Loading...
HomeMy WebLinkAbout6.h. Payment #3 & Final - Rosewood Village 3rd Addition, City Project 429AGENDA ITEM: Payment #3 Final, Rosewood Village 3rd Addition, City Project 429 AGENDA SECTION: Consent PREPARED BY: Andrew J. Brotzler, PE, Director of Pu Works City Engineer 4 AGENDA NO V14, 14 ATTACHMENTS: Payment Voucher; Map APPROVED BY: 48J RECOMMENDED ACTION: Motion to Approve Payment #3 and Final for the Rosewood Village 3 Addition, City Project 429, to Ryan Contracting and Accepting it for Perpetual Maintenance. 4 ROSEMOUNT City Council Meeting: July 19, 2011 CITY COUNCIL EXECUTIVE SUMMARY BACKGROUND: This item is on the agenda to request Payment 3 and Final to Ryan Contracting for the Rosewood Village 3' Addition, City Project 429. The final construction amount of $82,241.15 is 1.5% below the contract amount of $83,453.30. This project included the construction of a private street and cul-de -sac with concrete curb and gutter. An additional private roadway was extended west from the cul-de-sac to provide an emergency access for the property west of the Rosewood Village 3' Addition. Utility improvements included the construction of water main, sanitary sewer, and storm sewer. SUMMARY: Staff recommends that Council approve Payment 3 and Final for the project and accept the project for perpetual maintenance subject to the following conditions. 1. Satisfactorily showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year maintenance bond. G: \ENGPROJ \429 \20110719 CC Pymt 3 -Final Payment.docx WSB Associates, Inc. June 10, 2011 Mr. Andy Brotzler City Engineer City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden, City of Rosemount Re: Construction Pay Voucher No. 3 (Final) Rosewood Village 3rd Addition City of Rosemount Project No. 429 WSB Project No. 1916 -08 Dear Mr. Brotzler: Please find enclosed the final Construction Pay Voucher No. 3 for the above referenced project in the amount of $12,019.10. Also enclosed are the following documents required for processing final payment for the above referenced project: 1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92 requiring withholding state income tax. 2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have been fully paid or satisfactorily secured. 3. Consent of Surety to Final Payment certification from the contractor's surety. 4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final payment). We recommend that you make final payment in the amount of $12,019.10 for Ryan Contracting Company at your earliest convenience. Please contact me at 651- 322 -2015 if you have any questions or comments regarding the attached information. Thank you. Sincerely, WSB Associates, Inc. Phil Olson, PE Project Engineer Enclosures Infrastructure Engineering Planning Construction cc: Mr. Thomas Ryan, Ryan Contracting Company Cindy Dorniden, City of Rosemount Joe Koscielak, WSB Associates, Inc. 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 -541 -4800 Fax: 763 -541 -1700 tsf Proiect Summary 1 Original Contract Amount $83,453.30 2 Contract Changes Addition $0.00 3 Contract Changes Deduction $0.00 4 Revised Contract Amount $83,453.30 5 Value Completed to Date $82,241.15 6 Material on Hand $0.00 7 Amount Earned $82,241.15 8 Less Retainage $0.00 9 Subtotal $82,241.15 10 Less Amount Paid Previously $70,222.05 11 Liquidated Damages $0.00 12 AMOUNT DUE THIS PAY VOUCHER NO. 3 FINAL $12,019.10 WSB Associates, Inc. Owner: City of Rosemount 2875 145th Street West Rosemount, MN 55068 -4941 For Period: 6/1/2010 to 6/9/2011 Contractor: Ryan Contracting Co. 26350 France Avenue Elko, MN 55020 Pay Voucher RSMT Rosewood Village 3rd Addition Client Contract No.: Project No.: 01916 -08 Client Project No.: Date: 6/10/2011 Request No.: 3 FINAL I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS SHOWN IN THIS FINAL VOUCHER. Recommended for Approval by: WSB Associates, Inc. Approved by Contractor: Ryan Contracting Co. Specified Contract Completion Date: Date: 7/1/2011 Comment: Approved by Owner: City of Rosemount Page 1 of 4 Construction Observer: 145TH ST W BOY NBERRY CT1 BOSTON BOISE 148TH ST W w BRENNER CT 0 287.5 575 1,150 1,725 T: /GIS /City /Maps/Departmental Maps /Engineering /Chris /Rosewood Village 3rd Locate 2,300 Feet July 2010