Loading...
HomeMy WebLinkAbout9.f. Receive Bids / Award Contract - Connemara Trail Improvements, City Project 431AGENDA ITEM: Receive Bids Award Contract Connemara Trail Improvements, City Project 431 AGENDA SECTION: F'Je1w .3 L4 6 0 e% PREPARED BY: Andrew J. Brotzler, PE, Director 0 P ublic Works City Engineer 4 f AGENDA NO. GI, ATTACHMENTS: Resolution; Letter of Recommendation; Bid Tab; Funding Table; Map APPROVED BY: 00 RECOMMENDED ACTION: Motion to Adopt a Resolution Receiving Bids and Awarding the Contract for the Connemara Trail Improvements, City Project 431. 4 ROSEMOUNT CITY COUNCIL City Council Meeting: August 1, 2011 EXECUTIVE SUMMARY ISSUE: Receive bids and award contract for the Connemara Trail Improvements, City Project 431. BACKGROUND: On Friday, July 8, 2011, bids for this project were received and read aloud publicly. After verification of bids received, the low bidder is Minger Construction, Inc. in the amount of $2,341,683.53. Of this amount, $1,675,910 plus 25% for indirect costs will be funded upfront by the City with Municipal State Aid and City funds, and repaid in the future through deferred assessments to the Prestwick Place development. The City is able to utilize available Municipal State Aid funds and draw funds as an advance for this project. City storm core funds will be used to fund $665,773 plus 25% for indirect costs for trunk storm sewer improvements included within the project. The attached table shows the breakdown of project costs and funding. Council consideration to award this contract is concurrent with the approval of petition and waiver agreements for the deferment of assessments to properties within the Prestwick Place project. The proposed improvements will extend Connemara Trail east to Akron Avenue. Utility improvements include the construction of water main, sanitary sewer, and storm sewer along the entire segment. SUMMARY: Staff recommends that Council adopt the attached resolution receiving the bids and awarding the contract for the Connemara Trail Improvements, City Project 431. G: \ENGPROJ \431 \20110801 CC Rec Bid- AwardContract.docx ADOPTE D this 1 day of August, 2011. ATTEST: Amy Domeier, City Clerk CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2011 A RESOLUTION RECEIVING BIDS AND AWARDING CONTRACT FOR THE CONNEMARA TRAIL IMPROVEMENTS CITY PROJECT 431 WHEREAS, the City Council authorized the City Engineer to advertise for bids. BE IT FLRTHER RESOLVED, by the City Council of the City of Rosemount, Minnesota, as follows: All bids on construction of Connemara Trail Improvements have been received and tabulated. 1. The bid of Minger Construction, Inc. from Chanhassen, Minnesota, in the amount of $2,341,683.53 for the construction of said improvements is in accordance with the plans and specifications and advertisement for bids, and is the lowest responsible bid and shall be and hereby is accepted. 2. The Mayor and Clerk are hereby authorized and directed to enter into a contract with said bidder for the construction of said improvements for and on behalf of the City of Rosemount. 3. The City Clerk is hereby authorized and directed to return forthwith to all bidders the deposits made with their bids, except that the deposit of the successful bidder and the next two lowest bidders shall be retained until a contract has been executed. William H. Droste, Mayor WSB Engineering Planning Environmental Construction Associates, Inc. July 8, 2011 Honorable Mayor and City Council City of Rosemount 2875 145 Street West Rosemount, MN 55068 Attn: Cindy Dorniden Re: Connemara Trail Improvements City of Rosemount Project No. 431 S.A.P. 208 -104 -006 WSB Project No. 1916 -18 Dear Mayor and Council Members: Bids were received for the above referenced project on Friday, July 8, 2011, and were opened and read aloud. A total of nine bids were received. The bids were checked for mathematical accuracy and tabulated. Please find enclosed the bid tabulation indicating the low bidder for the Base Bid (Schedule A -E) as Minger Construction, Inc. Chanhassen, Minnesota, in the amount of $2,341,683.53. We recommend that the City Council consider these bids and award a contract to Minger, Construction, Inc., based on the results of the bids received. Sincerely, WSB Associates, Inc. Phil Olson, PE Project Manager Enclosures cc: Luke Minger, Minger Construction, Inc. An�}yBrgtzler, City of Rosemount Oh y Dorniden; City.of"Rosemount tsf Minneapolis St. Cloud Equal Opportunity Employer 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 541 -4800 Fax: 763 541 -1700 K: \01916- 18\AdmIMConstruction Admi■LTR RECMMOTN- hence -0708201 .doc N .Nli rv .Ornvrrnr.rvv..e..w..v.r n.r.rm■ e. V r.- Connemara Trail Improvements .r _611uj4?L.]:1:4A'iO] *MA 111l1a 0 550 1,100 128TH c ce 0 0 0 U CON 2,200 4 BAY RRY TR CIR 3,300 T:GIS /City /Maps /Departmental MapsiEngineering/Phil /2010 Future Connemara Trail POND BONAIRE PATH W 4,400 Feet MCMENOMY POND q�Eff�IV 145TH ST W (CSAH 42) 73 V w z cc BONAIRE PATH E OW-C!ty Hall Park June 2011