Loading...
HomeMy WebLinkAbout2.d. Presentation - 2011 Street Improvements Project, City Project #432iiROSEMO EXECUTIVE SUMMARY CITY COUNCIL City Council Work Session: December 15, 2010 AGENDA ITEM: Presentation — 2011 Street Improvements Project, City Project #432 AGENDA SECTION: (v h , t" PREPARED BY: Andrew J. Brotzler, PE, Director o Public Works / City Engineer AGENDA NO. ATTACHMENTS: Map, Presentation APPROVED BY: RECOMMENDED ACTIONS: Discussion Only BACKGROUND: At the September 7, 2010 regular Council meeting, the Council authorized the preparation of the Feasibility Report for the 2011 Street Improvements. This project has been designated as City Project #432. A map illustrating the project area and proposed improvements is attached. ISSUES: 1. PROJECT SCOPE The 2011 Street Improvement Project was initiated through planning efforts as part of the 2011 Capital Improvement Program (CIP). Proposed for improvements were 145`h Street, Shannon Parkway, and roadways within the Valley Oak neighborhood. Through the development of the feasibility report, it was determined that the estimated special assessment revenue for 145`h Street and Shannon Parkway is less than what was previously projected. This results in a higher than anticipated funding need from the Street CIP fund. The proposed improvements within the west half of the Valley Oak neighborhood consists of roadway rehabilitation to approximately 4,500 feet of various 32 -foot wide urban streets. The proposed improvements include removal of the existing pavement to accommodate a roadway section of 12 inches of select granular, 6 inches of aggregate base, and 4 inches of new bituminous pavement. Also proposed is spot curb and gutter replacement, the installation of B618 curb and gutter at the intersection radii, and additional subgrade excavation along selected areas of Cornell Trail due to poor subgrade materials. Mill and overlay improvements are proposed on 145`h Street from Diamond Path to Cameo Avenue and on Shannon Parkway from CSAH 42 to 145`h Street. These improvements include spot curb and gutter replacement and the option to modify the existing roadway striping. Staff is recommending that at a minimum the Valley Oak neighborhood proceed as the area proposed for improvements as it is the worst condition of the three areas. Additionally, it is recommended that the section of 145`h Street between Diamond Path and Shannon Parkway be included in the 2011 project. The Street CIP funding requirements for this neighborhood and the section of 145`h Street is within the 2011 G: \ENGPROJ \432 \20101215 CWS Presentation.doc Street CIP budgeted amount. The attached presentation includes tables showing the estimated project costs and proposed funding. 2. STRIPING AND BIKE LANE IMPROVEMENTS For the proposed mill and overlay improvements on 145`h Street and Shannon Parkway, the feasibility of adding on -street bike lanes and pedestrian crosswalk improvements was considered. Along 145`h Street between Chippendale Avenue and Cameo Avenue, the addition of bike lanes will require parking to be limited to one side of the roadway. This was presented at the public informational meeting conducted in November and general property owner feedback was not supportive of eliminating on -street parking. Below is the proposed striping configuration for both 145`h Street and Shannon Parkway: • 11 feet - thru & turn lane width • 8 feet - minimum parking lane width • 5 feet - minimum bike lane width Should Council want to further consider the elimination of on -street parking to facilitate bike lanes, it is anticipated that additional communication and discussion with the adjacent property owners would be appropriate. 3. PEDESTRIAN IMPROVEMENTS Additional improvements for consideration as planned by the Pedestrian Facilities Map include the installation of trail on the north side of 145`h Street between Diamond Path and Chippendale Avenue and trail on the west side of Shannon Parkway between CSAH 42 and 145`h Street. These improvements are proposed to be funded with the Pedestrian Improvement Fund; however, additional discussion regarding the timing of the improvements is required based on the timing of funds being available. The summary of funding and costs included in the presentation shows that the soonest funding would be available from the Pedestrian Improvement Fund is 2016. SUMMARY: At this time, staff is requesting that Council review the available budget, proposed improvements, and estimated project costs. Based on available City funding for 2011, staff is recommending the following for 2011: • Valley Oak Neighborhood Rehabilitation • 145`h Street Mill and Overlay — Diamond Path to Shannon Parkway • No trail construction 2 Estimated Project Funding 14P Street: Dlamaid Path to $180,000 $20,000 $0 $200,000 Shannon Parkway Shannon Parkway 1 $200,000 1 $15,000 1 $0 1 $215,000 777"— ,:, Proposed Striping Modifications 2 Q n. Z J�POND L Ay O� PIS vneaarm ti C ZAREO0Schwarz Pond Park ° r� �Tw Oe V ND b 1E r DPR ZH P� CROCUS W ? C � Carrolls DAVENPORT CTW G``tPNe.P�` parks Uj A ATH W > Q _ m 143RD ST W C 43RD ST > 143R ST W Q J AN Q Q a tr w y °vN ® L9 a UPPER 143RD z 1 a a �° 144 to m —1 T u 144T w 1 l �� W O� U 145TH ST W U 145TH ST U 145TH Rp w srw Q � �o BALT 3 > _ F W j xcria Y `j• U Q LL J VO I._. Q_ J > all Pfrk ��.� fuo z a 47T w N z _j � f48T W 'f N Q Z Oc a O U.�50TH ST m v U ROSEMO S � W 146TH ST W use L. 147TH 146TH ST W LOWS w 147TH ST W w p F z a � f Q 148TH ST W 53 � U. 148TH ST = � w �nk U S�� pp.nw J 0 ns 149TH w 149TH ST � Fu. 149TH a a p 711 UPPER 1491 H ST W "U. 1A ■ R z Q y R ERB 0 a4�Hc,R rk a� 151ST w 151gS U Q � m� DECEMBER TR 4� DA OOF. W o F---I t� na_ CT n. 151STSTW 9 1 \i M M DAiNV colV Qo 155 < o a � 156TH ST W O .156TH 1 DAKOTA DR > v� CAS J =.� Z 160TH ST W (CSAH 46) 0 625 1,250 2,500 3,750 5,000 Feet C", W O j O Or a f153RD ST W I It— CT I I 56 sr Central Park i M 46T T ST s' } BC � If EIR NNE y CT m \OF m i z w 0 m December 2010 T: /GIS /City /Maps /Departmental Maos /Engi need ng /Chris /2011 PMP locate - Both Q, m p W ...m 140TH ST VJ z U 3Q P� m C o m m 142ND ST W of Erickson Park S � W 146TH ST W use L. 147TH 146TH ST W LOWS w 147TH ST W w p F z a � f Q 148TH ST W 53 � U. 148TH ST = � w �nk U S�� pp.nw J 0 ns 149TH w 149TH ST � Fu. 149TH a a p 711 UPPER 1491 H ST W "U. 1A ■ R z Q y R ERB 0 a4�Hc,R rk a� 151ST w 151gS U Q � m� DECEMBER TR 4� DA OOF. W o F---I t� na_ CT n. 151STSTW 9 1 \i M M DAiNV colV Qo 155 < o a � 156TH ST W O .156TH 1 DAKOTA DR > v� CAS J =.� Z 160TH ST W (CSAH 46) 0 625 1,250 2,500 3,750 5,000 Feet C", W O j O Or a f153RD ST W I It— CT I I 56 sr Central Park i M 46T T ST s' } BC � If EIR NNE y CT m \OF m i z w 0 m December 2010 T: /GIS /City /Maps /Departmental Maos /Engi need ng /Chris /2011 PMP locate - Both 2011 Street Improvement Project Council Work Session December 15, 2010 6:30 P.M. Estimated Project Costs $21SAN $6 1 u15,= Proposed Roadway Bump Outs Pedestrian Existing & Planned .. .,` S Total 145' Street: Diamond Path to Shannon Parkway $205,000 145' Street: Shannon Parkway to Chippendale Avenue $175,000 ffi801000 Shannon Parkway: 145"' Street to CSAH 42 $170,000 Total $ Ro4rtue ° valance 2011, Annual Deposit $120,000 $120,000 Diamond Path: Engfneenng $25,000 $95,000 2012 Annual Deposit $120,000 $215,000 Diamond Path: Onshuttfon $126,000 $89,000 2013 Annual Deposit $120,000 $209,000 2014 Annual Deposit $120,000 $329,000 2015 Annual Deposit $120,000° $449,000 2016 Annual Deposit $120,000 $569,000 Proposed Schedule Complete Feasibility Report January 2011 Complete Final Plans March 2011 Receive Bids March 2011 ;IrpArovement5.Hearings & April /May 2011 edl,ASSessment Hearings � Awfli'd Bid June 2011 instruction June 2011 ntial Completi on August 2011 Proposed Schedule: Valley Oak Neighborhood Only Complete Feasibility Report January 2011 Complete Final Plans March 2011 Receive Bids March 2011 yements Hearing & April 2011 ecjaf - lssessment Hearing Award Bid May 2011 in instruction June 2011 idistantial Completion July 2011 ffi801000 on August 2011 Proposed Schedule: Valley Oak Neighborhood Only Complete Feasibility Report January 2011 Complete Final Plans March 2011 Receive Bids March 2011 yements Hearing & April 2011 ecjaf - lssessment Hearing Award Bid May 2011 in instruction June 2011 idistantial Completion July 2011 May 2011 in instruction June 2011 idistantial Completion July 2011 Questions /Comments?