Loading...
HomeMy WebLinkAbout6.g. 2011 Schedule of Rates and FeesRosEMOUNTEXECUTIVE SUMMARY CITY COUNCIL City Council Regular Meeting: December 21, 2010 AGENDA ITEM: 2011 Schedule of Rates and Fees AGENDA SECTION: Consent PREPARED BY: Amy Domeier, City Clerk Department Directors AGENDA NO. ATTACHMENTS: Draft Resolution APPROVED BY: RECOMMENDED ACTION: Motion to Adopt a Resolution Approving Amendments setting the 2011 Schedule of Rates and Fees. SUMMARY The fee schedule is updated on a yearly basis upon review of frequent fees established by City departments. The common fees issued by all City departments are included in the fee resolution. Staff and financial consultant, Jessie Hart of Springsted and Associates, have worked together to establish baseline charges that include work sheets of staff time involved for each fee. After review, fees are changed as reflected in the attached resolution. The proposed amendments are noted with editing marks. The fee schedule for Parks and Recreation Fees including the rental of the Community Center and Steeple Center will be presented at a later meeting. The Parks Commission is still reviewing and determining the proposed fees for 2011. SUMMARY Staff recommends the approval of the above - motion. CITY OF ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2010 - A RESOLUTION APPROVING AMENDMENTS SETTING THE 2011 SCHEDULE OF RATES AND FEES WHEREAS, the City of Rosemount annually conducts a User Fee Study in order to establish logical and defensible fees for the City of Rosemount; and WHEREAS, the City of Rosemount has found certain fees and rates in need of adjustments. THEREFORE, NOW BE IT RESOLVED by the City Council of the City of Rosemount that it adopts the attached Schedule of Rates and Fees for 2011. ADOPTED this 21" day of December, 2010 by the City Council of the City of Rosemount. William H. Droste, Mayor ATTEST: Amy Domeier, City Clerk RESOLUTION 2010- SCHEDULE OF RATES AND FEES FOR 2011 Planning and Zoning Review Fees Page 1 Public Works and Engineering Fees Page 3 Administration Fees Page 12 Fire Prevention Permits and Fees Page 14 Police Department Permits and Fees Page 16 Building Permits and Fees Page 17 Building Value Range Fees — Exhibit A Page 22 Residential Building Valuations — Exhibit B Page 23 Table A -33B Grading Plan Review Fees — Exhibit C Page 24 Parks and Recreation Fees Page 25 Community Center and Arena Page 25 Outdoor Facilities Page 31 Park Dedication Fees Page 33 PLANNING AND ZONING REVIEW FEES Administrative Appeals Affidavits - Certificate of Authenticity Appeal of Planning Commission Decisions to the City Council RESOLUTION 2010- $250.00 $60.00 $150.00 City Staff Billing For applications that include excessive staff time, services performed by City personnel will be billed at actual payroll costs including hourly rate, all payroll taxes and benefit charges. Services provided by City consultants will be billed at the current consultant rates. Comprehensive Guide Plan Amendment Application Fee Conditional Use Permit Documents - 2030 Comprehensive Guide Plan Comprehensive Stormwater Management Plan Zoning Ordinance and Subdivision Ordinance Zoning Map Black and White Color —11" x 17" Color — 24" x 36" $3,000.00 $1,000.00 $60.00 + tax $92.00 + tax Same as City -wide document fee $5.00 + tax $10.00 + tax $25.00 + tax Environmental Assessment Worksheets $1,800.00 Escrow fee for City Consultant Services. Applicant will be responsible $10,000.00 for actual costs incurred by the city. Interim Use Permits for Seasonal Sales of Christmas Trees For $40.00 Periods of Less than 40 Days Per Calendar Year All Other Interim Use Permits $500.00 Joint Applications A planned unit development that includes a subdivision may have the fee waived for a preliminary plat at the discretion of the Community Development Director. Mineral Extraction Permit Application Fee Annual Fee Surety Bond $700.00 $370.00 $7,500.00 per acre Rental Licensing $25.00 Planned Unit Development Concept Plan Master Development Plan Final Development Plan Major Amendment Minor Amendment Rezoning Signs Permanent Installation Temporary Signs: For permits obtained after placing the sign For permits obtained prior to placing the sign Site Plan Review Subdivision Fees Preliminary Plat Residential Commercial /Industrial Final Plat Lot Split Administrative Plat /Simple Plat Other Subdivision (waiver of subdivision) Lot Combination TIF (Tax Increment Financing) Application Fee Parcel in TIF New TIF District Transmission Facilities Variance Petition Application Fee Zoning Ordinance Text Amendment Fee in Lieu of Tree Dedication 2 RESOLUTION 2010- $2,500.00 +$20 per acre $2,500.00 $2,000.00 $3,000.00 $900.00 $1,500.00 $270.00+ electrical permit $50.00 $10.00 $1,200.00 $2,000.00 + the following: $10.00 per unit $50.00 per acre $1,200.00 $1,400.00 $1,120.00 $800.00 $400.00 $775.00 $1,750.00 $1,000.00 $200.00 $1,800.00 $100.00 per caliper inch of tree replacement PUBLIC WORKS AND ENGINEERING FEES Assessments: RESOLUTION 2010- Street Assessments for Total Reconstruction Projects on existing streets are as follows: Single Family /R -1 Zoned Lot: With Existing Concrete Curb & Gutter $6,000.00 With Existing Bituminous Curb $6,600.00 With Existing Gravel Road Rural and Transitional Residential With existing bituminous With existing gravel road Full Cost of Improvement 35% of Improvement Cost Full Cost of Improvement Street Assessments for Rehabilitation Projects on existing streets are as follows: All Properties 35% of Improvement Cost Street Assessments for Overlay Projects on existing streets are as follows: All Properties 35% of Improvement Cost City Equipment and Staff Rates: Equipment Per hour charge (does not include operator). Equipment charges, including licensed vehicles and mobile equipment, will be calculated as follows: The true cost of the equipment (including annual depreciation, annual insurance premiums, annual license taxes if applicable, annual operating and maintenance expenses, and an annual carrying fee) will be divided by the estimated hours the equipment is expected to be used annually. Public Works Staff -Per hour charge Staff charges for each employee billed will be calculated using the actual hourly rate plus all payroll taxes and benefit charges. Engineering Fees: Administrative Fees: For Chapter 429 or private improvements project charges shall be calculated at 5% of public improvement construction costs. Services provided by City consultants will be billed at the current rates plus 5 percent administrative costs, unless assessed to benefiting property under a 429 project which then excludes the 5 percent. RESOLUTION 2010- Miscellaneous Public Works Fees: As- builts /Record Drawings Electronic Copy X $10.00 + tax Hard Copy 0.50 $20.00 + tax Feasibility Reports = 20.00 $23.34 + tax Geographic Information Systems Fees (GIS) 40 = 20.00 Single family, town homes or multi- family X $60.00 per lot /unit All other - Final Plat 0.50 $120.00 per acre Simple Lot /Parcel split or boundary change = 20.00 $300.00 Right -of -Way Fees & Charges: 50 = 25.00 Renistration Fee X 50 = 25.00 Time X $ Per = Cost 50 Involved Hour ($) (Hour) $200.00 Administration 0.25 X 40 = $ 10.00 Review 0.50 X 40 = 20.00 Recording 0.25 X 40 = 10.00 Total Cost $ 40.00 Registration fee is due annually and is due by January 15"' of the corresponding year. Excavation Permit Fees A) Hole Administration 0.50 X 40 = $ 20.00 Verification 1) Plan Review 2) Inspection a) Location before work b) Compliance during work c) Completion after work d) Re- inspection 3) Mapping a) Review data b) Transfer to Autocad c) Insert to overlay to tie in Total Cost 0 0.50 X 50 = 25.00 0.50 X 40 = 20.00 0.50 X 40 = 20.00 0.50 X 40 = 20.00 0.50 X 40 = 20.00 0.50 X 50 = 25.00 0.50 X 50 = 25.00 0.50 X 50 = 25.00 $200.00 RESOLUTION 2010- Plus $0.20 per lineal foot for each excavation over 1,000 feet B) Emergency Hole Administration 0.50 X 40 = $ 20.00 Inspection after completion 1.50 X X040 = 4&.00$6 0.00 Total Cost $01 85.00 C) Trench Administration 0.50 X 40 Verification 1) Plan Review 1.50 X 50 2) Inspection a) Location before work 0.50 X 40 b) Compliance during work 1.50 X 40 c) Completion after work 1.50 X 40 d) Re- inspection 0.75 X 40 3) Testing Result Review a) Compaction 0.25 X 40 b) Material 0.25 X 40 4) Mapping a) Review data 0.50 X 50 b) Transfer to Autocad 0.50 X 50 c) Insert to overlay to tie in 0.50 X 50 Total Cost The average trench is 330 lin. ft. past the width of a hole. Therefore, the number of 100 lin. ft. (or portion thereof) units is 4. The cost per 100 lin. ft. unit is 360.00 / 4 = $90.00/100' unit. W $ 20.00 $ 75.00 20.00 60.00 = 60.00 30.00 = 10.00 10.00 25.00 = 25.00 25.00 $360.00 RESOLUTION 2010- Obstruction Permit Fee A) Administration 0.50 X 40 = $ 20.00 B) Recording 0.25 X 40 = 10.00 C) Review 0.75 X 50 = 37.50 Minimum Base Coat $ 57.50 Plus additional fee based on length Inspection 1) Compliance during work 1.50 X 40 = $ 60.00 2) Completion after 0.25 X 40 = 10.00 Additional fee on assumed 1000 lin. ft. permit = $ 52.50 Additional cost per lineal foot = $70.00 / 1000 = 0.07 Delay Penalty A) Administration 1.5 X 40 = $ 60.00 For up to 3 days of non - completion and non -prior notice before specified completion date. After 3 days, an additional charge of $20 /day will be levied. Total Penalty Charge = $ 60.00 (Up to 3 days late) Each day late over 3 days Plus 20.001Dav Right of Way /Utility Easement Vacation Fee $775.00 Sidewalk/Trail Snow Removal $75.00 per lot Street Excavation and Curb Cuts Curb Cuts, Driveway Access Permits, Transit Stop Kiosks $180.00 Street Excavation Minimum bond deposit with City $2,000.00 Street & Utility Specifications $23.34 + tax Wetland Notification /Application Form (Deposit for Costs Incurred) $3,175.00 Solid Waste Hauling License $320.00 3 RESOLUTION 2010- ATTACHMENT 1 Water Sanitary Sewer, Storm Water Usage Rates: Water and Sanitary Sewer User Fees Usage -Based on Quarterly Meter Readings Water Use Residential Quarterly usage (gallons) Rates *: 0-10,000 $0.90 10,001 - 30,000 $1.10 30,001 - 60,000 $1.40 >60,000 $1.90 *per thousand gallons Commercial /Industrial Quarterly usage (gallons) Rates *: 0-100,000 $1.05 100,001 - 200,000 $1.30 200,001 - 300,000 $1.60 > 300,000 $2.00 *per thousand gallons Irrigation Meters Rates: Osage for single -fam4 homes with a second meter are added together, then $2.00 /1000 gallons put through the tiers. All other irrigation meters will be charged the flat rate of $2.0011.000 gallons.) Water Fixed Charge $10.00 each account Sanitary Sewer Use $1.50/1000 gallons Sanitary Sewer Fixed Charge $20.00 each account Water Surcharge and Meter Maintenance Per Chart Below (Quarterly) Meter Size Surcharge Meter Maintenance ** Single Family - 5/8" $ 8.80 0 Multi - Family - 5/8" $ 6.80 0 1" ( *) $ 13.50 $ 6.25 1 ' /a" ( *) $ 28.00 $ 11.25 2" ( *) $ 31.50 $ 18.15 2 ' /z" ( *) $ 39.35 $ 22.20 3" ( *) $ 47.00 $ 26.25 4" ( *) $ 70.00 $ 45.00 6" ( *) $154.00 $100.00 8" ( *) $170.00 $130.00 *Commercial, Industrial or Institutional /Commercial and Industrial are taxable * *Meter maintenance applied to Base Fixed Water Charge based on meter size. Sewer Only Users 7 $50.00 per quarter per SAC unit RESOLUTION 2010- Bulk Water $2.00 per 800 gallons + tax Irrigation Meters: Exempt from Sanitary Sewer Usage charges. Pays Water Usage charge, Fixed Water charge by meter size and Surcharge by meter size. QUARTERLY STORM WATER UTILITY FEES Storm Fee Land Use Land Use Description Unit Fee Category 1 Single - family residential, R -1,2, RL, Multi -unit Residential $12-4113.03 residential with individual water meters, R -3,4, Unit Platted /undeveloped, Minimum charge for all parcels 2 Rural residential, Agricultural, RR, AG Lot 3 Parks, Golf Courses, Cemeteries, PK Acre 4 Undeveloped /un- platted Acre 5 Multi -unit residential without individual water Acre meters, Apartments, Churches, Schools, Hospitals, Government Buildings, Mobile Home Parks 6 Commercial, Industrial and Parking Lots, C- Acre 1,2,3,4,IP,IG,PL,WM *Categories 3,4,5, & 6 are subject to the minimum charge of $42. 4113.03. minimum or application of the above rates will be used for the fee. Miscellaneous Utility Charges: Meter Disconnection Charge Meter Reconnection Charge $13.0813.73 $2:662.79* $.4-516* $46:4448.42* $57. 5260.39 The largest of either the $80.00 $80.00 Monthly New Customer List Hard Copy $10.00 + tax Electronic Copy (Must be pre -paid) (Annual Fee Jan. — Dec. — Fee $060.00 will be pro -rated for partial calendar year, by month) Total Customer List 100 copies of black and white letter or legal sized copies; or More than 100 pages and 15 minutes or longer of staff time Electronic format Utility Billing Search /Resident Utility Billing Search /Non- Resident Water Meter Accuracy Check Testing 5/8" — 2# meters Testing 3" meters Testing 4" meters Testing 6" meters 8 $.25 /page + tax Actual costs will be billed + tax $25.00 No Charge No Charge $125.00 $125.00 $125.00 $125.00 RESOLUTION 2010- Water Meter Installation Charges: Water meter charges are the actual cost of meter and appurtenant parts, plus shipping and handling. Charges are subject to change during the year. See the most recent Cost of Water Meter schedule. Water, Sanitary Sewer and Storm Water Capital Charges: Metropolitan Council Environmental Services Availability Charge (Metro SAC) Per Sac Unit, as determined by the MCES $2,40042230.00 City Sanitary Sewer Availability Charges CITY SANITARY SEWER Trunk Area Assessments Per SAC Unit as determined by CHARGES collected with final the MCES and collected with the plat/subd!vision Building Permit agreement Single Family Residential Multi - Family Residential $1,075.00 per acre $1,200.00 Institutional, Commercial and Industrial Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution, prior to connection to the sanitary sewer system. City Water Availability Charges Trunk area assessments collected with final plat /subdivision agreement as follows: All Zoning types $6,500.00 per acre Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution. And Water Access Charge collected with the Building Permit as follows: Single Family Res Multi- Family Res 1" 1 ' /z" 2" 21/2" 3" 4" 6" 8" Meter Meter Meter Meter Meter Meter Meter Meter $2,175.00 $2,175.00 $9,800.00 $14,700.00 $19,600.00 $24,500.00 $29,450.00 $34,350.00 $39,250.00 $44,150.00 Supplemental Water and Sanitary Sewer Connection Charges In addition to other charges imposed at the time of connection to water and sanitary sewer systems, supplemental connection charges, set by reference to the portion of the cost of connection that has been paid by the premises being connected, in comparison with other premises, will be imposed and collected from the properties, and in the amounts, listed below, for each connection made: 9 PID 340201001006 340201001009 344430001001 344430001002 344430002001 344430002002 344430003001 344430003002 344430004001 344430004002 344430005001 344430006001 344430007001 344430008001 344430009001 344430000001 Address 2771-132 nd St. W. 2813-132 nd St. W. 173 CR 42 (2693 132nd Ct. W.) 2694- 132nd Ct. 2685-132 nd Ct. W 2684-132 nd Ct. W 2675 -132nd Ct. W 2686-132 nd Ct. W 2665-132 nd Ct. W 2604-132 nd Ct. W 2655-132 nd Ct. W 2645-132 nd Ct. W 2055 -128`h St. W (2635132 nd Ct W) 2625-132 nd Ct. W 2615 -132nd Ct. W 2605-132 nd Ct. W RESOLUTION 2010- 2010 Supplemental 2010 Supplemental Sewer Water Connection Connection Charges Charges Certified X4,93`1- 3 -SPaid in Full Paid in Full Certified Paid in Full Paid in Full W Paid in Full Paid in Full $4,934.355.107.05 Paid in Full Paid in Full Paid in Full $4;934. 355.107.05 Paid in Full $4- 934- 355,107.05 $4,934.23Y55 10-7.0-5 $4,934. 355,107.05 Paid in Full Paid in Full Paid in Full Paid in Full Paid in Full Paid in Full Paid in Full $5,852- x-76,057.20 Paid in Full $2.376.0 77.20 $5;85?.P6.0 77.20 $5,85?:370,057.20 Paid in Full Paid in Full Paid in Full Such supplemental connection charges shall be increased each calendar year commencing January 1, 2007, by three and one -half percent (3.5 %) from the charges of the preceding year. Storm Water Charges a. For this charge, Newly Developed Properties are defined as any property, including platted or un- platted parcels, which are improved with buildings, grading, or otherwise creating an impervious surface. In addition to the following charges, stormwater ponding fees /credits will be determined at the time of final platting or building permit application. STORMWATER CHARGES Single Family Multiple Family Public /Institutional Trunk Area Assessments to be collected from Developers on all newly developed properties $6,865 per acre* Connection Charges (STAAC) collected with the Building Permit on all Newly Developed properties $770 per lot $290 per housing unit (4 plex = 4 units) $2,270 per acre Commercial and Industrial $2,270 per acre *Acres are defined as gross acres of developable property minus pond acreage (at high water level) and wetlands at delineation line, rounded to the nearest one tenth (1/10`h) of an acre. Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement will be collected as a connection charge, in addition to any other connection charge established by this resolution, prior to issuance of a Certificate of Occupancy for use of any property. 10 RESOLUTION 2010- Connection Charges (STAC) Collected with the Building Permit on all newly developed properties that have not paid trunk area assessments listed above (Gross Area): Single Family $3,050.00 per lot Multiple Family $8,570.00 per acre Public/ Institutional $9,150.00 per acre Commercial $8,515.00 per acre Industrial $8,515.00 per acre Water Tower Antennas Application Fee $2,500.00 Per year rent payments based on 9" panel Type or 3 A whip type antennas and appropriate outside equipment area will be charged at the current yearly rate, which is adjusted annually. Minimum per year lease payment increase 11 5% ADMINISTRATION FEES Adult Use Establishment License Check Return Charge Videotapes Audiotapes Documents The following fees for copies apply to all departments. 100 copies of black and white letter, oi- legal or ledger sized copies: or More than 100 pages and 15 minutes or longer of staff time; or Document that is outsourced RESOLUTION 2010- $3,000.00 $30.00 $5.00 + tat $5.00 + tat $.25 /page + tax $30 /page + tax (for color) Actual costs will be billed + tax Actual costs will be billed + tax Faxed copies are $.50 per page plus tax. If more than 100 pages or if long distance charges apply, actual costs plus tax will be billed to the requester. Mailed copies are charged the applicable document rate and all handling costs plus tax. Large Public Gathering on City Parkland $150.00 Liquor Licenses: On -Sale Intoxicating Class A (Jan 1 -Dec 31) $4,500.00 Class B Qan 1 -Dec 31) $3,000.00 On -Sale Wine $550.00 Off -Sale Intoxicating $200.00 On -Sale 3.2% Malt Quly 1 June 30) $250.00 Off -Sale 3.2% Malt (July 1 June 30) $210.00 Temporary On -Sale Intoxicating $170.00 /event Temporary On -Sale 3.2% Malt $150 /event 12 Special Club On -Sale Intoxicating (Jan 1 -Dec 31) Membership: under 200 between 201 and 500 between 501 and 1,000 between 1,001 and 2,000 between 2,001 and 4,000 between 4,001 and 6,000 more than 6,001 Special Sunday Gan 1 -Dec 31) Bottle Club One -day Bottle Club On Public Premise — Annual License Gan 1 -Dec 31) Per event Amending an Existing Liquor License Background Investigation Fee Massage Therapist License Gan 1 -Dec 31) Peddlers, Solicitors and Transient Merchants Gan 1 -Dec 31) Gambling Permits Annual Billiard Hall or Dance Club License Initial Application Investigation Fee Amendment to Billiard Hall or Dance Club License Annual Arcade Parlor License Initial Application Investigation Fee Amendment to Arcade Parlor License 13 RESOLUTION 2010- $300.00 $500.00 $650.00 $800.00 $1,000.00 $2,000.00 $3,000.00 $250.00 $140.00 $25.00 $350.00 $30.00 $175.00 $1,500.00 $90.00 $90.00 $250.00 $800.00 $500.00 $175.00 $15.00 per location plus $15.00 per machine $500.00 The lesser of $15.00 per location plus $15.00 per machine or $175.00 RESOLUTION 2010- FIRE PREVENTION - PERMITS AND FEES Alarm System Permit/Review As recommended by Value Range - Exhibit A Burning Permit — Commercial $235.00 Day Care Inspection $50.00 Fire Dept. Certificate of Occupancy $965.00 Inspection /Renewal Fee Copies of Fire Dept. Officers Report Same as City -wide document fee Fire Dept. Re- inspection Fee $47.00 Fire Dept. Special and Miscellaneous $130.00 Inspections Copies of Fire Dept. Report Same as City -wide document fee Fire Photo (per copy) $5.00 + tax Fire Video Tape $5.00 + tax Fire Sprinkler Protection System As recommended by Exhibit A. State Surcharge: As recommended by the Minnesota State Code - Section 16B.70 Fuel Tank Installation or Removal: $200.00 Haunted House Operation Permit $880.00 Penalty for Failing to Obtain Permit Penalty for failing to obtain a permit prior to starting work required is two times the regular permit fee established herein. 14 Plan Check Fees: Commercial /Industrial /Multi - family buildings and structures Residential buildings Residential Accessory Structures /additions/ alterations /repairs /remodeling — Pyrotechnic Display of Fireworks Fireworks Sales Firework Retailer Multi -Item Retailer State Surcharge Storage and use of Hazardous Materials Over quantities listed in current Fire Code Edition — Section 4. Permit valid for twelve months maximum Temporary Use of LP Gas 15 RESOLUTION 2010- Sixty -five percent (65 %) of the building permit fee. Sixty -five percent (65 %) of the building permit fee for the new single family dwellings. Sixty -five percent (65 %) of the building permit fee. $300.00 $350.00 $100.0 0 As recommended by the Minnesota State Code- Section 16B.70. $650.00 $100.00 Alarm User Permit Animal Impound Animal Licenses POLICE DEPARTMENT PERMIT AND FEES $0200.00 40.00 $3f�l0l RESOLUTION 2010- Registration Fees OEW be charged for nwnber of months u12 to expiration date of rabies vaccine. Annual fee for spayed and neutered $6.00 (prorated at $.50 /mo.) animals Annual fee for unspayed and un- neutered $12.00 ( 12rorated at $1.00 /mo.) Duplicate Tags $5.00 Applicants 62 year of age or older hall pay fifty percent (SO %) of above stated fees I AnaloWDi ital Audio Tape Copies Background checks Contractual Overtime Contractual Overtime Squad Use (directly involved in contractual serylW Dangerous Dog Registration State authoritied Pawn Shop License Fee: $5.00 (includes taxi $18.78 -�, - tax ($20.00W.00 includes tax) $4-9-.Wf)0.00 per hour $7.00 per hour $300.00 0 -20 pawns a day $1,500.00 yr 21 -40 pawns a day $3,000.00 yr 41 and over pawns a day $5,000.00 yr Initial application includes $1,500.00 deposit for investigation fee as set in City Code Photographs: Traditional copy of photos $10.00 per roll 4-tftm includes tax Color copy of photo $.50 /page 4- tftx4includes tax) Digital copies of photos $.25 /page includes tax) Copies of Police report Video Copies Traditional or Digital Tattoo & Body Piercing Establishments Annual Business License 16 $.25 /page4includes tax) $5.00 Cincludes tax) $250.00 RESOLUTION 2010- Annual Personal Service License $100.00 Pigeons Loft and Fowl Coop $25.00 Renewal $6.00 17 BUILDING PERMITS AND FEES Administrative Handling Fee Building Permits As recommended by Value Range — Exhibit A. As -built Survey Escrow Fee Certificate of Occupancy Inspection and /or change of use Building Department Reports Electrical Permits RESOLUTION 2010- A handling fee of $25.00 will be charged for address and lot changes and for permit and file editing. These changes must be done within thirty (30) days of permit issuance or all prior permit fees will be forfeited (non - refundable). $2,000.00 $58.00 $160.00 /year tax (includes posse) $12.50 /month + tax 1. Minimum fee for each separate inspection of an $40.00 installation, replacement, alteration or repair limited to one inspection only. 2. Administrative fee for each permit $10.00 3. Services, changes or service, temporary services, additions, alterations or repairs on either primary or secondary services shall be computed separately. 0 to 100 ampere capacity $20.00 101 to and including 200 ampere capacity $25.00 For each additional 100 ampere capacity or $8.00 fraction thereof 4. Circuit, installation of, additions, alterations or repairs of each circuit or sub - feeder shall be computed separately, including circuits fed from sub - feeders and including the equipment served except as provided for in Items 4 through 9. 0 to and including 30 ampere capacity $7.00 (maximum number of 1 -30 ampere circuits to be paid on is 30 to any one cabinet) 31 to and including 100 ampere capacity $8.00 For each additional 100 ampere capacity or $5.00 fraction thereof 18 RESOLUTION 2010- In addition to the above fees: A charge of $4.00 will be made for each street lighting standard. A charge of $5.00 will be made for each traffic signal standard. Circuits originating within the standard will not be used when computing fees. In addition to the above fees: All transformers and generators for light, heat and power will be computed separately at $5.00 per unit plus $.25 per KVA up to and including 100 KVA.101 KVA and over will be computed at $.20 per KVA All Transformers for signs and outline lighting shall be computed at $4.00 for the first 500 VA or fraction thereof per unit plus $40.00 for each additional 100 VA or fraction thereof. In addition to the above fees (unless included in the fee filed by the initial installer): Remote control, signal circuits and circuits of less than 50 volts shall be computed at $6.00 pr each ten (10) openings or devices of each system plus $.50 for each additional opening. For review of plans and specifications of proposed installations there shall be a minimum fee of $100.00 up to and including $30,000.00 of electrical estimate, plus 1/10 of one percent (1 %) on any amount in excess of $30,000.00 to be paid by persons or firms requesting review. When re- inspection is necessary to determine whether unsafe conditions have been corrected and such conditions are not subject to an appeal pending before any court, a re- inspection fee of $35.00 may be assessed in writing by the inspector. For inspections not covered herein, or for requested special inspections or services, the fee of $50.00 per man hour, including travel time, plus the standard IRS allowed mileage reimbursement per mile traveled, plus the reasonable cost of equipment or material consumed. This section is also applicable to inspection of empty conduits and such jobs as determined by the City. For inspection of transient projects including, but not limited to carnivals and circuses the inspection fees shall be computed as follows: Power supply units according to item 2 of the fee schedule. A like fee will be required on power supply units at each engagement during the season, except that a fee of $50.00 will be charged for additional time spent by the inspector if the power supply is not ready for inspection at the time and date specified on the Request for Inspection as required by law. Rides, devices or concessions shall be inspected at their first appearance of the season and the inspection fee shall be $35.00 per unit. Fees for services, feeders and circuits operating at over 250 volts shall be doubled those listed in items 3 and 4 above. A $-.-50-S,5.00 State surcharge is to be added to each permit. 19 Grading Permits: All fees are established in Exhibit D Plan review fees are found in Exhibit D State surcharge fee of $-.-50_$_5.00 Bond Required $3,000.00 per disturbed acre: minimum one acre Plan Check Fees: Commercial /Industrial /Multi- family building and structures Residential buildings Residential Accessory Structures Plumbing, Heating, Ventilating, Air conditioning & Refrigeration Fees: Residential (4 or less units) New Construction Alteration /repair Multiple Housing (5 or more units) New Construction Alteration /repair Commercial /Industrial /Institutional New Construction: RESOLUTION 2010- Sixty five percent (65 9/6) of the building permit fee. Sixty -five percent (65 %) of the building permit fee for new single family dwellings /single family additions, alterations, etc., similar plans per state statute 1300.0160 twenty -five percent (25 %) of the building permit fee. Additions /alterations /repairs /remodeling: sixty -five percent (65 %) of the building permit fee. $125.00 $70.00 $100.00 /unit $70.00 /unit 1.5% of valuation plus $.0005 valuation surcharge $215.00 minimum fee plus $.0005 valuation surcharge Commercial/ Industrial/ Institutional/ Public: Set fee of $75.00 for project valued under $3,500.00 which requires one inspection. Set fee of $125.00 for project valued under $3,500.00 which requires two inspections. For projects valued over $3,500.00, 1.5% of the value of the project, with a minimum fee of $215.00. Plus $.0005 valuation surcharge for all projects. Pill RESOLUTION 2010- Sewer and Water Installation Permit Fees: Municipal Service — residential (4 or less units) $55.00 Municipal Service — 1.5% of valuation plus $.0005 valuation commercial /industrial /institutional surcharge. $105.00 minimum fee plus $.0005 valuation Surcharge Municipal Service — commercial /industrial /institutional 1.5% of valuation plus $.0005 surcharge. $105.00 minimum fee plus $.0005 valuations urcharge. Private Sewer — all classifications New construction or reconstruction Dakota County Recording Fee Septic System Maintenance /Operation Permits and Fees: Residential Maintenance Permit Commercial, Industrial, Public or Institutional Operational Permit Late renewal fee for maintenance or operational permits Special Individual Sewage Treatment System (I.S.T.S.) Inspections or Investigations State Surcharge: added to each permit MISCELLANEOUS BUILDING FEES Decks Demolition Permit Dumpster Enclosure Fences Fireplaces Manufactured Homes Inclusive of all inspections and connections Moving Permit Moving Permit — Out Moving Permit — In Penalty for failing to obtain a permit prior to 21 $250.00 50.00 $300.00 No fee $40.00 $25.00 $100.00 As recommended by the Minnesota State Code - Section 16B.70. $100.00 $85.00 60.00 $75.00 $100.00 $100.00 $180.00 $175.00 2 times the regular permit fee as starting work requiring a permit: Re- inspection Roofing, Re- Roofing — Residential Residential —Tear off, Re -roof, and Overlay Commercial /Institutional /Industrial - Siding — Residential Re- siding Commercial /Institutional /Industrial Satellite Dishes and Antennas — Residential: All other antennas and satellite dishes Single Family Dwelling Basement Finish Slabs Residential Residential /Multi - Family Slabs /Patios Commercial /Institutional /Industrial Special and Miscellaneous Inspections Swimming Pools Temporary Construction Trailer Water Softener Installation Window Replacement 22 RESOLUTION 2010- established herein $50.00 $75.00 As recommended by Exhibit A Plus $.0005 valuation surcharge. Minimum fee of $100.00 +$.0005 valuation surcharge $75.00 As recommended by Exhibit A -plus $.0005 valuation surcharge. Minimum fee $84.00 plus $.0005 valuation surcharge. No fee Per Exhibit A Plus $.0005 valuation surcharge. Minimum fee $84.00 plus $.0005 valuation surcharge $175.00 $50.00 $70.00 $70.00 $75.00 $150.00 $65.00 $70.00 $46.00 RESOLUTION 2010- Sample Fee Schedule 2004 EXHIBIT A Building Value Range Fee Schedule $0-$500.00 $25.00 $500.01 - $2,000 $25.00 for the first $500 $3.25 per additional $100 $2,000.01 - $25,000 $73.50 for the first $2,000 $14.75 per additional $1,000 $25,000.01 - $50,000 $413.00 for the first $25,000 $10.75 per additional $1,000 $50,000.01 - $100,000 $681.75 for the first $50,000 $7.50 per additional $1,000 $100,000.01 - $500,000 $1,056.75 for the first $100,000 $6.00 per additional $1,000 $500,000.01 - $1,000,000 $3,456.75 or the first $500,000 $5.00 per additional $1,000 $1,000,000.01 and up $5,956.75 for the first $1,000,000 $4.00 per additional $1,000 *Changes per LMC report of 11/3/03 This fee schedule was developed cooperatively by members of the League of Minnesota Cities and the Association of Metropolitan Municipalities, with information provided by the State Building Codes and Standards Division. 23 RESOLUTION 2010- EXHIBIT B RESIDENTIAL BUILDING VALUATIONS* Cost Per Square Foot By reference the City adopts the most recently approved valuation table approved by the Minnesota Department of Industry and Labor. SINGLE FAMILY DWELLINGS -TYPE V- WOOD FRAME First Floor Second Floor SINGLE FAMILY DWELLINGS - BASEMENT Finished Basements Unfinished Basements Crawl Space Conversion Un- excavated Foundation Areas GARAGES: Wood Frame Masonry Construction Carport Pole Building DECKS, WOOD FRAMED, ENTRY PORCH FOUR SEASON PORCHES THREE SEASON PORCHES, WOOD FRAMED GAZEBOS, WOOD FRAMED /SCREENED ZERO CLEARANCE FIREPLACES MASONRY FIREPLACES: One Level Each Additional Level SINGLE FAMILY DWELLING MECHANICAL INSTALLATION VALUES: Plumbing (Up to 2 Full Baths —1 Half Bath- Basement R.I. Only) Plumbing, Each Additional Bathroom HVAC (No Air conditioning, One Furnace) HVAC, Air Conditioning HVAC, Each Additional Furnace City Sewer /Water Installation Septic Systems(s): Standard Trench /Drain field Mound System Tanks /Pumped up /Drain field 24 RESOLUTION 2010- EXHIBIT "C" TABLE A -33 -A- GRADING PLAN REVIEW FEES 50 cubic yards 38.2m3 or less No fee 50 cubic yards 38.2m3 or less $23.50 101 to 1,000 cubic yards 77.2m3 to 764.6m3 $37.00 1,001 to 10,000 cubic yards 65.3m3 to 7645.5m3 $49.25 10,001 to 100,000 cubic yards (7646.3m3 to 76,455m3) - $49.25 for the first 10,000 cubic yards (7645.5m3), plus $24.50 for each additional 10,000 yards 7645.5m3 or fraction thereof. 100,001 to 200,000 cubic yards (76 456m3 to 152 911m3) - $269.75 for the first 100,000 cubic yards (76 455m3), plus $13.25 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof. 200,001 cubic yards (152 912m3) or more - $402.25 for the first 200,000 cubic yards (152 911m3), plus $7.25 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof. Other Fees: hours) Additional plan review required by changes, additions or revisions to approved $50.50 per hour* plans 3. Inspections for which no fee is specifically indicated (minimum charge — minimum charge is one -half hour one half hour *Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. TABLE A -33 -B- GRADING PERMIT FEES 50 cubic yards 38.2m3 or less $23.50 51 to 100 cubic yards 40m3 to 76.5m3 $37.00 101 to 1,000 cubic yards (77.2m3 to 764.6m3) - $37.00 for the first 100 cubic yards (76.5m3) plus $17.50 for each additional 100 cubic yards 76.5m3 or fraction thereof 1,001 to 10,000 cubic yards (765.3m3 to 7645.5m3) - $194.50 for the first 1,000 cubic yards (764.6m3), plus $14.50 for each additional 1,000 cubic yards 764.6m3 or fraction thereof. 10,001 to 100,000 cubic yards (7646.3m3 to 76,455m3) - $325.00 for the first 10,000 cubic yards (7645.5m3), plus $66.00 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof. 100,001 cubic yards (76 456m3) or more - $919.00 for the first 100,000 cubic yards (76 455m3), plus $36.50 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof. Other Inspections and Fees: 1. Inspections outside of normal business hours (minimum charge - two $50.50 per hr2 hours) $50.50 per hr2 2. Re- inspection fees assessed under provisions of Section 108.8 $50.50 per hr2 3. Inspections for which no fee is specifically indicated (minimum charge — one half hour 1 The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference between the fee paid for the original permit and the fee shown for the entire project. 2 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision, overhead, equipment, hourly wages and fringe benefits of the employees involved. 25