTS
CITY COUNCIL
EXECUTIVE SUMMARY
For Area 6, the proposed improvements include the reconstruction of Camero Lane West and
Cambrian Avenue West along with the full replacement of sanitary sewer and water main. In Area
7, the proposed improvements include the reconstruction of Biscayne Way as an urban section
with concrete curb and gutter, along with the full replacement of sanitary sewer and water main.
For Area 7 an alternate design consisting of a modified rural street design is included. This
alternate design utilizes alternative drainage techniques to concrete curb and gutter and storm
sewer.
G ENGPRO I \410\RecetveFR- SetPHCC2-6 -07 doc
SUMMARY:
Staff recommends Council adoption of a resolution receiving the feasibility report and setting the public
hearing for the 2007 Street Improvement Program Project, City Project No. 410.
2
ADOPTED this 6th day of February, 2007.
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2007-
A RESOLUTION RECEIVING THE FEASIBILITY REPORT AND
SETTING THE PUBLIC HEARING FOR THE
2007 STREET IMPROVEMENTS PROJECT
CITY PROJECT #410
WHEREAS, the City Council deemed it necessary and expedient that the City of Rosemount, Minnesota,
construct certain improvements, to -wit: City Project #410, 2007 Street Improvements Project, in the City as
described m and in accordance with the feasibility report prepared by the City Engineer; and
WHEREAS, the City Council has been advised by the City Engineer that said utility and street improvements,
City Project #41012 feasible, and should best be made as proposed, and the City Engineer's report to this effect
has heretofore been received by Council, and filed with the City Clerk on February 6, 2007, and
WHEREAS, the statute provided that no such improvements shall be made until the Council has held a public
hearing on such improvements following mailed notice and two pubhcations thereof in the official newspaper
stating tune and place of the heating, the general nature of the improvement, the estimated costs thereof, and
the area proposed to be assessed, in accordance with the law.
NOW THEREFORE BE IT RESOLVED, the City Council of the City of Rosemount accepts the feasibility
report for City Project #410 and places it on file.
NOW THEREFORE IT BE FURTHER RESOLVED, by the City Council of the City of Rosemount that
the pubhc hearing be scheduled to consider City Project #410, 2007 Street Improvements Project, to be held on
Tuesday, February 20, 2007 at 7 30 o'clock p.m or as soon thereafter as possible, in the Council Chambers of
the City Hall.
William H Droste, Mayor
Motion by: Seconded by:
Voted in favor:
Voted against:
ASSET EVALUATION FORM
Asset Number /Description: 8613 Inspections Ford Focus
Purchase Date: 4/3/2000
Purchase Price: $13,800
Current Value: $4,900
Average Annual Maintenance Cost To Date: $160
Average annual maintenance cost as a of Current Value: 3.2%
Current Mileage: 35,560
Current Overall Condition:
(poor) 1 2 3 4 5 7 8 9 10 (excellent)
Describe any major repairs or maintenance due in the next six (6) months:
Found no major problems.
Recommendation:
Replace immediately
Replace in six (6) months
Replace in twelve (12) months
X Do not replace (evaluate again in one year)
Evaluation performed by: Dean Sandstrom
Evaluation Date: 1/17/07
ASSET EVALUATION FORM
Asset Number /Description: 8612 Inspections Ford Focus
Purchase Date: 4/3/2000
Purchase Price: $13,800
Current Value: $5,000
Average Annual Maintenance Cost To Date: $160
Average annual maintenance cost as a of Current Value: 3.2%
Current Mileage: 34,150
Current Overall Condition:
(poor) 1 2 3 4 5 3 7 8 9 10 (excellent)
Describe any major repairs or maintenance due in the next six (6) months:
Undercarriage rust. Will need new exhaust system in 2007.
Recommendation:
Replace immediately
Replace in six (6) months
Replace in twelve (12) months
X Do not replace (evaluate again in one year)
Evaluation performed by: Dean Sandstrom
EvaluationDate: 1/17/07
ASSET EVALUATION FORM
Asset Number /Description: 8344 Ford F350 with dump box
Purchase Date: 7/6/2000
Purchase Price: $24,222
Current Value: $14,000
Average Annual Maintenance Cost To Date: $900
Average annual maintenance cost as a of Current Value: 6.4%
Current Mileage: 31,734
Current Overall Condition:
(poor) 1 2 3 4 5 6 111 8 9 10 (excellent)
Describe any major repairs or maintenance due in the next six (6) months:
Box could be sandblasted and painted.
Recommendation:
Replace immediately
Replace in six (6) months
Replace in twelve (12) months
X Do not replace (evaluate again in one year)
Evaluation performed by: Dean Sandstrom
Evaluation Date: 1/17/07
ASSET EVALUATION FORM
Asset Number /Description: 8443 sweeper
Purchase Date: 3/27/1997
Purchase Price: $101,750
Current Value: $15,000 (trade value)
Estimated Replacement Cost: $124,500
Average Annual Maintenance Cost To Date: $5,000
Average annual maintenance cost as a of Current Value: 33%
Current Hours: 3,275
Current Overall Condition:
(poor) ffi 2 3 4 5 6 7 8 9 10 (excellent)
Describe any major repairs or maintenance due in the next six (6) months:
Crack in main gear box, conveyor assembly bent.
Recommendation:
X Replace immediately
Replace in six (6) months
Replace in twelve (12) months
Do not replace (evaluate again in one year)
Evaluation performed by: Dean Sandstrom
Evaluation Date: 1/17/07
QUOTE 1070071
ORDER:
QTY.
CITY OF ROSEMOUNT
2875 145TH ST. W.
ROSEMOUNT MN 55068 4997
Customer P.O.:
customer Phone: 651 423 4411
DESCRIPTION
1.00 *PELICAN SE PER STATE CONTRACT
1.00 *ROSEMOUNT OPTIONS
1.00 *TRADE IN 1997 PELICAN SINGLE
ROSEMOUNT PELICAN 07
MAC QUEEN EQUIPMENT, INC.
595 ALDINE ST. ST. PAUL MN, 55104
651- 645 -5726 WATTS 1- 800 -832 -6417
FAX 651- 645 -6668
ELGIN PELCIAN SE DUAL MECHANICAL GUTTER BROOMS
JOHN DEERE DIESEL
SPRUNG GUIDE WHEEL SUSPENSION
AIR RIDE CLOTH RH TRAIL BOSS LEFT HAND SEATS
HYDRAULIC MAIN BROOM SUSPENSION WITH BROOM INDICATORS
TURBO 2 PRE CLEANER
AUTO ENGINE SHUT DOWN
EXTRA WATER CAPACITY
LOWER ROLLER WASH OUT SYSTEM
ANTI SYPHON SYSTEM
AM /FM RADIO (Mg)
AUTO LUBE
CLEARNACE LIGHTS AND REFLECTORS
SUB.TOT. 124,559.00
BUYER SELLER
We reserve the right to change prices without notice. The price in effect
at time of order will prevail, nothwithstanding the prices shown herein.
sales tax and F.E.T. will be added unless tax exempt certificate is provided.D
Page 1
QUOTE DATE:
ORDER DATE:
12/13/06
SHIP TO: CITY OF ROSEMOUNT
2875 145TH ST. W.
ROSEMOUNT MN 55068 -4997
TERMS: N30
SALES REP.:STEFFEN /WEIS
EACH
121,943.00
17,616.00
15,000.00
EXTENDED PRICE
121,943.00
17,616.00
15,000.00
(so°
elol
000'LO (t)
1111
I 66t'GPE
000 oZ
111111
000'09
DOUSE L (.1
000'00
000'01.
SS6'L9
e,0oo
1 s,oa�
0
1 30,000
30,000
420,000
(21 4,500 001
1
oo9'L (e)
000'000'9 (z)
1112111E01511
000
1 000 '1.
000'09
000'9
O 140000
L 92,000
44,000
50,000
(5) 1,200,000
(6) 3,770,000
22,000
22,000
(1 45,000
45,000
1 00o'9k
000'9p
ES9'ekZ'61
000'ogt'L lJ
000'059 (o)
000'SZ9
000'091 (.1
Other
1 005/k
o0o'SE1.
MI
0 09'L
Lood000's
I
000'0
LOoo'q
200 000
1,670,000
Ill
000'Sk
000'ZZ
000'ZZ
I
009'L96't
000
Mel
#mS glee
E9LLEk
lion
awls
'oao'oot
000'9L
D0(/'LEL
emo
111111111M
IIIIIII
III
000 opt
L 000 0)
000'0L
00s'zz
III
0US COL
1 /4tllln
111111111111111111111
1111
00E001
000'01
000'91
005'ZZ
005
000'960
l woo
wag1S
11111111111111111111111
III
000'006
I
850,000
1,050,000
1 WOO
3BMOS
0
1 eta°
IeteM
III
11111
1250,000
1,250,000
MSA
Funds
From
State
Ili"
000'009
L
000'009
pund
Owl fled
15,000
30,000
420,000
1111111111
000'994
ssassy
I
I
111111111
000'000'
000'000'
Mal d(0
Luwdlnb3
I
000 OZ
r 10 000
40,000
moon
00509
NMI
no
000 09 1
000
0
000'e9
1 -J
I
000'ooe
0000
1 000'05
ppm
Ian
1,050,000 303,000
e1110 al dla
LaaIIS 6uIPpng
IN
gum
24,000
Item _Deaan. Department i
amity oullle0 lmad
'Welcome to Rosemount" Signs Comm Cleo
2005 Equipment Certificates (5-Years) (Council
2006 Equipment Cef(r9aates (5- Years) (Council I.
PC Printer Replacements Finance
PC Workstation Upgrades (From 20003 Finance
Radio Replacements (Replace Obsolete) Foe
i
CIty -Wide Software Gent Govt
New Neighborhood Park Design (N -1) Park Roc
Miscellaneous Park Improvements _Park Rec
Parks Master Plan Update Park Rec
Construction of Parking Lot for Disc Golf Course Park &Rec
Brockway Park Built Park Rec
Park Rec
Park &Reg
03 110d
a
aallod
eosdd
aagod
eallo
eallod
Pub Works
Pub Works
Pub Works
Pub Works
Pub Works
Pub Works
(Pub Works
sub Works
[Pub Works
r Put, Works
Pub Works
slow qnd
qnd
sg10M qnd
1
Purchase Land for Athletic Complex
Construct Athleac Complex
3 New Radar Units
Department Issued Handguns
1
Emergency Equipment for Squads Insta0atlon
Equipment for New Squad
LDCC Capital Costs (Year 1 of 7)
Radio Communications Upgrades 900 MHZ
4 Squads (Sell Back 3 #320, 440 480 -1 New)
PW Building Addition Lease /Purchase Year 5 of 20)
(County Road 42 US Highway 52 (Demon Costs)
Pavement Management Program
Street Reconstruction County Road 73 (CR 42 to 135th Street)
1
1
Inspection Vehicle (Replace #308)
Inspection Vehicle (Replace #309)
Pickup (Replace #345)
I 1 -Ton Pickup (Replace #344)
1 -Ton Pickup (Replace #342)
i
Crane Box for Utility Vehicle #342)
Sweeper (Replace #443)
Paint Connemara Tower Structural Repairs
Shannon Pond Outlet (Storm CIP 5)_
i
slalol
ucgowlsuo0 SL# (IOM[
lanai Jae.
Mpopd
2 LODZ
QL000
Z 1000
0 1000
0 1000
z moo
L00Z
L00Z
I t (1003
L 1000
0 1000
1003
L LODZ
E 2003
L00z
O 100Z
01000
L L0132
L LOaz
Z 1003
L 1002
z inn 1
Z 1002
Z 1003
Z 1002
Z (1002
Z 1002
Z LOOZ
Z L002
L 1002
L 1000
y'"DddddD9
6Li0UDOti4