HomeMy WebLinkAbout6.g. Authorize Preparation of Feasibility Report for 2012 - 2014 Street Improvements Project �ROSEMOLII�IT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: August 16, 2011
AGENDA ITEM: Authorize Preparation of Feasibility AGENDA SECTION:
Report for 2012 2014 Street Consent
Improvements Project
PREPARED BY: Andrew J. Brotzler, PE, Director of AGENDA NO. lQ��,,
Public Works/City Engineer
ATTACHMENTS: Resolution; Map APPROVED BY:
RECOMMENDED ACTION: Motion to Authorize the Preparation of a Feasibility Report for
2012 2014 Street Improvements Project.
BACKGROUND:
Beginning in 2010, the City initiated a plan to prcpare multi-�-ear feasibilin� reports (three year
impYOVement plan) to take a longer range look at upcoming projects and allo�v for more ad�-ance nouce to
properry o�vners. Based on this plan, each �-ear's feasibilit�- stud�- then re� and update the next
5�ear's project along �vith incorpoYating the thitd �-ear project.
The attached Capital ImpYOVement Plan map illustrates the roadways proposed to be evaluated within the
three y�ear feasibility report and bey-ond. `I'he follo�ving information �vill be included �vithin the thYee year
feasibility� report:
Existing conditions with detailed information on the eYisting materials
Proposed improvements
Detailed cost estimates and proposed funding sources
Estunated assessments
Proposed pedestrian improvements and bike lanes on 145` Street and Shannon Park�vay�
During the development of the feasibiliry report, additional discussions and public involvement will be
required for the proposed pedestrian impro�-ements and proposed bike lanes on 145`�' Street and Shannon
Park�va��.
At this time, Staff is requesting authorization to prepare a three year feasibilitt- report �vhich includes
detailed project information described above.
SUMMARY:
Staff tecommends Council appio��al of the attached xesolution to authorize the preparation of a feasibilit�r
report for the 2012 2014 Street Improvements Project.
G:AI�:�iGPRO�\437\2U111181G C(: .Authorizc l�R2l1L-2111-}SIP.doc�
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2011
A RESOLUTION ORDERING A FEASIBLITY REPORT FOR THE
2012 2014 STREET IMPROVEMENTS PROJECT
WHEREAS, the City Council of the City of Rosemount deems it necessary to investigate the feasibility of
the 2012 2014 Street Improvements Project.
NOW THEREFORE BE IT RESOLVED The City Engineer is directed to have the necessary
feasibility report prepared for the 2012 2014 Street Improvements Project.
ADOPTED this 16 day of August, 2011.
William H. Droste, Mayor
AT1�,ST:
Amy Domeier, City Clerk
I(
�J C
2 0 O
z o
�o
o
�a I
�4, o
CONNEMARA
D
a
A
CROGUS
Pq i
�z
j pF tON '9f.
AN 3 4 T Q 143 D T
Q- w Q
o Q UPPE 143RD
Z Z
G
SJ 14 V
4 T �R CENTC W q 145TH ST W
0
I; w
i f u U
Q
�0 �ti�
a �0
j
o s,
1, a
W ,,`z
E o �z ��yo
W
�a,4k�-
I f�
Fc
N Ciq
a`' �E !.Q
Oq� FEC'NG T
c�P O
szNO cr c�a
�EW ER co uMeA
M �t cia
M RD yy
AN �54TH CT 4T T W
U m Z Q
1 o (r 'ISSTH ST W
Q
a
0 HSTW
0 i.ur,n� p�
4 m Ro Legend
a ,o
a
p o��••
�S, 2012 Mill Overlay
I, ,S,T„ �T ,S,TH ST
2012 2014 Improvements
�h 158TH CT 158TH ST o
n
i x
i 15 TN CT DAKOTA DR I�
C
Proposed Street Improvements !C ROSEMOLINT
August 2011 A
Rosemounf, MN o 95o i.90o 380o Feet PUBLIC WORKS DEPARTMENT
File. T�.1GIS1CirylMapslDeparimental MapslEngineeringlPh�i�Phil CarteGraph Revised 201108I I
�J�
A.,soc- Infrastructure Engineering Planning Construction 701 Xenia Avenue South
Suite 300
Mi�neapolis, MN 55416
Tel: 763-541-4800
Fax: 763-541-1700
August 3, 2011
Mr. Andy Brotzler
City Engineer
City of Rosemount
2875 145` Street West
Rosemount, MN 55068
Attn: Cindy Dorniden, City of Rosemount
Re: Construction Pay Voucher No. 6(Final)
Glendalough 3` Addition
City of Rosemount Project No. 430
WSB Project No. 1916-10
Dear Mr. Brotzler:
Please find enclosed the final Construction Pay Voucher No. 6 for the above-referenced project in the
amount of $15,151.29.
Also enclosed are the following documents required for processing final payment for the above-
referenced project:
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota
Statutes 290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two-year Maintenance Bond (warranty start date to coincide with the date Council approves
final payment).
We recommend that you make final payment in the amount of $15,151.29 for Ryan Contracting
Company at your earliest convenience. Please contact me at 651-322-2015 if you have any
questions or comments regarding the attached information. Thank you.
Sincerely,
ssociates, Inc.
Phil Olson, PE
Project Engineer
Enclosures
cc: Mr. Thomas Ryan, Ryan Contracting Company
Cindy Dorniden, City of Rosemount
Joe Koscielak, WSB Associates, Inc. tsf
Owner: City of Rosemount Date: 8/3/2011
2875 145th Street West
Rosemount, MN 55068-4941
For Period: 7/1/2011 to 7/31/2011 Request No.: 6& FINAL
Contractor: Ryan Contracting Co.
26350 France Avenue
�4� ,�f s.�rai`I�r�����, frt�-, Elko, MN 55020
Pay Voucher
RSMT Glendalough 3rd Addition
Client Contract No.:
Project No.: 01916-10
Client Project No.: 430
Project Summary
1 Original Contract Amount $330,907.00
2 Contract Changes Addition $0.00
3 Contract Changes Deduction $0.00
4 Revised Contract Amount $330,907.00
5 Value Completed to Date $303,025.85
6 Material on Hand $0.00
7 Amount Earned $303,025.85
8 Less Retainage $0.00
9 Subtotal $303,025.85
10 Less Amount Paid Previously $287,874.56
11 Liquidated Damages $0.00
12 AMOUNT DUE THIS PAY VOUCHER NO. 6& FINAL $15,151.29
I HEREBY CERTIFY THAl' A FINAL EXAMiNAT10N HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE
CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS
BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO,
THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER.
Recom nded fo Approval by: Construction Observer:
WSB 8� As o 'at
Approved by Contractor: Approved by Owner:
Ryan Contra ting Co City of Rosemount
G�-
Specified Contract Completion Date: Date:
10/31 /2010
Comment:
RosEMOU�r
LI
_.a. r°
,�-�...m
L T{.� N ��1Y ,jj
j i
f
j
t i
t
j
T--�T W i J
w 13;
71��� 1�32ND
ST W
�J
x r
m
��R BRONZE
aR� c��
GT
,�u, W
r M
W
f
133RD ST
�p,�.� �.w r R 134TH T Vil
i
R
R q
a v�
f� s� �Q r =a
'V v N
z�
'134TH �T-
G��'OW� Y� C�,R AC� Y Z�_ z
o 9L L.�..._--
7`
�o, l`� F m �5
-`'`�'o ��d��
�,r �.s. o
r
cn T f G
'��L o �������P m Brockwa
z Q c� �d Park
�m� Q ;Q ,Q
L, 0 ��..�36�'H S� W�� j rrf �p. O� c.�
o �y� cQi p v
PP�H COLESNIRE Aq FA BR
a Brockway
t�� ��'t CORLISS TRL o PKW
vM c� kr Park
p�. Q- J,
E
��R��"'�' �F� �����sT.� w CO N N E M,A
¢>a> o V
a �._,Q�...�
j„ 138TH ST W
0 0
Schwarz Pond Pa
il Z 138TH ST V1
Q
U. 138TH ST i
'st 139TH ST_ W
sct�wARZ Q
r� POND t m o�
0 280 560 1,120 1,680 2,240
Feet
July 2010