Loading...
HomeMy WebLinkAbout2.b. 2010 Street Improvements, City Project #4284ROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL Special City Council Work Session: April 26, 2010 AGENDA ITEM: #4280 Street Improvements, City Project AGENDA SE TION: PREPARED BY: Andrew J. Brotzler, PE, Director of thblic AGENDA NO. - �- Works/City Engineer ATTACHMENTS: APPROVED BY: RECOMMENDED ACTION: Discussion only. BACKGROUN : Bids for the 2010 Street Improvement Project will be received at 10:00 a.m., Friday, April 23, 2010. As the project includes a number of alternates, the award of a contract to the lowest responsible bidder will depend on the alternate(s) preferred by Council. Prior to presenting the final bids to Council for formal action to 'ward a contract, staff would like to present the bid results and alternates to Council for discussion and direction on preferred alternates. In addition, a ber efit appraisal has been completed for the proposed assessments to the rural residential properties on Shannon Parkway. A copy of the appraisal is on file in the engineering department. At the meeting, slaff will present to Council bid alternate information and updated assessment amounts based on the bids along with a summary of the benefit appraisal G: \ENGPROJ \428 \20100426 CWS Bid Alternates and Assessments.doc ") I `--� b 0 0 c� e t n C Z • v • bw .L r 1 KF rt- CD M7 a) rl� CD P,ja 3 O 3 Ul (D CD rt D D D D D N CD 00 00 W N ~` O CD (D (D (D cli � O O O O � cli D CD � � ai Qj a CD cD (D rn r� O -I�h W N Fj v -Epr -u2r, N -' N 00 00 W N ~` O O O O O O Fj v -Epr -u2r, N O N ~` Lri � 00 O O O O O C) Fj v L- L � 1 L_ L L_ L L. L- L_ L 1 l 7 cry D o ) � Q° �' CD cn - (D c C- rt CD n � D J O 0 W 00 � O � 00 % O O O O O O O O -u ~` LO O N k-O O W �--� W O O O p O O O p O L- L � 1 L_ L L_ L L. L- L_ L 1 l °° zT ~ (f) = (D Lo �- W Ul � -n ° ~` - 0 zT :3 C O 0 0 0 1 clJ L ' rt O < rt v 77 (D ( - ;7�- (D O 13J E °° -U!)- - � 0 F" �- W Ul � C) ° ~` o 0 0 o C rt ll► I -U!)- - � 00 F" �- W Ul � ll► I rO C� CD IV) r"r 0 n 0 3 3 CD rt Driver Feedback Signs General Two driver feedback sign installations are to be constructed with this project. Mounting ■ Fluorescent yellow green ■ Pedestal mounted ■ Located within 100 feet of school zone speed limit signing Power Options • AC Power Module ■ Powered by Continuous AC Power • DC Solar Kit ■ Powered by 120 Watt Solar Panels and Batteries Features and Benefits ■ Blare Tooth Wireless Communication ■ Up to 30 feet range ■ 19.2 K -Baud ■ Password protected • Configure Sign and Download Speed Data From Vehicle ■ Fast Download of Speed Data ■ No Cable Connection Required • Modular Design ■ Chassis ■ Electronics Control System • Removable • Secured with User supplied Lock • Environmentally Sealed • High Impact Polycarbonate Face • Lightweight • Easy Installation ■ Easy Repair ■ Secured Communication r- .f r1 1 1F. ,,it__ r i YOUR SPEED LED Solar Pedestrian Signing General Four LED solar pedestrian sign installations are to be constructed (two signs per crosswalk) with this project. Mounting ■ 30" Fluorescent yellow green S1-1 Sign ■ Pedestal mounted ■ Located at the crosswalk Features and Benefits • Programmed to operate using push- buttons • Automatically adjusts light output • Signs synchronized at crossing I fir.. f y 1 f