Loading...
HomeMy WebLinkAbout6.i. Receive Bids / Awards Contract - Prestwick Place 3rd Street & Utility Improvements, City Project 425CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2011 — A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE PRESTWICK PLACE 3 RD STREET AND UTILITY IMPROVEMENTS CITY PROJECT 436 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: 1. All bids on construction of the Prestwick Place Y Street and Utility Improvements are hereby received and tabulated. 2. The bid of LaTour Construction, Inc. in the amount of $1,141,437.31 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted contingent upon securing all necessary right -of -way. 3. Upon securing all necessary right -of -way, the Mayor and City Clerk are authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest shall be retained until a contract has been executed. 5. Award is contingent on the City receiving satisfactory letters of credit to guarantee payment of special assessments by Akron 42, LLC for Street 14. ADOPTED this 16 day of August, 2011. William H Droste, Mayor ATTEST: Amy Domeier, City Clerk �ROSEMOI.��. �I 1 EXECUTIVE SUMMARY CITY COUNGIL City Council Meeting: August 16, 2011 AGENDA ITEM: Receive Bids Award Contract AGENDA SECTION: Prestwick Place 3� Street Utility Consent Improvements, City Project 436 PREPARED BY: Andrew J. Brotzler, PE, Director of u lic AGENDA NO. Works City Engineer ATTACHMENTS: Resolution; Bid Tabulation; Letter APPROVED BY: Recommendation; Map RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Prestwick Place 3` Street Utility Improvements, City Project 436. ISSUE: Receive bids and award contract for the Prestcvick Place 3` Street Utiliry Improvements, City Project 436. BACKGROUND: On Friday, August 5, 2011, bids for this project were received and read aloud publicly. After verification of bids received, the low bidder is LaTour Construction, Inc. in the amount of $1,141,437.31. All costs associated with this project will be funded by the developers, U.S. Home CorpoYation and Akron 42, LLC. The Prestwick Place 3` Addition is comprised of 27 single-family residential units. The proposed impYOVements include the installation of water main, sanitary sewer, and storm sewer throughout the project area, and the construction of appro�mately 1140 feet of 32-foot bituminous xoadway. This project also includes the construction of Abbeyfield Avenue which is appro�nately 1450 feet of 36-foot bituminous roadway that borders the development on the east. Additionally, this project includes the construction of a right-turn lane on �vestbound CSAH 42 at the entrance to Abbeyfield Avenue. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract foY the PYestwick Place 3` Street and Utility Improvements, City Project 436. G:\ENGPROJ\43G\20ll081G CC Rec Bid-AwardContract.docs CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2011 — 69 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE PRESTWICK PLACE 3 RD STREET AND UTILITY IMPROVEMENTS CITY PROJECT 436 BE IT RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of the Prestwick Place 3' Street and Utility Improvements are hereby received and tabulated. 2. The bid of LaTour Construction, Inc. in the amount of $1,141,437.31 for the construction of said improvements are in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted contingent upon securing all necessary right -of -way. 3. Upon securing all necessary right -of -way, the Mayor and City Clerk are authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 4. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. 5. Award is contingent on the City receiving satisfactory letters of credit to guarantee payment of special assessments by Akron 42, LLC for Street 14. le—, ADOPTED this 16''' day of August, 2011. H. Droste, Mayor ATTEST: Amy Domeier, City Clerk 1 Engineering Planning Environmental Construction 701 Xenia Avenue South Associate.r. /na SUIte 300 Minneapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 August 9, 2011 Honorable Mayor and City Council City of Rosemount 2875 145�' Street West Rosemount, MN 55068 Attn: Cindy Dorniden Re: Prestwick Place 3` Addition Street and Utility Construction City of Rosemount Project No. 436 WSB Project No. 1916-42 Dear Mayor and Council Members: Bids were received for the above-referenced project on Friday, August 5, 2011, and were opened and read aloud. A total of nine bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder for the Base Bid (Schedule A-J) as LaTour Construction, Inc., Maple Lake, Minnesota, in the amount of $1,141,437.31. We recommend that the City Council consider these bids and award a contract to LaTour Construction, Inc. based on the results of the bids received. Sincerely, WSB Associates, Inc. hil Olson, PE Project Manager Enclosures cc: Joe LaTour, LaTour Construction, Inc. Andy Brotzler, City of Rosemount Cindy Dorniden, City of Rosemount tsf Minneapolis St. Cloud Equal Opportunity Employer C:\UserslpcoV+ppData�LocalVvlicrosofl\Wintlows\Temporary Intemet Files\ContenLOutlook159�EFUDBLLTR RECMMDTN-�mca08052011.doc BID TABULATION SUMMARY PROJECT: Prestwick Place 3rd Addition Street and Utility Construction LOCATION: City of Rosemount Project No. 436 WSB PROJECT NO.: 1916-42 Bids Opened: Friday, August 5, 2011 at 10:00 a.m. Contractor Bid Security (5%) Grand Total Bid 1 LaTour Construction, Inc. X h. J fl 2 Douglas-Kerr Underground, LLC X �'?,'I� �'��A• a. 3 Northwest Asphalt, Inc. X $1,�,��� 4 Ryan Contracting Co. X $1,168,672.65 5 Nodland Construction Co., Inc. X $1,216,194.30 4��t�` 6 Minger Construction, Inc. X '$?F 7 Friedges Contracting Co., LLC X $1,250,036.76 8 Kuechle Underground, Inc. X $1,294,702 58 .m� ^'Y �s s- 9 Northdale Construction Co., Inc. X Engineer's Opinion of Cost $1,332,781.90 I hereby certify that this is a true d correct lation of the bids as received on August 5, 2011. Phil Olson, PE Denotes corrected figure C:IUserslpcolAppDatalLocallMicrosoklWindowslTemporary Internet FileslConfent.0utlook159QEFUD811916-42 Bid Tab Summary.x/s ROSEMOLINT T '��j I •i si MAR�' i Vil Bt?NA�RE PAT MARE POND �,iu A. j�� I s, ,g 9y 4 ��y��' �u�� P���, 9j�� �'G v .q �9 P 2 J� G 2 t P�� Q�j �L�' �'G �v �-a� M 2 ,r y r o� IY �o.�'H sr w C� �o 9��� W r r _�9� y app. F �a~ <t Q Z P���� l'°-----� LL ti �N pAT p o'M- :ca USTA S 1 TR r qL r C,'� a 4�ND S�' 0 r� ��y �w ����MF(E �.1..=.;. Og pN 4 Q �L� .j �pygE.RF? .�'�-ti� oi�.-c; rR c�R AY 45T ST Vil CSAH RORA AiIE i i i ;i; i ;;i ii I I i 0 440 880 1,760 2,640 3,520 Feet T:\GIS\Maps\Departmental Maps\Engineering\Chris\Location Map -436 August 2011