HomeMy WebLinkAbout6.q. Payment #6 and Final - County Road 73 Improvements, City Project #399IN(C-)ISEMOLINT EXECUTIVE SUMMARY
CITY COUNCIL
City Council Meeting: December 21, 2010
AGENDA ITEM: Payment #6 & Final — County Road 73
AGENDA SECTION:
Improvements, City Project #399
Consent
PREPARED BY: Andrew J. Brotzler, PE, Director of Public
AGENDA NO.
Works / City Engineer
U
ATTACHMENTS: Payment Voucher; Map
APPROVED BY:
RECOMMENDED ACTION: Motion to Approve Payment #6 and Final for the County Road
73 Improvements, City Project #399, to Ryan Contracting Company and Accepting it for
Perpetual Maintenance.
BACKGROUND:
This item is on the agenda to request Payment #6 and Final in the amount of $161,754.74 to Ryan
Contracting Company for the County Road 73 Improvements, City Project #399.
This project included the reconstruction of Akron Avenue (County Road 73) from 145' Street (County
Road 42) to Bonaire Path, including concrete curb and gutter, raised concrete median, bituminous path,
storm sewer, and the installation of trunk watermain from 145th Street to the future intersection of Akron
Avenue and Connemara Trail.
The final construction amount, including all contract changes, of $2,243,828.84 is 4.9% below the
contract amount of $2,358,964.25.
This final pay voucher includes negotiated compensation for additional work identified as necessary during
construction as Work Orders for Minor Extra Work Nos. 3 -8 in the amount to $11,532.34, and an
incentive payment for exceeding minimum pavement density requirements in the amount of $13,389.10.
Work Orders 3 and 4 pertain to storm sewer modifications to eliminate conflicts with existing
underground utilities and the grouting of rip rap to City standards. Work Orders 5 and 7 pertain to
adjustment of existing City watermain valves. Work Order 6 is related to adjustment of a sewer manhole
operated by Metropolitan Council Environmental Services (MCES). And Work Order 8 includes a
deduction in compensation for a pavement message not installed to project specifications — rather than
correct the installation, the contractor chose a reduction in payment. Modification of the pavement
message will be handled by Dakota County as part of their maintenance operations.
All Work Orders included in Pay Voucher No. 6 have been approved by Mn /DOT Estimating and are
anticipated to be eligible for federal funding except for watermain related items.
The construction cost of this project was funded primarily with federal American Recovery and
Reinvestment Act (ARRA) funds in the amount of $2,146,506.35, with additional funds for watermain
improvements in the amount $97,322.49 funded by City water core funds.
G: \ENGPROJ \399 \20101221 CC Payment 6 & Final.doc
SUMMARY:
Staff recommends that Council approve Payment #6 and Final for the project and accept the project for
perpetual maintenance subject to the following conditions.
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes
290.92 requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the
contract have been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year maintenance bond.
2
WSB
- Engineering Planning 'J1 Environmental Construction 701 Xenia Avenue South
& Associates, Inc. Suite 300
Minneapolis, MN 55416
Tel: 763 -541 -4800
December 14, 2010 Fax: 763 -541 -1700
Honorable Mayor and City Council
City of Rosemount
2875 — 145th Street West
Rosemount, MN 55068
Attn: Cindy Dorniden, City of Rosemount
Re: Construction Pay Voucher No. 6 (Final)
County Road 73 Street and Utility Improvements
S.P. 208 - 080 -01 / Minn. Project No. ES 10 ES (027)
Dakota County Project No. 73 -08
City of Rosemount, City Project No. 399
WSB Project No. 1556 -59
Dear Mayor and Council Members:
Please find enclosed the final Construction Pay Voucher No. 6 for the above - referenced project in the amount of
$ 161,754.74.
The final construction amount, including all contract changes, of $2,243,828.84 is 4.9% below the contract
amount of $2,358,964.25.
We recommend that you make final payment in the amount of $161,754.74 for Ryan Contracting Company at
your earliest convenience, conditional upon receipt of the following documents:
1. Satisfactory showing that the contractor has complied with the provisions of Minnesota Statutes 290.92
requiring withholding state income tax.
2. Evidence in the form of an affidavit that all claims against the contractor by reasons of the contract have
been fully paid or satisfactorily secured.
3. Consent of Surety to Final Payment certification from the contractor's surety.
4. Two -year Maintenance Bond (warranty start date to coincide with the date Council approves final
payment).
Please contact me at 763- 287 -7173 if you have any questions or comments regarding the attached information.
Thank you.
Sincerely,
WSB & Associates, Inc.
Morg Da ey, E
Proje ana r
Enclosures
Minneapolis ❑ St. Cloud
Equal Opportunity Employer
Ms. Karen Kill
March 31, 2010
Page 2
cc: Andy Brotzler, City of Rosemount
Thomas Ryan, Ryan Contracting Co. tsf
A&
WSB
car Associates, Inc.
Owner: City of Rosemount
2875145th Street West
Rosemount, MN 55068 -4941
For Period: 9/1/2010 to 12/14/2010
Contractor: Ryan Contracting Co.
26350 France Avenue
Elko, MN 55020
Pay Voucher
Rsmt - CR 73 Improvements
Client Contract No.:
Project No.: 01556 -59
Client Project No.: 399
Date: 12114/2010
Request No.: 6 & FINAL
Project
Summary
1
Original Contract Amount
$2,358,964.25
2
Contract Changes - Addition
$37,167.25
3
Contract Changes - Deduction
($500.00)
4
Revised Contract Amount
$2,395,631.50
5
Value Completed to Date
$2,243,828.84
6
Material on Hand
$0.00
7
Amount Earned
$2,243,828.84
8
Less Retainage
$0.00
9
Subtotal
$2,243,828.84
10
1 Less Amount Paid Previously
$2,082,074.10
11
Liquidated Damages
$0.00
12
JAMOUNT DUE THIS PAY VOUCHER NO.6 & FINAL
$161,754.74
I HEREBY CERTIFY THAT A FINAL EXAMINATION HAS BEEN MADE OF THE ABOVE NOTED CONTRACT, THAT THE CONTRACT HAS
BEEN COMPLETED, THAT THE ENTIRE AMOUNT OF WORK SHOWN IN THE FINAL VOUCHER HAS BEEN PERFORMED AND THE
TOTAL VALUE OF THE WORK PERFORMED IN ACCORDANCE WITH, AND PURSUANT TO, THE TERMS OF THE CONTRACT IS AS
SHOWN IN THIS FINAL VOUCHER.
Recommended for Approval by:
WSB &Associates, Inc.
Approved by Contractor:
Ryan Contracting Co.
Specified Contract Completion Date:
11/24/2010
Comment:
Approved by:
Project Manager
Construction Observer:
Approved by Owner:
City of Rosemount
Date:
Approved by:
Dakota County
Page 1 of 6
Project Material Status
Item No. I Item Description Units Unit Price I Contract Quantity I Quantity to Date I Current Quantity I Amount to Date
Base Bid
1
2021.501
MOBILIZATION
LUMP SUM
$170,000.00
1
1
0
$170,000.00
2
2031.501
FIELD OFFICE TYPE D- MODIFIED
EACH
$10,000.00
1
1
0
$10,000.00
3
2101.502
CLEARING
TREE
$100.00
1
0
0
$0.00
4
2101.507
GRUBBING
TREE
$50.00
1
0
0
$0.00
5
2104.501
REMOVE CONCRETE CULVERT
LIN FT
$4.00
231
108
0
$432.00
6
2104.501
REMOVE METAL CULVERT
LIN FT
$2.001
143
179
0
$358.00
7
12104.501
REMOVE CURB AND GUTTER
LIN FT
$3.00
76
120
0
$360.00
8
2104.501
REMOVE WATERMAIN
LIN FT
$10.00
49
30
0
$300.00
9
2104.505
REMOVE BITUMINOUS PAVEMENT (P)
SQ YD
$2.00
1602
1559.8
0
$3,119.60
10
2104.507
REMOVE RIPRAP
CU YD
$2.00
25
25
0
$50.00
11
2104.509
REMOVE VEHICULAR GATE
EACH
$100.00
1
1
0
$100.00
12
2104.509
REMOVE CONCRETE APRON
EACH
$100.00
7
4
0
$400.00
13
2104.509
REMOVE METAL APRON
EACH
$20.00
8
2
0
$40.00
14
2104.509
REMOVE SIGN TYPE C
EACH
$25.00
13
9
0
$225.00
15
2104.509
REMOVE MAIL BOX SUPPORT
EACH
$35.00
1
1
0
$35.00
16
2104.511
SAWING CONCRETE PAVEMENT (FULL DEPTH)
LIN FT
$30.00
3
0
0
$0.00
17
2104.513
SAWING BITUMINOUS PAVEMENT (FULL DEPTH)
LIN FT
$3.00
156
324
32
$972.00
18
2104.521
SALVAGE WATER MAIN
LIN FT
$10.00
146
66.05
0
$660.50
19
12104.523
SALVAGE GATE VALVE & BOX
EACH
$100.00
2
2
0
$200.00
20
2104.523
SALVAGE HYDRANT & VALVE
EACH
$200.00
3
3
0
$600.00
21
2104.523
1 SALVAGE SIGN TYPE C
EACH
$25.001
4
3
0
$75.00
22
2105.501
COMMON EXCAVATION (P)
CU YD
$2.50
35695
35695
0
$89,237.50
23
2105.507
SUBGRADE EXCAVATION (P)
CU YD
$2.50
27827
27827
0
$69,567.50
24
2105.522
SELECT GRANULAR BORROW (CV)
CU YD
$4.00
26397
17668
0
$70,672.00
25
2105.601
DEWATERING
LUMP SUM
$1.00
1
0
0
$0.00
26
2105.607
EXCAVATION SPECIAL 1 (P)
CU YD
$3.00
4905
4905
0
$14,715.00
27
2105.607
EXCAVATION SPECIAL 2 (P)
CU YD
1 $3.00
5674
5674
0
$17,022.00
28
2105.607
EXCAVATION SPECIAL 3 (P)
CU YD
$3.00
6484
6484
0
$19,452.00
29
2123.610
STREET SWEEPER (WITH PICKUP BROOM)
HOUR
$80.00
60
9.5
5.5
$760.00
30
2130.501
WATER
M GALLONS
$20.00
50
0
0
$0.00
31
2211.503
AGGREGATE BASE (CV) CLASS 5
CU YD
$16.00
10857
9359.58
0
$149,753.28
32
12221.503
AGGREGATE SHOULDERING (CV) CLASS 2
CU YD
$30.00
87
47.85
0
$1,435.50
33
2350.501
TYPE LV 3 WEARING COURSE MIXTURE (C)
TON
$150.00
13
11.05
0
$1,657.50
34
2360.501
TYPE SP 12.5 WEARING COURSE MIXTURE (3,C)
TON
$30.00
9865
7503.4
0
$225,102.00
35
2360.502
TYPE SP 12.5 NON WEARING COURSE MIXTURE (3,B)
TON
$47.50
6058
6246
0
$296,685.00
36
2451.507
GRANULAR BEDDING (CV)
CU YD
$0.01
974.6
0
0
$0.00
37
2501.515
18" RC PIPE APRON
EACH
$400.00
3
3
0
$1,200.00
38
12501.515
24" RC PIPE APRON
EACH
$500.00
1
1
0
$500.00
39
2501.515
33" RC PIPE APRON
EACH
$1,000.00
1
1
0
$1,000.00
40
2501.567
21" SPAN CS SAFETY APRON & GRATE DESIGN 3128
EACH
$1,000.00
2
2
0
$2,000.00
41
2501.602
TRASH GUARD FOR 18" PIPE APRON
EACH
$300.00
3
3
0
$900.00
42
2501.602
TRASH GUARD FOR 24" PIPE APRON
EACH
$475.00
1
1
0
$475.00
43
2501.602
TRASH GUARD FOR 33" PIPE APRON
EACH
$780.00
1
1
0
$780.00
44
2502.521
4" TP PIPE DRAIN
LIN FT
$10.00
20
18
0
$180.00
45
2502.541
4" PERF PE PIPE DRAIN
LIN FT
$5.00
3506
1080
0
$5,400.00
46
2503.511
15" CP PIPE SEWER (SMOOTH)
LIN FT
$18.00
370
370
0
$6,660.00
47
2503.521
22" SPAN RC PIPE -ARCH SEWER CLASS IIA
LIN FT
$50.00
149
157
0
$7,850.00
48
2503.541
15' RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$23.00
3680
3719
137
$85,537.00
49
2503.541
18" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$25.001
1369
1324
0
$33,100.00
50
2503.541
21" RC PIPE SEWER DESIGN 3006 CLASS III
I LIN FT
$27.001
318
313
0
$8,451.00
Page 2 of 6
Item
No.
Item
Description
Units
Unit Price
Contract
Quantity
Quantity to
Date
Current
Quantity
Amount to Date
51
2503.541
24" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$29.00
1293
1293
0
$37,497.00
52
2503.541
24" RC PIPE SEWER DESIGN 3006 CLASS V
LIN FT
$48.00
243
253
0
$12,144.00
53
2503.541
33" RC PIPE SEWER DESIGN 3006 CLASS III
LIN FT
$56.00
109
127
0
$7,112.00
54
2504.602
CONNECT' TO EXISTING WATER MAIN
EACH
1 $500.00
9
7
0
$3,500.00
55
2504.602
HYDRANT
EACH
$2,500.00
2
2
0
$5,000.00
56
2504.602
INSTALL HYDRANT AND VALVE
EACH
$200.00
3
3
0
$600.00
57
2504.602
INSTALL GATE VALVE AND BOX
EACH
$200.00
1
1
1
$200.00
58
2504.602
INSTALL PLUG
EACH
$200.00
4
2
0
$400.00
59
2504.602
6" GATE VALVE AND BOX
EACH
$1,000.00
21
2
0
$2,000.00
60
12504.602
8" GATE VALVE AND BOX
EACH
$1,300.00
2
2
0
$2,600.00
61
2504.602
12" GATE VALVE AND BOX
EACH
$2,100.00
3
3
0
$6,300.00
62
2504.603
VALVE BOX EXTENSION
LIN FT
$50.00
5.5
5.5
0
$275.00
63
2504.603
HYDRANT RISER
LIN FT
$400.00
4.5
5.5
0
$2,200.00
64
2504.603
INSTALL WATERMAIN
LIN FT
$30.00
146
65.65
0
$1,969.50
65
2504.603
6" WATER MAIN -DUCT IRON CL 52
LIN FT
$28.00
98
97.8
0
$2,738.40
66
2504.603
8" WATER MAIN -DUCT IRON CL 52
LIN FT
$29.00
224
215.3
0
$6,243.70
67
2504.603
12" WATER MAIN -DUCT IRON CL 52
LIN FT
$31.00
1144
1118.5
0
$34,673.50
68
2504.603
16" WATER MAIN -DUCT IRON CL 52
LIN FT
$100.00
19
16
0
$1,600.00
69
2504.604
4" POLYSTYRENE INSULATION
SO YD
$22.00
176
1.8
0
$39.60
70
2504.608
DUCTILE IRON FITTINGS
POUND
$1.50
4765
4415
0
$6,622.50
71
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN G
LIN FT
$165.00
17.4
17.1
0.54
$2,821.50
72
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN SD
LIN FT
$249.00
6.5
5.49
-0.6
$1,367.01
73
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 48 -4020
LIN FT
$165.00
344.5
362.7
37.85
$59,845.50
74
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 541020
LIN FT
$245.00
30.6
31.86
3.671
$7,805.70
75
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 60 -4020
LIN FT
$400.00
9.71
10.23
0.68
$4,092.00
76
2506.501
CONSTRUCT DRAINAGE STRUCTURE DESIGN 72 -4020
LIN FT
$430.00
5.8
4.89
0.29
$2,102.70
77
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL (2'X3')
EACH
$680.00
30
30
0
$20,400.00
78
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 1
EACH
$9,000.00
1
1
0
$9,000.00
79
2506.502
CONSTRUCT DRAINAGE STRUCTURE DESIGN SPECIAL 2
EACH
$3,000.00
1
1
0
$3,000.00
80
2506.516
CASTING ASSEMBLY
EACH
$500.00
117
120
0
$60,000.00
81
2506.522
ADJUST FRAME & RING CASTING
EACH
$300.00
11
0
0
$0.00
82
2506.602
RECONSTRUCT MANHOLES
EACH
$300.00
16
9
0
$2,700.00
83
2506.602
CONNECT INTO EXISTING DRAINAGE STRUCTURE
EACH
$300.00
1
1
0
$300.00
84
2506.602
CONNECT INTO EXISTING STORM SEWER
EACH
$300.00
4
4
0
$1,200.00
85
2511.501
RANDOM RIPRAP CLASS IV
CU YD
$80.00
120
230.56
0
$18,444.80
86
2511.515
GEOTEXTILE FILTER TYPE IV
SO YD
$2.00
206
149
0
$298.00
87
2521.501
4" CONCRETE WALK
SO FT
$2.25
49166
48072
0
$108,162.00
88
2521.511
2.5" BITUMINOUS WALK
SO FT
$2.00
77865
75995
0
$151,990.00
89
2531.501
CONCRETE CURB & GUTTER DESIGN 8418
LIN FT
$10.00
19834
19698
0
$196,980.00
90
2531.501
CONCRETE CURB & GUTTER DESIGN 8618
LIN FT
$20.00
28
22
0
$440.00
91
2531.507
6" CONCRETE DRIVEWAY PAVEMENT
SO YD
$50.00
51
20
0
$1,000.00
92
2531.618
TRUNCATED DOMES
SO FT
$30.001
224
384
0
$11,520.00
93
2540.602
MAILBOX SUPPORT
EACH
$150.00
1
1
0
$150.00
94
2545.523
2" NON - METALLIC CONDUIT
LIN FT
$2.00
1720
1648
0
$3,296.00
95
2550.602
INSTALL HANDHOLE
EACH
$300.00
4
3
0
$900.00
96
12550.603
INSTALL CONDUIT
LIN FT
$3.00
2000
1427.51
0
$4,282.50
97
2554.505
PERMANENT BARRICADES
LIN FT
$30.00
248
248
0
$7,440.00
98
2563.601
TRAFFIC CONTROL
LUMP SUM
$10,000.001
1
1
0.25
$10,000.00
99
2564.531
SIGN PANELS TYPE SPECIAL
SO FT
$30.00
42.38
42.38
0
$1,271.40
100
2564.5311
SIGN PANELS TYPE C
SO FT
$29.50
385.83
385.83
0
$11,381.99
Page 3 of 6
Item No.
Item
Description
Units
101
2564.537
INSTALL SIGN TYPE C
EACH
102
2564.550
DELINEATOR TYPE X4 -6
EACH
103
2564.552
HAZARD MARKER X4 -2
EACH
104
2564.554
SNOW PLOW MARKER X4 -5
EACH
105
2573.502
SILT FENCE, TYPE HEAVY DUTY
LIN FT
106
2573.530
STORM DRAIN INLET PROTECTION
EACH
107
2573.602
CULVERT PROTECTION
EACH
108
2575.501
SEEDING
ACRE
109
2575.502
SEED MIXTURE 250
POUND
110
2575.502
SEED MIXTURE 310
POUND
111
2575.502
SEED MIXTURE 350
POUND
112
2575.505
SODDING TYPE LAWN
SQ YD
113
2575.511
MULCH MATERIAL TYPE 1
TON
114
2575.511
MULCH MATERIAL TYPE 3
TON
115
2575.519
DISK ANCHORING
ACRE
116
2575.523
EROSION CONTROL BLANKETS CATEGORY 3
SQ YD
117
2575.532
FERTILIZER TYPE 2
POUND
118
2575.532
FERTILIZER TYPE 4
POUND
119
2582.501
PAVEMENT MESSAGE (LEFT ARROW) PAINT
EACH
120
2582.501
PAVEMENT MESSAGE (RIGHT ARROW) PAINT
EACH
121
2582.501
PAVEMENT MESSAGE (RR XING) PAINT
EACH
122
2582.501
PAVEMENT MESSAGE (LEFT ARROW) POLY PREFORM
EACH
123
2582.501
PAVEMENT MESSAGE (RIGHT ARROW) POLY PREFORM
EACH
124
2582.501
PAVEMENT MESSAGE (RR XING) POLY PREFORM
EACH
125
2582.502
4" SOLID LINE WHITE -PAINT
LIN FT
126
2582.502
24" STOP LINE WHITE -PAINT
LIN FT
127
2582.502
4" SOLID LINE YELLOW -PAINT
LIN FT
128
2582.502
24" SOLID LINE YELLOW -PAINT
LIN FT
129
2582.502
4" DOUBLE SOLID LINE YELLOW -PAINT
LIN FT
130
2582.502
4" SOLID LINE WHITE -EPDXY
LIN FT
131
2582.502
24" STOP LINE WHITE -EPDXY
LIN FT
132
2582.502
4" SOLID LINE YELLOW -EPDXY
LIN FT
133
2582.502
24" SOLID LINE YELLOW -EPDXY
LIN FT
134
2582.502
4" DOUBLE SOLID LINE YELLOW -EPDXY
LIN FT
Unit Price
Contract Quantity
Quantity to Date
Current Quantity
Amount to Date
$100.00
4
4
0
$400.00
$85.00
8
14
0
$1,190.00
$65.00
4
4
0
$260.00
$75.00
3
3
0
$225.00
$1.65
7306
7725
1541
$12,746.25
$300.00
107
100
19
$30,000.00
$300.00
2
2
0
$600.00
$75.00
8.9
9.11
0
$683.25
$2.00
494
492.8
0
$985.60
$14.00
56
45.1
0
$631.40
$4.00
93
128.45
0
$513.80
$5.00
386
708
708
$3,540.00
$100.00
13.5
14.08
0
$1,408.00
$100.00
3.6
4.14
0
$414.00
$65.00
8.5
9.11
0
$592.15
$1.00
3412
2541
0
$2,541.00
$0.40
1412
1408
0
$563.20
$0.40
215
248.4
0
$99.36
$35.00
17
0
0
$0.00
$35.00
16
0
0
$0.00
$175.00
2
0
0
$0.00
$250.00
17
17
0
$4,250.00
$250.00
16
16
0
$4,000.00
$1,000.00
2
2
2
$2,000.00
$0.10
11524
0
0
$0.00
$1.50
45
0
0
$0.00
$0.10
9979
0
0
$0.00
$1.50
463
0
0
$0.00
$0.10
1849
0
0
$0.00
$0.22
11524
111701
0
$2,457.40
$7.00
45
116
0
$812.00
$0.22
9979
5305
0
$1,167.10
$5.00
463
127
0
$635.00
$0.44
1849
1185
0
$521.40
Totals For Section Base Bidl
$2,207,161.59
Backsheet1
135 2105.605 1 ERODIBLE ACRE WITHHOLDING
JACRE
1 ($3,000.00)
01
01 0
$0.00
Totals For Backsheet 1:
1 $0.00
Backsheet2
146 193677
1 PAVEMENT DENSITY INCENTIVE
I LUMP SUM
1 $13,389.10
11
11 1
$13,389.10
Totals For Backsheet 2:
$13,389.10
Work Order 1
136 194709
1 STORM LINE 5,037 TO 5,037A
LUMP SUM
1 $11,147.751
1 1
11 0
$11,147.75
Totals For Work Order 1:
$11,147.75
Work Order 2
137 194710
1 MOD EXISTING STORM 75
LUMP SUM
1 $998.061
11
11 0
$998.06
Totals For Work Order 2:
$998.06
Work Order 3
138 94894
1 STORM LINE 5037 TO 5036
ILUMPSUMI
$1,497.711
11
11 1
$1,497.71
Totals For Work Order 3:
$1,497.71
Page 4 of 6
Item No. I Item Description Units Unit Price I Contract Quantity IQuantitytoDate I Current Quantity jAmounttoDate
Work Order 4
139
94896
STORM STRUCTURE MODS 5021, 5024, 5018, 5016
1 LUMP SUM
1 $750.00
1
1
1
$750.00
140
194897
GROUTED RIPRAP
I LUMP SUM
1 $3,433.731
1
1
1
$3,433.73
Totals For Work Order 4:
$4,183.73
Work Order 5
141 194899 1 ADJUST GATE VALVE BOX LUMP SUM 1 $3,850.001 1 1 1 1 1
$3,850.00
Totals For Work Order 5:
$3,850.00
Work Order 6
142 194900 1 INSTALL AND ADJUST CASTING I LUMP SUM 1 $1,047.111 1 1 1
$1,047.11
Totals For Work Order 6:
$1,047.11
Work Order 7
143 194902 1 ALIGN GATE VALVE BOX LUMP SUM 1 $1,053.79 11 1
1 $1,053.79
Totals For Work Order 7:
$1,053.79
Work Order 8
144
2582.501
PAVEMENT MESSAGE (RR XING) POLY PREFORM
I EACH
1 ($1,000.00)
21
21
2
($2,000.00)
145
2582.501
PAVEMENT MESSAGE (RR XING) POLY PREFORM
I EACH
1 $750.001
21
21
2
$1,500.00
Totals For Work Order 8:
($500.00)
Project Totals:
$2,243,828.84
Page 5 of 6
Project Payment Status
Owner: City of Rosemount
Client Project No.: 399
Client Contract No.:
Project No.: 01556 -59
Contractor: Ryan Contracting Co.
Contract Chances
No.
Type
Date
Description
Amount
BK1
Backsheet
5/28/2010
Erodible Acres Back sheet
$0.00
W01
Work Order
7/30/2010
Storm Line 5,037 to 5,037A
$11,147.75
W02
Work Order
7/30/2010
Modification to an Existing Storm Structure 75
$998.06
W03
Work Order
12/13/2010
Storm line from 5037 to 5036
$1,497.71
W04
Work Order
12/13/2010
Modify storm struct 5021, 5024, 5018, 5016; Grout riprap 5013, 5085A, 5095
$4,183.73
W05
Work Order
12/13/2010
Adjust gate valve boxes
$3,850.00
W06
Work Order
12/13/2010
Install and adjust casting
$1,047.11
W07
Work Order
12/13/2010
lAlign gate valve box
$1,053.79
W08
lWork Order
12/13/2010
Pavement message (RR Crossing) cost adjustment
($500.00)
BK2
113acksheet
12/13/2010
Paving density incentive
$13,389.10
Change Order Totals:
$36,667.25
Pavment Summary
No.
From
Date
To Date
Payment
Total
Payment
Retainage Per
Payment
Total
Retainage
Total Payment +
Retainage
Work Certified
Per Payment
Total Work
Certified
1
4/1/2010
4/30/2010
$355,003.00
$355,003.00
$18,684.37
$18,684.37
$373,687.37
$338,183.54
$338,183.54
2
5/1/2010
5/31/2010
$336,263.99
$691,266.99
$17,698.10
$36,382.47
$727,649.46
$378,910.63
$717,094.17
3
6/1/2010
6/30/2010
$319,825.83
$1,011,092.82
$16,832.94
$53,215.41
$1,064,308.23
$347,214.06
$1,064,308.23
4
7/1/2010
7/31/2010
$595,849.79
$1,606,942.61
$31,360.52
$84,575.93
$1,691,518.54
$627,210.31
$1,691,518.54
5
8/1/2010
8/31/2010
$475,131.49
$2,082,074.10
$25,006.92
$109,582.85
$2,191,656.95
$500,138.41
$2,191,656.95
6 &
FINAL
9/1/2010
12/14/2010
$161,754.74
$2,243,828.84
($109,582.85)
$0.00
$2,243,828.84
$52,171.89
$2,243,828.84
Payment Totals:
$2,243,828.84
$0.001
$2,243,828.841
1 $2,243,828.84
Project Summary
Material On Hand:
Total Payment to Date:
Total Retainage:
Total Amount Earned:
$0.00
$2,243,828.84 Original Contract:
$0.00 Contract Changes:
$2,243,828.84 Revised Contract:
Page 6 of 6
$2,358,964.25
$36,667.25
$2,395,631.50