HomeMy WebLinkAbout6.j. Set Public Improvement Hearing/Declare Costs/Set Assessment Hearing - 2011 Street Improvements Project, City Project #432AGENDA ITEM: Set Public Improvement Hearing /Declare
Costs /Set Assessment Hearing 2011
Street Improvements Project, City Project
#432
AGENDA SECTION:
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of A 64
Works City Engineer
AGENDA NO G
ATTACHMENTS: Resolutions; Map; Project Cost anc.
Funding Summary
APPROVED BY:
obi
RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Setting a Public Hearing for
Improvements on the Proposed 2011 Street Improvements Project, City Project #432
And
2) Motion to Adopt a Resolution Declaring Costs to be Assessed and Ordering Preparation
of Proposed Assessment and Calling for Hearing on the Proposed Assessment for the
2011 Street Improvements Project, City Project #432.
4 ROSEMOUNT
City Council Meeting: April 5, 2011
BACKGROUND:
CITY COUNCIL
EXECUTIVE SUMMARY
On January 4, 2011 the Rosemount City Council received the Feasibility Report for the 2011 Street
Improvements Project. This project has been designated as City Project #432. A full presentation of the
Feasibility Report and the proposed improvements contained within will be made at the Public Hearing.
A brief review of the proposed improvements and funding follows.
1. LOCATION AND PROPOSED IMPROVEMENTS
The 2011 Street Improvement Program Project includes the following:
Mill and overlay of 145 Street West from Diamond Path to Shannon Parkway (0.5 miles)
New sidewalk installation on north side of 145 Street West from Diamond Path to Shannon
Parkway (0.5 miles)
Roadway rehabilitation of streets within the west half of the Valley Oak neighborhood (0.9 miles)
The attached location map illustrates the proposed project areas.
2. ESTIMATED COSTS AND FUNDING
The total estimated project cost for the 2011 Street Improvement Project is $1,207,736. The project is
proposed to be funded as follows:
Street CIP Fund $851,535
Special Assessments $257,532
Storm Utility Fund 37,564
Street Maintenance Fund 61,105
$1,207,736
G: \ENGPROJ \432 \20110405 CC SetPH- DeclareCostAssessment.doc
SUMMARY:
Staff recommends Council adoption of a resolution setting the public hearing for the 2011 Street
Improvements Program Project, City Project #432, for May 3, 2011. Additionally, Staff recommends as a
separate action, Council adoption of a resolution declaring the costs to be assessed and setting a public
assessment hearing for City Project #432, for May 3, 2011.
2
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2011
A RESOLUTION SETTING A PUBLIC HEARING FOR IMPROVEMENTS
ON THE PROPOSED 2011 STREET IMPROVEMENTS PROJECT
CITY PROJECT #432
WHEREAS, the feasibility report for the 2011 Street Improvements Project, City Project 432 was
received and plans and specifications were ordered on January 4, 2011; and
WHEREAS, the plans and specifications were approved and the advertisement for bids was
authorized on March 15, 2011; and
WHEREAS, the statute provided that no such improvements shall be made until the Council has
held a public hearing on such improvements following mailed notice and two publications thereof in
the official newspaper stating time and place of the hearing, the general nature of the improvement,
the estimated costs thereof, and the area proposed to be assessed, in accordance with the law.
NOW THEREFORE IT BE RESOLVED, by the City Council of the City of Rosemount that the
public hearing be scheduled to consider City Project 432, 2011 Street Improvements Project, to be
held on Tuesday, May 3, 2011 at 7:30 o'clock p.m. or as soon thereafter as possible, in the Council
Chambers of the City Hall and that the publication of notice thereof is hereby approved and ratified.
ADOPTED this 5 day of April, 2011.
ATTEST:
Amy Domeier, City Clerk
William H Droste, Mayor
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2011
A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING
PREPARATION OF PROPOSED ASSESSMENT, AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT
2011 STREET IMPROVEMENTS PROJECT
CITY PROJECT #432
WHEREAS, a hearing has been scheduled for the 2011 Street Improvements Project and the estimated
construction cost for such improvement is $979,779, and the estimated expenses to be incurred in the
making of such improvements amount to $227,957 so that the total cost of the improvement will be
$1,207,736.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of Rosemount, Minnesota:
1. The portion of the cost of such improvement to be paid by the City is hereby declared to be
$950,204. The portion of the cost to be assessed against benefited property owners is declared to be
$257,532.
2. Assessments shall be payable in equal annual installments extending over a period of 10 years, the
first of the installments to be payable with general taxes for the year 2011, and shall bear interest at
the rate of 2% points per annum above the interest rate paid by the City for its bonds from date of
the adoption of the assessment resolution, or 2% over our financial consultant's estimated true
interest cost (TIC) for a 10 -year bond transaction for the City of Rosemount issued in April /May of
this year.
3. The City Clerk, with the assistance of the City Engineer shall forthwith calculate the proper amount
to be specially assessed for such improvement against every assessable lot, piece or parcel of land
within the district affected, without regard to cash valuation, as provided by law, and she shall file a
copy of such proposed assessment in her office for public inspection; and
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
1. A hearing shall be held on Tuesday, May 3, 2011 in the Council Chambers at 7:30 p.m. or as soon
thereafter as possible, to pass upon such proposed assessment and at such time and place all persons
owning property affected by such improvement will be given an opportunity to be heard with
reference to such assessment.
2. Publication by the City Clerk notice of the hearing on the proposed assessment once in the official
newspaper at least two weeks prior to the hearing, stating in the notice the total cost of the
improvement is hereby approved and ratified. Mailed notice to the owner of each parcel described
in the assessment roll not less than two weeks prior to the hearings is also approved and ratified.
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
ADOPTED this 5 day of April, 2011.
ATTEST:
The owner of any property so assessed may, at any time prior to certification of the assessment to
the County Auditor, pay the whole of the assessment on such property, with interest accrued to the
date of payment, to the City, except that no interest shall be charged if the entire assessment is paid
within 30 days from the adoption of the assessment. The owner may at any time thereafter, pay to
the County Auditor the entire amount of the assessment remaining unpaid, with interest accrued to
December 31 of the year in which such payment is made. Such payment must be made before
November 15 or interest will be charged through December 31 of the succeeding year.
Amy Domeier, City Clerk
2
William H. Droste, Mayor
Resolution 2011
2011 Street Improvement Project
ROSEMOUNT
u_.
U 145TH STW
158TH CT W
15 H CT W
DAVENPORT
C
155TH ST W
�s.
57TH ST
1 58TH ST W
DAKOTA DR
143RD ST W
U 145TH ST
U 145TH
ST W
52ND CT
153RD S
154TH CT5l
Jaycee
Park
U. 148T
ST W
DECEMBER TR
151ST ST W
CENT C
151ST
U. 148TH ST
2ND ST W
153RD ST W
CORNELL TRL
56TH ST W
UPPER
143RD
148TH ST W
45TH ST 1111
147TH ST W
U 147TH ST W
149TH
14671-
Y
re
0 625 1,250
i
'Connemara �Q
9 Park
160TH ST W (CSAH 46)
2,500
3,750
Schwarz Pond Park.
T: /GIS/City /Maps/Departrnental Maps /Engineering /Chris/2011 PMP locate Both 12 -30-10
Carrolls
Woods
Park
5,000
Feet
143R
SGYIWHKG
POND
142ND ST W
143
`ZE
w
CC
w
140TH ST W
7 3 c 2 3 m
d• s
3 m
i Erickson
Park
uJ
W
S
m
160THST
December 2010
Funding Summary
145th Street
Improvements
Valley Oak
Improvements
City
Total
Street Capital Improvement Fund
$423,857
$427,678
$0
$851,535
Special Assessments
$27,249
$230,283
$0
$257,532
Storm Utility Fund
$0
$37,564
$0
$37,564
Street Mainteance Fund
$0
$0
$61,105
$61,105
Total
$451,106
$695,525
$61,105
1 $1,207,736
Project Cost and Funding Summary
2011 Street Improvement Program Project
Cost Calculations
145th Street Surface Improvements
Valley Oak Surface Improvements
Valley Oak Storm Sewer Improvements
145th Street Pedestrian Improvements
City Striping Im s rovements
Total
Construction Cost
$173,097
$548,581
$7,839
$194,712
$55,550
$979,779
LEAF
20%
25%
25%
25%
10%
LEAF
Total
$34,619
$137,145
$1,960
$48,678
$5,555
$227,957
Grand Total
$207,717
$685,727
$9,798
$243,389
$61,105
$1,207,736