HomeMy WebLinkAbout6.g. 2011 Schedule of Rates and FeesRosEMOUNTEXECUTIVE SUMMARY
CITY COUNCIL
City Council Regular Meeting: December 21, 2010
AGENDA ITEM: 2011 Schedule of Rates and Fees
AGENDA SECTION:
Consent
PREPARED BY: Amy Domeier, City Clerk
Department Directors
AGENDA NO.
ATTACHMENTS: Draft Resolution
APPROVED BY:
RECOMMENDED ACTION: Motion to Adopt a Resolution Approving Amendments setting
the 2011 Schedule of Rates and Fees.
SUMMARY
The fee schedule is updated on a yearly basis upon review of frequent fees established by City
departments. The common fees issued by all City departments are included in the fee resolution. Staff
and financial consultant, Jessie Hart of Springsted and Associates, have worked together to establish
baseline charges that include work sheets of staff time involved for each fee. After review, fees are
changed as reflected in the attached resolution. The proposed amendments are noted with editing marks.
The fee schedule for Parks and Recreation Fees including the rental of the Community Center and Steeple
Center will be presented at a later meeting. The Parks Commission is still reviewing and determining the
proposed fees for 2011.
SUMMARY
Staff recommends the approval of the above - motion.
CITY OF ROSEMOUNT
DAKOTA COUNTY, MINNESOTA
RESOLUTION 2010 -
A RESOLUTION APPROVING AMENDMENTS SETTING THE
2011 SCHEDULE OF RATES AND FEES
WHEREAS, the City of Rosemount annually conducts a User Fee Study in order to establish
logical and defensible fees for the City of Rosemount; and
WHEREAS, the City of Rosemount has found certain fees and rates in need of adjustments.
THEREFORE, NOW BE IT RESOLVED by the City Council of the City of Rosemount that it
adopts the attached Schedule of Rates and Fees for 2011.
ADOPTED this 21" day of December, 2010 by the City Council of the City of Rosemount.
William H. Droste, Mayor
ATTEST:
Amy Domeier, City Clerk
RESOLUTION 2010-
SCHEDULE OF RATES AND FEES FOR 2011
Planning and Zoning Review Fees Page 1
Public Works and Engineering Fees Page 3
Administration Fees Page 12
Fire Prevention Permits and Fees Page 14
Police Department Permits and Fees Page 16
Building Permits and Fees Page 17
Building Value Range Fees — Exhibit A Page 22
Residential Building Valuations — Exhibit B Page 23
Table A -33B Grading Plan Review Fees — Exhibit C Page 24
Parks and Recreation Fees Page 25
Community Center and Arena Page 25
Outdoor Facilities Page 31
Park Dedication Fees Page 33
PLANNING AND ZONING REVIEW FEES
Administrative Appeals
Affidavits - Certificate of Authenticity
Appeal of Planning Commission Decisions to the City Council
RESOLUTION 2010-
$250.00
$60.00
$150.00
City Staff Billing
For applications that include excessive staff time, services performed by City personnel will be
billed at actual payroll costs including hourly rate, all payroll taxes and benefit charges. Services
provided by City consultants will be billed at the current consultant rates.
Comprehensive Guide Plan Amendment Application Fee
Conditional Use Permit
Documents -
2030 Comprehensive Guide Plan
Comprehensive Stormwater Management Plan
Zoning Ordinance and Subdivision Ordinance
Zoning Map
Black and White
Color —11" x 17"
Color — 24" x 36"
$3,000.00
$1,000.00
$60.00 + tax
$92.00 + tax
Same as City -wide
document fee
$5.00 + tax
$10.00 + tax
$25.00 + tax
Environmental Assessment Worksheets $1,800.00
Escrow fee for City Consultant Services. Applicant will be responsible $10,000.00
for actual costs incurred by the city.
Interim Use Permits for Seasonal Sales of Christmas Trees For $40.00
Periods of Less than 40 Days Per Calendar Year
All Other Interim Use Permits $500.00
Joint Applications
A planned unit development that includes a subdivision may have the fee waived for a
preliminary plat at the discretion of the Community Development Director.
Mineral Extraction Permit
Application Fee
Annual Fee
Surety Bond
$700.00
$370.00
$7,500.00 per acre
Rental Licensing $25.00
Planned Unit Development
Concept Plan
Master Development Plan
Final Development Plan
Major Amendment
Minor Amendment
Rezoning
Signs
Permanent Installation
Temporary Signs:
For permits obtained after placing the sign
For permits obtained prior to placing the sign
Site Plan Review
Subdivision Fees
Preliminary Plat
Residential
Commercial /Industrial
Final Plat
Lot Split
Administrative Plat /Simple Plat
Other Subdivision (waiver of subdivision)
Lot Combination
TIF (Tax Increment Financing) Application Fee
Parcel in TIF
New TIF District
Transmission Facilities
Variance Petition Application Fee
Zoning Ordinance Text Amendment
Fee in Lieu of Tree Dedication
2
RESOLUTION 2010-
$2,500.00 +$20 per acre
$2,500.00
$2,000.00
$3,000.00
$900.00
$1,500.00
$270.00+ electrical
permit
$50.00
$10.00
$1,200.00
$2,000.00 + the
following:
$10.00 per unit
$50.00 per acre
$1,200.00
$1,400.00
$1,120.00
$800.00
$400.00
$775.00
$1,750.00
$1,000.00
$200.00
$1,800.00
$100.00 per caliper inch
of tree replacement
PUBLIC WORKS AND ENGINEERING FEES
Assessments:
RESOLUTION 2010-
Street Assessments for Total Reconstruction Projects on existing streets are as follows:
Single Family /R -1 Zoned Lot:
With Existing Concrete Curb & Gutter $6,000.00
With Existing Bituminous Curb $6,600.00
With Existing Gravel Road
Rural and Transitional Residential
With existing bituminous
With existing gravel road
Full Cost of
Improvement
35% of Improvement
Cost
Full Cost of
Improvement
Street Assessments for Rehabilitation Projects on existing streets are as follows:
All Properties 35% of Improvement
Cost
Street Assessments for Overlay Projects on existing streets are as follows:
All Properties 35% of Improvement
Cost
City Equipment and Staff Rates:
Equipment
Per hour charge (does not include operator). Equipment charges, including licensed vehicles and
mobile equipment, will be calculated as follows: The true cost of the equipment (including
annual depreciation, annual insurance premiums, annual license taxes if applicable, annual
operating and maintenance expenses, and an annual carrying fee) will be divided by the estimated
hours the equipment is expected to be used annually.
Public Works Staff -Per hour charge
Staff charges for each employee billed will be calculated using the actual hourly rate plus all
payroll taxes and benefit charges.
Engineering Fees:
Administrative Fees: For Chapter 429 or private improvements project charges shall be calculated
at 5% of public improvement construction costs.
Services provided by City consultants will be billed at the current rates plus 5 percent
administrative costs, unless assessed to benefiting property under a 429 project which then
excludes the 5 percent.
RESOLUTION 2010-
Miscellaneous Public Works Fees:
As- builts /Record Drawings
Electronic Copy
X
$10.00 + tax
Hard Copy
0.50
$20.00 + tax
Feasibility Reports
= 20.00
$23.34 + tax
Geographic Information Systems Fees (GIS)
40
= 20.00
Single family, town homes or multi- family
X
$60.00 per lot /unit
All other - Final Plat
0.50
$120.00 per acre
Simple Lot /Parcel split or boundary change
= 20.00
$300.00
Right -of -Way Fees & Charges:
50
= 25.00
Renistration Fee
X
50
= 25.00
Time
X $ Per = Cost
50
Involved
Hour ($)
(Hour)
$200.00
Administration
0.25
X 40 = $ 10.00
Review
0.50
X 40 = 20.00
Recording
0.25
X 40 = 10.00
Total Cost
$ 40.00
Registration fee is due annually and is due by January 15"' of the corresponding year.
Excavation Permit Fees
A) Hole
Administration 0.50 X 40 = $ 20.00
Verification
1) Plan Review
2) Inspection
a) Location before work
b) Compliance during work
c) Completion after work
d) Re- inspection
3) Mapping
a) Review data
b) Transfer to Autocad
c) Insert to overlay to tie in
Total Cost
0
0.50
X
50
= 25.00
0.50
X
40
= 20.00
0.50
X
40
= 20.00
0.50
X
40
= 20.00
0.50
X
40
= 20.00
0.50
X
50
= 25.00
0.50
X
50
= 25.00
0.50
X
50
= 25.00
$200.00
RESOLUTION 2010-
Plus $0.20 per lineal foot for
each excavation over 1,000
feet
B) Emergency Hole
Administration 0.50 X 40 = $ 20.00
Inspection after completion 1.50 X X040 = 4&.00$6
0.00
Total Cost $01
85.00
C) Trench
Administration
0.50
X
40
Verification
1)
Plan Review
1.50
X
50
2)
Inspection
a) Location before work
0.50
X
40
b) Compliance during work
1.50
X
40
c) Completion after work
1.50
X
40
d) Re- inspection
0.75
X
40
3)
Testing Result Review
a) Compaction
0.25
X
40
b) Material
0.25
X
40
4)
Mapping
a) Review data
0.50
X
50
b) Transfer to Autocad
0.50
X
50
c) Insert to overlay to tie in
0.50
X
50
Total Cost
The average trench is 330 lin. ft.
past the width of
a
hole. Therefore, the number of
100 lin.
ft. (or portion
thereof) units is 4. The cost per
100 lin.
ft. unit is
360.00 / 4 = $90.00/100' unit.
W
$ 20.00
$ 75.00
20.00
60.00
= 60.00
30.00
= 10.00
10.00
25.00
= 25.00
25.00
$360.00
RESOLUTION 2010-
Obstruction Permit Fee
A) Administration 0.50 X 40 = $ 20.00
B) Recording 0.25 X 40 = 10.00
C) Review 0.75 X 50 = 37.50
Minimum Base Coat $ 57.50
Plus additional fee based on length
Inspection
1) Compliance during work 1.50 X 40 = $ 60.00
2) Completion after 0.25 X 40 = 10.00
Additional fee on assumed 1000 lin. ft. permit = $ 52.50
Additional cost per lineal foot = $70.00 / 1000 = 0.07
Delay Penalty
A) Administration 1.5 X 40 = $ 60.00
For up to 3 days of non - completion and non -prior notice
before specified completion date.
After 3 days, an additional charge of $20 /day will be levied.
Total Penalty Charge = $ 60.00
(Up to 3 days late)
Each day late over 3 days
Plus 20.001Dav
Right of Way /Utility Easement Vacation Fee $775.00
Sidewalk/Trail Snow Removal $75.00 per lot
Street Excavation and Curb Cuts
Curb Cuts, Driveway Access Permits, Transit Stop Kiosks $180.00
Street Excavation Minimum bond deposit with City $2,000.00
Street & Utility Specifications $23.34 + tax
Wetland Notification /Application Form (Deposit for Costs Incurred) $3,175.00
Solid Waste Hauling License $320.00
3
RESOLUTION 2010-
ATTACHMENT 1
Water Sanitary Sewer, Storm Water Usage Rates:
Water and Sanitary Sewer User Fees
Usage -Based on Quarterly Meter Readings
Water Use
Residential
Quarterly usage (gallons) Rates *:
0-10,000 $0.90
10,001 - 30,000 $1.10
30,001 - 60,000 $1.40
>60,000 $1.90
*per thousand gallons
Commercial /Industrial
Quarterly usage (gallons) Rates *:
0-100,000 $1.05
100,001 - 200,000 $1.30
200,001 - 300,000 $1.60
> 300,000 $2.00
*per thousand gallons
Irrigation Meters Rates:
Osage for single -fam4 homes with a second meter are added together, then $2.00 /1000 gallons
put through the tiers. All other irrigation meters will be charged the flat rate of
$2.0011.000 gallons.)
Water Fixed Charge $10.00 each account
Sanitary Sewer Use $1.50/1000 gallons
Sanitary Sewer Fixed Charge $20.00 each account
Water Surcharge and Meter Maintenance Per Chart Below (Quarterly)
Meter Size
Surcharge
Meter Maintenance **
Single Family - 5/8"
$ 8.80
0
Multi - Family - 5/8"
$ 6.80
0
1" ( *)
$ 13.50
$ 6.25
1 ' /a" ( *)
$ 28.00
$ 11.25
2" ( *)
$ 31.50
$ 18.15
2 ' /z" ( *)
$ 39.35
$ 22.20
3" ( *)
$ 47.00
$ 26.25
4" ( *)
$ 70.00
$ 45.00
6" ( *)
$154.00
$100.00
8" ( *)
$170.00
$130.00
*Commercial, Industrial or Institutional /Commercial and Industrial are taxable
* *Meter maintenance applied to Base Fixed Water Charge based on meter size.
Sewer Only Users
7
$50.00 per quarter per
SAC unit
RESOLUTION 2010-
Bulk Water $2.00 per 800 gallons +
tax
Irrigation Meters: Exempt from Sanitary Sewer Usage charges. Pays Water Usage charge, Fixed
Water charge by meter size and Surcharge by meter size.
QUARTERLY STORM WATER UTILITY FEES
Storm Fee
Land Use Land Use Description Unit Fee
Category
1 Single - family residential, R -1,2, RL, Multi -unit Residential $12-4113.03
residential with individual water meters, R -3,4, Unit
Platted /undeveloped, Minimum charge for all
parcels
2 Rural residential, Agricultural, RR, AG Lot
3 Parks, Golf Courses, Cemeteries, PK Acre
4 Undeveloped /un- platted Acre
5 Multi -unit residential without individual water Acre
meters, Apartments, Churches, Schools, Hospitals,
Government Buildings, Mobile Home Parks
6 Commercial, Industrial and Parking Lots, C- Acre
1,2,3,4,IP,IG,PL,WM
*Categories 3,4,5, & 6 are subject to the minimum charge of $42. 4113.03.
minimum or application of the above rates will be used for the fee.
Miscellaneous Utility Charges:
Meter Disconnection Charge
Meter Reconnection Charge
$13.0813.73
$2:662.79*
$.4-516*
$46:4448.42*
$57. 5260.39
The largest of either the
$80.00
$80.00
Monthly New Customer List
Hard Copy $10.00 + tax
Electronic Copy (Must be pre -paid) (Annual Fee Jan. — Dec. — Fee $060.00
will be pro -rated for partial calendar year, by month)
Total Customer List
100 copies of black and white letter or legal sized copies; or
More than 100 pages and 15 minutes or longer of staff time
Electronic format
Utility Billing Search /Resident
Utility Billing Search /Non- Resident
Water Meter Accuracy Check
Testing 5/8" — 2# meters
Testing 3" meters
Testing 4" meters
Testing 6" meters
8
$.25 /page + tax
Actual costs will be
billed + tax
$25.00
No Charge
No Charge
$125.00
$125.00
$125.00
$125.00
RESOLUTION 2010-
Water Meter Installation Charges: Water meter charges are the actual cost of meter and
appurtenant parts, plus shipping and handling. Charges are subject to change during the year.
See the most recent Cost of Water Meter schedule.
Water, Sanitary Sewer and Storm Water Capital Charges:
Metropolitan Council Environmental Services Availability Charge (Metro SAC)
Per Sac Unit, as determined by the MCES $2,40042230.00
City Sanitary Sewer Availability Charges
CITY SANITARY SEWER Trunk Area Assessments Per SAC Unit as determined by
CHARGES collected with final the MCES and collected with the
plat/subd!vision Building Permit
agreement
Single Family Residential
Multi - Family Residential $1,075.00 per acre $1,200.00
Institutional, Commercial
and Industrial
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution, prior to connection to the sanitary sewer system.
City Water Availability Charges
Trunk area assessments collected with final plat /subdivision agreement as follows:
All Zoning types $6,500.00 per acre
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution.
And Water Access Charge collected with the Building Permit as follows:
Single Family Res
Multi- Family Res
1"
1 ' /z"
2"
21/2"
3"
4"
6"
8"
Meter
Meter
Meter
Meter
Meter
Meter
Meter
Meter
$2,175.00
$2,175.00
$9,800.00
$14,700.00
$19,600.00
$24,500.00
$29,450.00
$34,350.00
$39,250.00
$44,150.00
Supplemental Water and Sanitary Sewer Connection Charges
In addition to other charges imposed at the time of connection to water and sanitary sewer
systems, supplemental connection charges, set by reference to the portion of the cost of
connection that has been paid by the premises being connected, in comparison with other
premises, will be imposed and collected from the properties, and in the amounts, listed below, for
each connection made:
9
PID
340201001006
340201001009
344430001001
344430001002
344430002001
344430002002
344430003001
344430003002
344430004001
344430004002
344430005001
344430006001
344430007001
344430008001
344430009001
344430000001
Address
2771-132 nd St. W.
2813-132 nd St. W.
173 CR 42 (2693
132nd Ct. W.)
2694- 132nd Ct.
2685-132 nd Ct. W
2684-132 nd Ct. W
2675 -132nd Ct. W
2686-132 nd Ct. W
2665-132 nd Ct. W
2604-132 nd Ct. W
2655-132 nd Ct. W
2645-132 nd Ct. W
2055 -128`h St. W
(2635132 nd Ct W)
2625-132 nd Ct. W
2615 -132nd Ct. W
2605-132 nd Ct. W
RESOLUTION 2010-
2010 Supplemental 2010 Supplemental Sewer
Water Connection Connection Charges
Charges
Certified
X4,93`1- 3 -SPaid in Full
Paid in Full
Certified
Paid in Full
Paid in Full
W Paid in Full Paid in Full
$4,934.355.107.05
Paid in Full
Paid in Full
Paid in Full
$4;934. 355.107.05
Paid in Full
$4- 934- 355,107.05
$4,934.23Y55 10-7.0-5
$4,934. 355,107.05
Paid in Full
Paid in Full
Paid in Full
Paid in Full
Paid in Full
Paid in Full
Paid in Full
$5,852- x-76,057.20
Paid in Full
$2.376.0 77.20
$5;85?.P6.0 77.20
$5,85?:370,057.20
Paid in Full
Paid in Full
Paid in Full
Such supplemental connection charges shall be increased each calendar year commencing January
1, 2007, by three and one -half percent (3.5 %) from the charges of the preceding year.
Storm Water Charges
a. For this charge, Newly Developed Properties are defined as any property, including platted or un-
platted parcels, which are improved with buildings, grading, or otherwise creating an impervious
surface. In addition to the following charges, stormwater ponding fees /credits will be determined at
the time of final platting or building permit application.
STORMWATER
CHARGES
Single Family
Multiple Family
Public /Institutional
Trunk Area Assessments
to be collected from
Developers on all newly
developed properties
$6,865 per acre*
Connection Charges (STAAC)
collected with the Building
Permit on all Newly Developed
properties
$770 per lot
$290 per housing unit (4 plex = 4
units)
$2,270 per acre
Commercial and Industrial $2,270 per acre
*Acres are defined as gross acres of developable property minus pond acreage (at high water
level) and wetlands at delineation line, rounded to the nearest one tenth (1/10`h) of an acre.
Any part of the Trunk Area Assessment that is not collected with a plat /subdivision agreement
will be collected as a connection charge, in addition to any other connection charge established
by this resolution, prior to issuance of a Certificate of Occupancy for use of any property.
10
RESOLUTION 2010-
Connection Charges (STAC) Collected with the Building Permit on all newly developed properties
that have not paid trunk area assessments listed above (Gross Area):
Single Family
$3,050.00 per lot
Multiple Family
$8,570.00 per acre
Public/ Institutional
$9,150.00 per acre
Commercial
$8,515.00 per acre
Industrial
$8,515.00 per acre
Water Tower Antennas Application Fee $2,500.00
Per year rent payments based on 9" panel Type or 3 A whip type antennas and appropriate
outside equipment area will be charged at the current yearly rate, which is adjusted annually.
Minimum per year lease payment increase
11
5%
ADMINISTRATION FEES
Adult Use Establishment License
Check Return Charge
Videotapes
Audiotapes
Documents
The following fees for copies apply to all
departments.
100 copies of black and white letter,
oi- legal or ledger sized copies: or
More than 100 pages and 15 minutes or
longer of staff time; or
Document that is outsourced
RESOLUTION 2010-
$3,000.00
$30.00
$5.00 + tat
$5.00 + tat
$.25 /page + tax
$30 /page + tax (for color)
Actual costs will be billed + tax
Actual costs will be billed + tax
Faxed copies are $.50 per page plus tax. If more than 100 pages or if long distance
charges apply, actual costs plus tax will be billed to the requester. Mailed copies are
charged the applicable document rate and all handling costs plus tax.
Large Public Gathering on City Parkland $150.00
Liquor Licenses:
On -Sale Intoxicating
Class A (Jan 1 -Dec 31) $4,500.00
Class B Qan 1 -Dec 31) $3,000.00
On -Sale Wine $550.00
Off -Sale Intoxicating $200.00
On -Sale 3.2% Malt Quly 1 June 30) $250.00
Off -Sale 3.2% Malt (July 1 June 30) $210.00
Temporary On -Sale Intoxicating $170.00 /event
Temporary On -Sale 3.2% Malt $150 /event
12
Special Club On -Sale Intoxicating
(Jan 1 -Dec 31)
Membership: under 200
between 201 and 500
between 501 and 1,000
between 1,001 and 2,000
between 2,001 and 4,000
between 4,001 and 6,000
more than 6,001
Special Sunday Gan 1 -Dec 31)
Bottle Club
One -day Bottle Club
On Public Premise — Annual License
Gan 1 -Dec 31)
Per event
Amending an Existing Liquor License
Background Investigation Fee
Massage Therapist License Gan 1 -Dec 31)
Peddlers, Solicitors and Transient Merchants
Gan 1 -Dec 31)
Gambling Permits
Annual Billiard Hall or Dance Club License
Initial Application Investigation Fee
Amendment to Billiard Hall or Dance Club
License
Annual Arcade Parlor License
Initial Application Investigation Fee
Amendment to Arcade Parlor License
13
RESOLUTION 2010-
$300.00
$500.00
$650.00
$800.00
$1,000.00
$2,000.00
$3,000.00
$250.00
$140.00
$25.00
$350.00
$30.00
$175.00
$1,500.00
$90.00
$90.00
$250.00
$800.00
$500.00
$175.00
$15.00 per location plus $15.00
per machine
$500.00
The lesser of $15.00 per
location plus $15.00 per
machine or $175.00
RESOLUTION 2010-
FIRE PREVENTION - PERMITS AND FEES
Alarm System Permit/Review
As recommended by Value Range - Exhibit A
Burning Permit — Commercial $235.00
Day Care Inspection $50.00
Fire Dept. Certificate of Occupancy $965.00
Inspection /Renewal Fee
Copies of Fire Dept. Officers Report Same as City -wide document
fee
Fire Dept. Re- inspection Fee
$47.00
Fire Dept. Special and Miscellaneous
$130.00
Inspections
Copies of Fire Dept. Report
Same as City -wide document
fee
Fire Photo (per copy)
$5.00 + tax
Fire Video Tape
$5.00 + tax
Fire Sprinkler Protection System
As recommended by Exhibit A.
State Surcharge:
As recommended by the
Minnesota State Code - Section
16B.70
Fuel Tank Installation or Removal:
$200.00
Haunted House Operation Permit
$880.00
Penalty for Failing to Obtain Permit
Penalty for failing to obtain a
permit prior to starting work
required is two times the regular
permit fee established herein.
14
Plan Check Fees:
Commercial /Industrial /Multi - family buildings
and structures
Residential buildings
Residential Accessory Structures /additions/
alterations /repairs /remodeling —
Pyrotechnic Display of Fireworks
Fireworks Sales
Firework Retailer
Multi -Item Retailer
State Surcharge
Storage and use of Hazardous Materials
Over quantities listed in current Fire Code
Edition — Section 4. Permit valid for twelve
months maximum
Temporary Use of LP Gas
15
RESOLUTION 2010-
Sixty -five percent (65 %) of the
building permit fee.
Sixty -five percent (65 %) of the
building permit fee for the new
single family dwellings.
Sixty -five percent (65 %) of the
building permit fee.
$300.00
$350.00
$100.0
0
As recommended by the
Minnesota State Code- Section
16B.70.
$650.00
$100.00
Alarm User Permit
Animal Impound
Animal Licenses
POLICE DEPARTMENT PERMIT AND FEES
$0200.00
40.00
$3f�l0l
RESOLUTION 2010-
Registration Fees OEW be charged for nwnber of months u12 to expiration date of rabies vaccine.
Annual fee for spayed and neutered $6.00 (prorated at $.50 /mo.)
animals
Annual fee for unspayed and un- neutered $12.00 ( 12rorated at $1.00 /mo.)
Duplicate Tags $5.00
Applicants 62 year of age or older hall pay fifty percent (SO %) of above stated fees
I AnaloWDi ital Audio Tape Copies
Background checks
Contractual Overtime
Contractual Overtime Squad Use
(directly involved in contractual serylW
Dangerous Dog Registration State authoritied
Pawn Shop License Fee:
$5.00 (includes taxi
$18.78 -�, - tax ($20.00W.00
includes tax)
$4-9-.Wf)0.00 per hour
$7.00 per hour
$300.00
0 -20 pawns a day
$1,500.00 yr
21 -40 pawns a day
$3,000.00 yr
41 and over pawns a day
$5,000.00 yr
Initial application includes $1,500.00 deposit for investigation fee as set in City Code
Photographs:
Traditional copy of photos
$10.00 per roll 4-tftm includes
tax
Color copy of photo
$.50 /page 4- tftx4includes tax)
Digital copies of photos
$.25 /page includes tax)
Copies of Police report
Video Copies
Traditional or Digital
Tattoo & Body Piercing Establishments
Annual Business License
16
$.25 /page4includes tax)
$5.00 Cincludes tax)
$250.00
RESOLUTION 2010-
Annual Personal Service License $100.00
Pigeons Loft and Fowl Coop $25.00
Renewal $6.00
17
BUILDING PERMITS AND FEES
Administrative Handling Fee
Building Permits
As recommended by Value Range — Exhibit A.
As -built Survey Escrow Fee
Certificate of Occupancy Inspection and /or
change of use
Building Department Reports
Electrical Permits
RESOLUTION 2010-
A handling fee of $25.00 will be charged
for address and lot changes and for permit
and file editing. These changes must be
done within thirty (30) days of permit
issuance or all prior permit fees will be
forfeited (non - refundable).
$2,000.00
$58.00
$160.00 /year tax (includes posse)
$12.50 /month + tax
1. Minimum fee for each separate inspection of an $40.00
installation, replacement, alteration or repair limited
to one inspection only.
2. Administrative fee for each permit
$10.00
3. Services, changes or service, temporary services, additions, alterations or repairs on either
primary or secondary services shall be computed separately.
0 to 100 ampere capacity $20.00
101 to and including 200 ampere capacity $25.00
For each additional 100 ampere capacity or $8.00
fraction thereof
4. Circuit, installation of, additions, alterations or repairs of each circuit or sub - feeder shall be
computed separately, including circuits fed from sub - feeders and including the equipment served
except as provided for in Items 4 through 9.
0 to and including 30 ampere capacity $7.00
(maximum number of 1 -30 ampere circuits to be
paid on is 30 to any one cabinet)
31 to and including 100 ampere capacity $8.00
For each additional 100 ampere capacity or $5.00
fraction thereof
18
RESOLUTION 2010-
In addition to the above fees:
A charge of $4.00 will be made for each street lighting standard. A charge of $5.00 will be made
for each traffic signal standard. Circuits originating within the standard will not be used when
computing fees.
In addition to the above fees:
All transformers and generators for light, heat and power will be computed separately at $5.00
per unit plus $.25 per KVA up to and including 100 KVA.101 KVA and over will be computed
at $.20 per KVA
All Transformers for signs and outline lighting shall be computed at $4.00 for the first 500 VA or
fraction thereof per unit plus $40.00 for each additional 100 VA or fraction thereof.
In addition to the above fees (unless included in the fee filed by the initial installer):
Remote control, signal circuits and circuits of less than 50 volts shall be computed at $6.00 pr
each ten (10) openings or devices of each system plus $.50 for each additional opening.
For review of plans and specifications of proposed installations there shall be a minimum fee of
$100.00 up to and including $30,000.00 of electrical estimate, plus 1/10 of one percent (1 %) on
any amount in excess of $30,000.00 to be paid by persons or firms requesting review.
When re- inspection is necessary to determine whether unsafe conditions have been corrected and
such conditions are not subject to an appeal pending before any court, a re- inspection fee of
$35.00 may be assessed in writing by the inspector.
For inspections not covered herein, or for requested special inspections or services, the fee of
$50.00 per man hour, including travel time, plus the standard IRS allowed mileage reimbursement
per mile traveled, plus the reasonable cost of equipment or material consumed. This section is
also applicable to inspection of empty conduits and such jobs as determined by the City.
For inspection of transient projects including, but not limited to carnivals and circuses the
inspection fees shall be computed as follows:
Power supply units according to item 2 of the fee schedule. A like fee will be required on power
supply units at each engagement during the season, except that a fee of $50.00 will be charged for
additional time spent by the inspector if the power supply is not ready for inspection at the time
and date specified on the Request for Inspection as required by law.
Rides, devices or concessions shall be inspected at their first appearance of the season and the
inspection fee shall be $35.00 per unit.
Fees for services, feeders and circuits operating at over 250 volts shall be doubled those listed in
items 3 and 4 above.
A $-.-50-S,5.00 State surcharge is to be added to each permit.
19
Grading Permits:
All fees are established in Exhibit D
Plan review fees are found in Exhibit D
State surcharge fee of $-.-50_$_5.00
Bond Required $3,000.00 per disturbed acre:
minimum one acre
Plan Check Fees:
Commercial /Industrial /Multi- family building and
structures
Residential buildings
Residential Accessory Structures
Plumbing, Heating, Ventilating, Air conditioning &
Refrigeration Fees:
Residential (4 or less units)
New Construction
Alteration /repair
Multiple Housing (5 or more units)
New Construction
Alteration /repair
Commercial /Industrial /Institutional
New Construction:
RESOLUTION 2010-
Sixty five percent (65 9/6) of the building
permit fee.
Sixty -five percent (65 %) of the building
permit fee for new single family
dwellings /single family additions,
alterations, etc., similar plans per state
statute 1300.0160 twenty -five percent
(25 %) of the building permit fee.
Additions /alterations /repairs /remodeling:
sixty -five percent (65 %) of the building
permit fee.
$125.00
$70.00
$100.00 /unit
$70.00 /unit
1.5% of valuation plus $.0005 valuation
surcharge
$215.00 minimum fee plus $.0005
valuation surcharge
Commercial/ Industrial/ Institutional/ Public:
Set fee of $75.00 for project valued under $3,500.00 which requires one inspection.
Set fee of $125.00 for project valued under $3,500.00 which requires two inspections.
For projects valued over $3,500.00, 1.5% of the value of the project, with a minimum fee of
$215.00.
Plus $.0005 valuation surcharge for all projects.
Pill
RESOLUTION 2010-
Sewer and Water Installation Permit Fees:
Municipal Service — residential (4 or less units) $55.00
Municipal Service — 1.5% of valuation plus $.0005 valuation
commercial /industrial /institutional surcharge. $105.00 minimum fee plus
$.0005 valuation Surcharge
Municipal Service — commercial /industrial /institutional 1.5% of valuation plus $.0005 surcharge.
$105.00 minimum fee plus $.0005
valuations urcharge.
Private Sewer — all classifications
New construction or reconstruction
Dakota County Recording Fee
Septic System Maintenance /Operation Permits
and Fees:
Residential Maintenance Permit
Commercial, Industrial, Public or Institutional
Operational Permit
Late renewal fee for maintenance or operational
permits
Special Individual Sewage Treatment System
(I.S.T.S.) Inspections or Investigations
State Surcharge: added to each permit
MISCELLANEOUS BUILDING FEES
Decks
Demolition Permit
Dumpster Enclosure
Fences
Fireplaces
Manufactured Homes
Inclusive of all inspections and connections
Moving Permit
Moving Permit — Out
Moving Permit — In
Penalty for failing to obtain a permit prior to
21
$250.00
50.00
$300.00
No fee
$40.00
$25.00
$100.00
As recommended by the Minnesota State
Code - Section 16B.70.
$100.00
$85.00
60.00
$75.00
$100.00
$100.00
$180.00
$175.00
2 times the regular permit fee as
starting work requiring a permit:
Re- inspection
Roofing, Re- Roofing — Residential
Residential —Tear off, Re -roof, and Overlay
Commercial /Institutional /Industrial -
Siding — Residential
Re- siding
Commercial /Institutional /Industrial
Satellite Dishes and Antennas — Residential:
All other antennas and satellite dishes
Single Family Dwelling Basement Finish
Slabs
Residential
Residential /Multi - Family Slabs /Patios
Commercial /Institutional /Industrial
Special and Miscellaneous Inspections
Swimming Pools
Temporary Construction Trailer
Water Softener Installation
Window Replacement
22
RESOLUTION 2010-
established herein
$50.00
$75.00
As recommended by Exhibit A Plus
$.0005 valuation surcharge. Minimum fee
of $100.00 +$.0005 valuation surcharge
$75.00
As recommended by Exhibit A
-plus $.0005 valuation surcharge.
Minimum fee $84.00 plus $.0005 valuation
surcharge.
No fee
Per Exhibit A Plus $.0005 valuation
surcharge. Minimum fee $84.00 plus
$.0005 valuation surcharge
$175.00
$50.00
$70.00
$70.00
$75.00
$150.00
$65.00
$70.00
$46.00
RESOLUTION 2010-
Sample Fee Schedule 2004
EXHIBIT A
Building Value Range Fee Schedule
$0-$500.00 $25.00
$500.01 - $2,000 $25.00 for the first $500
$3.25 per additional $100
$2,000.01 - $25,000 $73.50 for the first $2,000
$14.75 per additional $1,000
$25,000.01 - $50,000 $413.00 for the first $25,000
$10.75 per additional $1,000
$50,000.01 - $100,000 $681.75 for the first $50,000
$7.50 per additional $1,000
$100,000.01 - $500,000 $1,056.75 for the first $100,000
$6.00 per additional $1,000
$500,000.01 - $1,000,000 $3,456.75 or the first $500,000
$5.00 per additional $1,000
$1,000,000.01 and up $5,956.75 for the first $1,000,000
$4.00 per additional $1,000
*Changes per LMC report of 11/3/03
This fee schedule was developed cooperatively by members of the League of Minnesota
Cities and the Association of Metropolitan Municipalities, with information provided by
the State Building Codes and Standards Division.
23
RESOLUTION 2010-
EXHIBIT B
RESIDENTIAL BUILDING VALUATIONS*
Cost Per Square Foot
By reference the City adopts the most recently approved valuation table approved by the
Minnesota Department of Industry and Labor.
SINGLE FAMILY DWELLINGS -TYPE V- WOOD FRAME
First Floor
Second Floor
SINGLE FAMILY DWELLINGS - BASEMENT
Finished Basements
Unfinished Basements
Crawl Space
Conversion
Un- excavated Foundation Areas
GARAGES:
Wood Frame
Masonry Construction
Carport
Pole Building
DECKS, WOOD FRAMED, ENTRY PORCH
FOUR SEASON PORCHES
THREE SEASON PORCHES, WOOD FRAMED
GAZEBOS, WOOD FRAMED /SCREENED
ZERO CLEARANCE FIREPLACES
MASONRY FIREPLACES:
One Level
Each Additional Level
SINGLE FAMILY DWELLING MECHANICAL
INSTALLATION VALUES:
Plumbing
(Up to 2 Full Baths —1 Half Bath- Basement R.I. Only)
Plumbing, Each Additional Bathroom
HVAC (No Air conditioning, One Furnace)
HVAC, Air Conditioning
HVAC, Each Additional Furnace
City Sewer /Water Installation
Septic Systems(s):
Standard Trench /Drain field
Mound System
Tanks /Pumped up /Drain field
24
RESOLUTION 2010-
EXHIBIT "C"
TABLE A -33 -A- GRADING PLAN REVIEW FEES
50 cubic yards 38.2m3 or less
No fee
50 cubic yards 38.2m3 or less
$23.50
101 to 1,000 cubic yards 77.2m3 to 764.6m3
$37.00
1,001 to 10,000 cubic yards 65.3m3 to 7645.5m3
$49.25
10,001 to 100,000 cubic yards (7646.3m3 to 76,455m3) - $49.25 for the first 10,000 cubic yards (7645.5m3), plus
$24.50 for each additional 10,000 yards 7645.5m3 or fraction thereof.
100,001 to 200,000 cubic yards (76 456m3 to 152 911m3) - $269.75 for the first 100,000 cubic yards (76
455m3), plus $13.25 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof.
200,001 cubic yards (152 912m3) or more - $402.25 for the first 200,000 cubic yards (152 911m3), plus $7.25
for each additional 10,000 cubic yards 7645.5m3 or fraction thereof.
Other Fees:
hours)
Additional plan review required by changes, additions or revisions to approved
$50.50 per hour*
plans
3. Inspections for which no fee is specifically indicated (minimum charge —
minimum charge is one -half hour
one half hour
*Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
overhead, equipment, hourly wages and fringe benefits of the employees involved.
TABLE A -33 -B- GRADING PERMIT FEES
50 cubic yards 38.2m3 or less
$23.50
51 to 100 cubic yards 40m3 to 76.5m3
$37.00
101 to 1,000 cubic yards (77.2m3 to 764.6m3) - $37.00 for the first 100 cubic yards (76.5m3) plus $17.50 for
each additional 100 cubic yards 76.5m3 or fraction thereof
1,001 to 10,000 cubic yards (765.3m3 to 7645.5m3) - $194.50 for the first 1,000 cubic yards (764.6m3), plus
$14.50 for each additional 1,000 cubic yards 764.6m3 or fraction thereof.
10,001 to 100,000 cubic yards (7646.3m3 to 76,455m3) - $325.00 for the first 10,000 cubic yards (7645.5m3),
plus $66.00 for each additional 10,000 cubic yards 7645.5m3 or fraction thereof.
100,001 cubic yards (76 456m3) or more - $919.00 for the first 100,000 cubic yards (76 455m3), plus $36.50 for
each additional 10,000 cubic yards 7645.5m3 or fraction thereof.
Other Inspections and Fees:
1. Inspections outside of normal business hours (minimum charge - two
$50.50 per hr2
hours)
$50.50 per hr2
2. Re- inspection fees assessed under provisions of Section 108.8
$50.50 per hr2
3. Inspections for which no fee is specifically indicated (minimum charge —
one half hour
1 The fee for a grading permit authorizing additional work to that under a valid permit shall be the difference
between the fee paid for the original permit and the fee shown for the entire project.
2 Or the total hourly cost to the jurisdiction, whichever is the greatest. This cost shall include supervision,
overhead, equipment, hourly wages and fringe benefits of the employees involved.
25