HomeMy WebLinkAbout6.e. Set Public Improvement Hearing/Declare Costs/Set Assessment Hearing - 2010 Street Improvements Project #428�tI�OSEMOUt4T EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: May 4, 2010
AGENDA ITEM: Set Public improvement Hearing /Declare
Costs /Set Assessment Hearing -2010
AGENDA SECTION:
Street Improvements Project, City Project
Consent
#428
PREPARED BY: Andrew J. Brotzler, PE, Director of i
AGENDA NO.
Works /City Engineer
ATTACHMENTS: Resolutions; Map; Project Cost and
APPROVED BY:
Funding Summary;
RECOMMENDED ACTION: 1) Motion to Adopt a Resolution Setting a Public Hearing for
Improvements on the Proposed 2010 Street Improvements Project, City Project #428
And
2) Motion to Adopt a Resolution Declaring Costs to be Assessed and Ordering Preparation
of Proposed Assessment and Calling for Hearing on the Proposed Assessment for the
2010 Street Improvements Project, City Project #428.
BACKGROUND:
On December 15, 2009 the Rosemount City Council received the Feasibility Report for the 2010 Street
Improvements Project. This project has been designated as City Project #428. A full presentation of the
Feasibility Report and the proposed improvements contained within will be made at the Public Hearing.
A brief review of the proposed improvements and funding follows.
1. LOCATION AND PROPOSED IMPROVEMENTS
The 2010 Street Improvement Program Project includes surface improvements to approximately 47,500
feet (9.0 miles) of urban local streets in the Country Hills neighborhoods. Additionally, surface
improvements and roadway rehabilitation is also proposed to approximately 8250 feet (1.56 miles) of
Shannon Parkway. In addition to the proposed street improvements, the replacement of existing trails
and addition of trails in accordance with the city's adopted trail and sidewalk plan will be reviewed.
The attached location map illustrates the proposed project area.
2. ESTIMATED COSTS AND FUNDING
The total estimated project cost for the 2010 Street Improvement Project is $2,487,216.01. The project
is proposed to be funded as follows:
G: \ENGPROJ \428 \05042010 CC SetPH- DeclareCostAssessment.doc
Street CIP Fund
$ 602,751.10
Municipal State Aid
$ 1,061,205.55
Trail /Sidewalk Fund
$ 390,956.44
Special Assessments
$ 422,761.08
Storm Utility Fund
$ 9.541.85
$ 2,487,216.01
SUMMARY:
Staff recommends Council adoption of a resolution setting the public hearing for the 2010 Street
Improvements Program Project, City Project #428 for May 18, 2010. Additionally, Staff recommends as a
separate action, Council adoption of a resolution declaring the costs to be assessed and setting a public
assessment hearing for City Project #428 for May 18, 2010.
OA
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2010 -
A RESOLUTION SETTING A PUBLIC HEARING FOR IMPROVEMENTS
ON THE PROPOSED 2010 STREET IMPROVEMENTS PROJECT
CITY PROJECT #428
WHEREAS, the feasibility report for the 2010 Street Improvements Project, City Project #428 was
received and plans and specifications were ordered on December 15, 2009; and
WHEREAS, the plans and specifications were approved and the advertisement for bids were
authorized on April 6, 2010; and
WHEREAS, the statute provided that no such improvements shall be made until the Council has
held a public hearing on such improvements following mailed notice and two publications thereof in
the official newspaper stating time and place of the hearing, the general nature of the improvement,
the estimated costs thereof, and the area proposed to be assessed, in accordance with the law.
NOW THEREFORE IT BE RESOLVED, by the City Council of the City of Rosemount that the
public hearing be scheduled to consider City Project #428, 2010 Street Improvements Project, to be
held on Tuesday, May 18, 2010 at 7:30 o'clock p.m. or as soon thereafter as possible, in the Council
Chambers of the City Hall and that the publication of notice thereof is hereby approved and ratified.
ADOPTED this 4' day of May, 2010.
William H. Droste, Mayor
ATTEST:
Amy Domeier, City Clerk
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2010 -
A RESOLUTION DECLARING COST TO BE ASSESSED AND ORDERING
PREPARATION OF PROPOSED ASSESSMENT, AND CALLING
FOR HEARING ON THE PROPOSED ASSESSMENT
2010 STREET IMPROVEMENTS PROJECT
CITY PROJECT #428
WHEREAS, a hearing has been scheduled for the 2010 Street Improvements Project and the estimated
construction cost for such improvement is $2,052.461.56, and the estimated expenses to be incurred in the
making of such improvements amount to $434,754.45 so that the total cost of the improvement will be
$2,487,216.01.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of Rosemount, Minnesota:
1. The portion of the cost of such improvement to be paid by the City is hereby declared to be
$2,064,454.93. The portion of the cost to be assessed against benefited property owners is declared
to be $422,761.08.
2. Assessments shall be payable in equal annual installments extending over a period of 10 years, the
first of the installments to be payable with general taxes for the year 2011, and shall bear interest at
the rate of 2% points per annum above the interest rate paid by the City for its bonds from date of
the adoption of the assessment resolution, or 2% over our financial consultant's estimated true
interest cost (TIC) for a 10 -year bond transaction for the City of Rosemount issued in April /May of
this year.
3. The City Clerk, with the assistance of the City Engineer shall forthwith calculate the proper amount
to be specially assessed for such improvement against every assessable lot, piece or parcel of land
within the district affected, without regard to cash valuation, as provided by law, and she shall file a
copy of such proposed assessment in her office for public inspection; and
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
A hearing shall be held on Tuesday, May 18, 2010 in the Council Chambers at 7:30 p.m. or as soon
thereafter as possible, to pass upon such proposed assessment and at such time and place all persons
owning property affected by such improvement will be given an opportunity to be heard with
reference to such assessment.
2. Publication by the City Clerk notice of the hearing on the proposed assessment once in the official
newspaper at least two weeks prior to the hearing, stating in the notice the total cost of the
improvement is hereby approved and ratified. Mailed notice to the owner of each parcel described
in the assessment roll not less than two weeks prior to the hearings is also approved and ratified.
Resolution 2010 -
BE IT FURTHER RESOLVED by the City Council of Rosemount, Minnesota:
The owner of any property so assessed may, at any time prior to certification of the assessment to
the County Auditor, pay the whole of the assessment on such property, with interest accrued to the
date of payment, to the City, except that no interest shall be charged if the entire assessment is paid
within 30 days from the adoption of the assessment. The owner may at any time thereafter, pay to
the County Auditor the entire amount of the assessment remaining unpaid, with interest accrued to
December 31 of the year in which such payment is made. Such payment must be made before
November 15 or interest will be charged through December 31 of the succeeding year.
ADOPTED this 4`h day of May, 2010.
ATTEST:
Amy Domeier, City Clerk
E
William H. Droste, Mayor
Funding Calculations with Alternates 2 -4 & 10
Street Capital Improvement Fund
Funded
Subtracted
Country Hills Surface Improvements
$831,615.12
Country Hills 1 st - 8th Addition Assessments
$290,321.72
Le Foret Surface Improvements
$50,722.80
Le Foret Assessments
$17,752.98
Connemara Trail Surface Improvements T
$28,487.88
Total Fundinul
$602,751.10
Special Assessments
Overlay Assessments
$306,167.74
Le Foret Overl2j Assessments
$17,752.98
Shannon Parkway School Overlay Assessment
$8,565.77
Shannon Parkway Rehabilitation Assessment
$90,274.59
Total Fundingi
$422,761.08
Municipal State Aid Fund
Shannon Parkway Surface Improvements
$247,021.20
Shannon Parkway Surface Improvements - Assessments
$15.846.02
Shannon Parkway School Surface Improvements
$48,947.28
Shannon Parkway School Surface Improvements - Assessments
$8,565.77
Shannon Parkway Rehabilitation Improvements
$411,212.82
Shannon Parkway Rehabilitation Improvements - Assessments
$90,274.59
Shannon Parkway Turn Lane
$212,435.10
Shannon Parkway Turn Lane Storm Sewer 81 %)
$40,678.40
Alternate 2: Shannon Parkway Pedestrian Improvements
(137th Street - Evermoor Parkway)
$105,353.38
Alternate 3: Connemara Trail Pedestrian Improvements
(Diamond Path to Shannon Parkway)
$87,356.25
Alternate 10: Driver Feedback Sin Solar Powered
$22,887.50
Total Fundingl
$1,061,205.55
Storm Utility Fund
Shannon Parkxv, ,_ Turn Lane Storm Sewer (19 %)
$9,541.85
Total Fundingi
$9,541.85
Trail /Sidewalk Improvements Fund
Local Pedestrian Improvements
1 $304,357.69
Alternate 4: Delta Avenue Pedestrian Im rovements 1
$86,598.75
Total Fundin
$390,956.44
Total Proj ect Fundingl
$2,487,216.01
Cost Calculations
Base Bid
$2,185,020.14
Alternate 2: Shannon Parkway Pedestrian Improvements
137th Street - Evermoor Parkway)
$105,353.38
Alternate 3: Connemara Trail Pedestrian Improvements
Diamond Path to Shannon Parkway)
$87,356.25
Alternate 4: Delta Avenue Pedestrian Improvements
$86,598.75
Alternate 10: Driver Feedback Sin Solar Powered
$22,887.50
Total Fundingl
$2,487,216.01
4�1
n
0-
— MCANOREWS R C ID w -- __LJ — Q
04N
&
c / ^\ \�
127 C W \
=NOR
film
c�
NNON PARKWAY 1
N LANE IMPROVFf
CORMACK UR h
CaucHloy,
(L
h
131S ST W
=Lio
a
0 550
1100
LEGEND
OVERLAY IMPROVEMENTS
REHABILITATION IMPROVEMENTS
SIDEWALK/TRAIL IMPROVEMENTS
2010 STREET IMPROVEMENT WSB Project No01668 -93 December 152009
As 701 Xenia Avenue
poliUth, Nude 16 PROJECT
Minneapolis. MN 55416
www.wsbong.corn PROPOSED IMPROVEMENTS Figure Number
OOROSEMOUNT
��.. _. � TQ351,d8W.Fu 78351,.,100
INFlLISIRUCRIRE ENGINES JNG RING CONSTRUCTION MINNESOTA.
K: \01688- 93 \Cad\Exhdm,FIG_1 Councn.mvg. Layout