HomeMy WebLinkAbout2.b. GlenRose Development IssuesROSEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Workshop Meeting: April 14, 2010 AGENDA ITEM: GlenRose Development Issues AGENDA ECTION: ro PREPARED BY: Dwight Johnson, City Administrator AGENDA NO. ATTACHMENTS: map, letter, exhibit "b ", letter of credit list APPROVED BY: f7 RECOMMENDED ACTION: Information item BACKGROUND The GlenRose development is a condo development located just east of Highway 3 adjacent to Erickson Park. Dean Johnson Homes is the developer of the property. For the last 2 -3 years, the developer has been unable to financially meet the agreed upon obligations for developing the subdivision, including final paving of the streets, and issues relating to the storm sewer pipe, retaining walls, erosion control, wetlands, and other items. Two buildings were constructed with six units in each building. Only 8 of the 12 units have been completed. An additional 64 units are planned. The other four units are partially constructed to the drywall stage, but have no cabinets and no plumbing or electrical fixtures, and no finished floors. The City halted building permits due to unsatisfactory progress on the required subdivision improvements. A demand was made on the letter of credit for the subdivision held by Alpine Capital. This demand was refused due to Alpine Capital claiming insufficient assets to honor the letter of credit. Recently, Kurt Manley, a builder /developer in the South Metro area, has requested building permits to complete the four partially complete units in the existing buildings. Staff has been in discussions with him regarding the conditions under which he might proceed as well as longer range strategies for how the development might move forward in the future. DISCUSSION The situation is complicated by the existence of a variety of creditors and interested parties. At this time, there is no party, including Mr. Manley, who appears ready and able to take over the full responsibility for the entire development which is now the legal responsibility of Dean Johnson Homes. Staff is reviewing what circumstances might be acceptable to allow at least some build out to continue under the current circumstances. Staff's biggest current concern with the unfinished physical development work on site is that portions of the investment already made in the infrastructure, such as the streets, will rapidly deteriorate if no action is taken to finish them to proper specifications. This will make a bad situation worse if the development continues to sit idle for the next few years. Further discussions with Mr. Manley are anticipated before the workshop meeting, and staff plans to review and update these issues with the Council at the workshop meeting. — r- 4— �f 8 � Ski �ii i 1�} i Nf � ` hfl -' "� °' C O U � v =_ _- f",,i. • • 0 H el .i =: = { ;;Ftfr��i]]{3 1 113 j + s '_ irj. - ) _ _ - =� I :. '= < G � k O d > � � �f f -_ '�'i -• 'i '1.133jl1{±�1 1i5 I�i! � 4`y�SS �4 zi — r- 4— �f 8 � Ski �ii i 1�} i Nf — r- 4— ���ar3Yg�g4 �l��fa§iy;�FY�1tVS� r Iltl Ri I si e I l I O_ a ry 1 aCZ�_ •v ` x x s- €: gel �f Ski �ii i 1�} i Nf ���ar3Yg�g4 �l��fa§iy;�FY�1tVS� r Iltl Ri I si e I l I O_ a ry 1 aCZ�_ •v ` x x s- €: gel 4ROSEMOUNT PUBLIC WORKS DEPARTMENT November 10, 2009 Kurds Manley Fair Market Homes 764 Southcross Drive West Burnsville, MN 55306 Re: GlenRose of Rosemount City Project #397 Dear Mr. Manley: As follow up to our October 26, 2009 meeting regarding the GlenRose of Rosemount development, this letter's purpose is to define Public Infrastructure and Developer Improvement items as specified in the Subdivision Agreement between the City of Rosemount and GlenRose Investments, LLC for the GlenRose of Rosemount plat, dated December 5, 2005, and the necessary completion of these items as they pertain to the future issuance of building permits and Certificates of Occupancy within the development. The following listed items do not supersede the original requirements as set forth in the GlenRose Subdivision Agreement, and all items must be completed under each section. Items to be addressed prior to any future issuance of Certificates of Occupancy for the existing units within the development, o Payment of outstanding cash balance on development fund account, total of - - — - - - 80 5000. - $20,337 58 -torelease retainage and final- contract with RKI, Inc. Current development fund account shortage of $55,218.25. Approximately $5,000 additional to cover future administrative, engineering, wetland monitoring, and legal expenses. Additional funds will need to be forwarded to the City upon request per the terms of the Subdivision Agreement as future costs are incurred. o Final lift of roadway paving for 140`h Circle and associated work, currently quoted at $28,000. Includes spot curb and sidewalk replacement for damaged areas, adjustment of utility structures within the roadway prior to paving, and roadway striping. o Miscellaneous grading /erosion control /clean qp. Repair slope erosion at northeast corner of site, silt fence removal, and remove abandoned utility pole from site. o Replacement Letters of Credit from a bank or other type of approved securities to cover the cost of all outstanding developer funded responsibilities per the Subdivision Agreement. SPIRIT OF PRIDE AND PROGRESS 2875 145th Street West • Rosemount, MN 55068 - 4997.651- 423 -4411 • TDDMY 651- 423 -6219 • Fax 651 - 322 -2694 www. d. rosem o un t. m n. us Items to be funded or addressed prior to any future issuance of Building Permits for new structures within the development: o Compliance with wetland replacement order and ongoing wetland monitoring inspection requests. Currently, a Wetland Replacement Order has been issued for the site by the Minnesota Board of Water and Soil Resources (BWSR) and Department of Natural Resources — this is no longer being handled by the City of Rosemount and failure to comply may result in deed restrictions against the property that do not allow further construction activity. o Submittal of an as -built grading record plan for the entire site, prepared and certified by a Professional Engineer or Registered Land Surveyor, to be reviewed and approved by the City. o Inspection and repair if necessary of storm sewer adjacent to pond retaining wall affected by retaining wall construction. o Replacement of sidewalk along pond retaining wall affected by retaining wall construction. o Inspection and repair, if necessM, of retaining walls. Separation and cracking within the walls is apparent on the hammerhead turnaround wall in the southeast corner of the site. Submittal of an inspection report prepared by a structural engineer will need to address this separation and identify any necessary repairs. o Installation of streetlights. o Completion of landscaping, per City- approved landscape plan. If you have any questions or concerns regarding this letter, please feel free to contact me at 651 -322- 2724. Sincerely, Morgan awl , PE Assistant ity E gmeer cc: Dwight Johnson, City Administrator Andrew J. Brotzler, Director of Public Works /City Engineer Kim Lindquist, Community Development Director Charlie LeFevere, City Attorney Jeff May, Finance Director Dean Johnson, GlenRose Investments, LLC John Hanson, G1enRose Investments, LLC 2 G: \ENGPR0J \397 \Man1ey Letter 11- 9- 09.doc EXHIBIT B (Page 1 of 2) Letter of Credit for Develoner Improvements No. Item Cost 110% Calculation 1 Grading and Erosion Control $ 37,660 $ 41,426 $3500 /acre * 10.76 acres 2 Pond Restoration and Erosion Control Removal $ 25,000 $ 27,500 Minimum $25,000 3 Survey Monumentation $ 6,500 $ 7,150 $500 /lot * 13 lots 4 Retaining Wall $ 50,000 $ 55,000 Estimate 5 Landscaping $ 53,500 $ 58,850 Per Rick Pearson 6 Street Lights $ 36,000 $ 39,600 9 lights * $4000 /li ght 7 Buffer Monumentation $ 500 $ 550 10 signs * $50/sign 8 Park Equipment/Improvements $ - $ - 9 Wetland Restoration/Mitigation $ 1,400 $ 1,540 .07acres * $20,000 /acre 10 Wetland Monitoring $ 10,000 $ 11,000 City Engineer Estimation Total $ 220,560 $ 242,616 Letter of Credit for Public Infrastructure No. Item Cost 110% Calculation 1 Estimated Construction Cost $ 888,170 $ 976,987 Based on actual construction cost 2 Less Initial Cash Deposit 3 $ 150,000) $ 44,409 5% of Construction Cost 4 Street Light Energy Cost $ 1,080 9 lights * 24 months * $5 /month 5 Total $ 1,812 $ 826,987 ON Fees No. Item Cost Calculation 1 Engineering Fees $ 150,989 17% of the Construction Cost 2 Attorney Fees $ 2,500 Estimate 3 5% City Fees $ 44,409 5% of Construction Cost 4 Street Light Energy Cost $ 1,080 9 lights * 24 months * $5 /month 5 1 Seal Coating $ 1,812 1 $0.60 /SY * 3020 SY Total $ 200,790 Development Fees No. Item Cost Calculation 1 Park Dedication $ 228,000 76 units * .04 * $75,000 2 GIS Fees $ 4,180 $55 /unit * 76 units 3 Storm Sewer Trunk Charge $ 57,203 $60157 gross developable acre * 9.51 acres 5 Sanitary Sewer Trunk Area Charge $ 11,244 $1045 /acre * 10.76 acres 6 1 Watermain Trunk Area Charge 1 $ 45,300 $4210 /acre * 10.76 acres Total $ 345,927 GAENGPROJ\397 \Subdivision Calcs Z m 0 W V LL O W H F J W f- U Q Z o Q $ c c N F Q D H 2 WQ F Q O F 2 7 O 9 Q D O 0 g � g a O c m � g O � N $ N N J O ZQ U U Um m ' a n m W Q � � E 6 n U So a O C am IL_ d= r o o u w C `m g° m d m E E E gW = _ _ p o 0 0 W 0 0 O m a C Fo o 1- a U'U