HomeMy WebLinkAbout6.g. Authorize Preparation of Feasibility Report for 2012 - 2014 Street Improvements Project �ROSEMOLII�IT EXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: August 16, 2011 AGENDA ITEM: Authorize Preparation of Feasibility AGENDA SECTION: Report for 2012 2014 Street Consent Improvements Project PREPARED BY: Andrew J. Brotzler, PE, Director of AGENDA NO. lQ��,, Public Works/City Engineer ATTACHMENTS: Resolution; Map APPROVED BY: RECOMMENDED ACTION: Motion to Authorize the Preparation of a Feasibility Report for 2012 2014 Street Improvements Project. BACKGROUND: Beginning in 2010, the City initiated a plan to prcpare multi-�-ear feasibilin� reports (three year impYOVement plan) to take a longer range look at upcoming projects and allo�v for more ad�-ance nouce to properry o�vners. Based on this plan, each �-ear's feasibilit�- stud�- then re� and update the next 5�ear's project along �vith incorpoYating the thitd �-ear project. The attached Capital ImpYOVement Plan map illustrates the roadways proposed to be evaluated within the three y�ear feasibility report and bey-ond. `I'he follo�ving information �vill be included �vithin the thYee year feasibility� report: Existing conditions with detailed information on the eYisting materials Proposed improvements Detailed cost estimates and proposed funding sources Estunated assessments Proposed pedestrian improvements and bike lanes on 145` Street and Shannon Park�vay� During the development of the feasibiliry report, additional discussions and public involvement will be required for the proposed pedestrian impro�-ements and proposed bike lanes on 145`�' Street and Shannon Park�va��. At this time, Staff is requesting authorization to prepare a three year feasibilitt- report �vhich includes detailed project information described above. SUMMARY: Staff tecommends Council appio��al of the attached xesolution to authorize the preparation of a feasibilit�r report for the 2012 2014 Street Improvements Project. G:AI�:�iGPRO�\437\2U111181G C(: .Authorizc l�R2l1L-2111-}SIP.doc� CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2011 A RESOLUTION ORDERING A FEASIBLITY REPORT FOR THE 2012 2014 STREET IMPROVEMENTS PROJECT WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the feasibility of the 2012 2014 Street Improvements Project. NOW THEREFORE BE IT RESOLVED The City Engineer is directed to have the necessary feasibility report prepared for the 2012 2014 Street Improvements Project. ADOPTED this 16 day of August, 2011. William H. Droste, Mayor AT1�,ST: Amy Domeier, City Clerk I( �J C 2 0 O z o �o o �a I �4, o CONNEMARA D a A CROGUS Pq i �z j pF tON '9f. AN 3 4 T Q 143 D T Q- w Q o Q UPPE 143RD Z Z G SJ 14 V 4 T �R CENTC W q 145TH ST W 0 I; w i f u U Q �0 �ti� a �0 j o s, 1, a W ,,`z E o �z ��yo W �a,4k�- I f� Fc N Ciq a`' �E !.Q Oq� FEC'NG T c�P O szNO cr c�a �EW ER co uMeA M �t cia M RD yy AN �54TH CT 4T T W U m Z Q 1 o (r 'ISSTH ST W Q a 0 HSTW 0 i.ur,n� p� 4 m Ro Legend a ,o a p o��•• �S, 2012 Mill Overlay I, ,S,T„ �T ,S,TH ST 2012 2014 Improvements �h 158TH CT 158TH ST o n i x i 15 TN CT DAKOTA DR I� C Proposed Street Improvements !C ROSEMOLINT August 2011 A Rosemounf, MN o 95o i.90o 380o Feet PUBLIC WORKS DEPARTMENT File. T�.1GIS1CirylMapslDeparimental MapslEngineeringlPh�i�Phil CarteGraph Revised 201108I I �J� A.,soc- Infrastructure Engineering Planning Construction 701 Xenia Avenue South Suite 300 Mi�neapolis, MN 55416 Tel: 763-541-4800 Fax: 763-541-1700 August 3, 2011 Mr. Andy Brotzler City Engineer City of Rosemount 2875 145` Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 6(Final) Glendalough 3` Addition City of Rosemount Project No. 430 WSB Project No. 1916-10 Dear Mr. Brotzler: Please find enclosed the final Construction Pay Voucher No. 6 for the above-referenced project in the amount of $15,151.29. Also enclosed are the following documents required for processing final payment for the above- referenced project: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two-year Maintenance Bond (warranty start date to coincide with the date Council approves final payment). We recommend that you make final payment in the amount of $15,151.29 for Ryan Contracting Company at your earliest convenience. Please contact me at 651-322-2015 if you have any questions or comments regarding the attached information. Thank you. Sincerely, ssociates, Inc. Phil Olson, PE Project Engineer Enclosures cc: Mr. Thomas Ryan, Ryan Contracting Company Cindy Dorniden, City of Rosemount Joe Koscielak, WSB Associates, Inc. tsf Owner: City of Rosemount Date: 8/3/2011 2875 145th Street West Rosemount, MN 55068-4941 For Period: 7/1/2011 to 7/31/2011 Request No.: 6& FINAL Contractor: Ryan Contracting Co. 26350 France Avenue �4� ,�f s.�rai`I�r�����, frt�-, Elko, MN 55020 Pay Voucher RSMT Glendalough 3rd Addition Client Contract No.: Project No.: 01916-10 Client Project No.: 430 Project Summary 1 Original Contract Amount $330,907.00 2 Contract Changes Addition $0.00 3 Contract Changes Deduction $0.00 4 Revised Contract Amount $330,907.00 5 Value Completed to Date $303,025.85 6 Material on Hand $0.00 7 Amount Earned $303,025.85 8 Less Retainage $0.00 9 Subtotal $303,025.85 10 Less Amount Paid Previously $287,874.56 11 Liquidated Damages $0.00 12 AMOUNT DUE THIS PAY VOUCHER NO. 6& FINAL $15,151.29 I HEREBY CERTIFY THAl' A FINAL EXAMiNAT10N HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Recom nded fo Approval by: Construction Observer: WSB 8� As o 'at Approved by Contractor: Approved by Owner: Ryan Contra ting Co City of Rosemount G�- Specified Contract Completion Date: Date: 10/31 /2010 Comment: RosEMOU�r LI _.a. r° ,�-�...m L T{.� N ��1Y ,jj j i f j t i t j T--�T W i J w 13; 71��� 1�32ND ST W �J x r m ��R BRONZE aR� c�� GT ,�u, W r M W f 133RD ST �p,�.� �.w r R 134TH T Vil i R R q a v� f� s� �Q r =a 'V v N z� '134TH �T- G��'OW� Y� C�,R AC� Y Z�_ z o 9L L.�..._-- 7` �o, l`� F m �5 -`'`�'o ��d�� �,r �.s. o r cn T f G '��L o �������P m Brockwa z Q c� �d Park �m� Q ;Q ,Q L, 0 ��..�36�'H S� W�� j rrf �p. O� c.� o �y� cQi p v PP�H COLESNIRE Aq FA BR a Brockway t�� ��'t CORLISS TRL o PKW vM c� kr Park p�. Q- J, E ��R��"'�' �F� �����sT.� w CO N N E M,A ¢>a> o V a �._,Q�...� j„ 138TH ST W 0 0 Schwarz Pond Pa il Z 138TH ST V1 Q U. 138TH ST i 'st 139TH ST_ W sct�wARZ Q r� POND t m o� 0 280 560 1,120 1,680 2,240 Feet July 2010 T:/GIS/City/Maps/Departmental Maps/Engineering/Chris/Glendalough 3rd Locate