Loading...
HomeMy WebLinkAbout6.j. Authorize Preparation of Plans an Specifications - Rosewood Village 3rd Addition, City Project #429ROSEMOEXECUTIVE SUMMARY CITY COUNCIL City Council Meeting: July 6, 2010 AGENDA ITEM: Authorize Preparation of Plans and AGENDA SECTION: rd Specifications- Rosewood Village 3 Addition, City Project #429 Consent PREPARED BY: Andrew J Brotzler, PE, Director _ Public � ' AGENDA NO. �. Works /City Engineer ATTACHMENTS: Resolution, Map APPROVED BY: RECOMMENDED ACTION: Motion to Adopt a Resolution Authorizing the Preparation of Plans and Specifications for the Rosewood Village 3rd Addition, City Project #429. BACKGROUND: The Rosewood Village 3`d Addition is the next phase of the Rosewood development and is comprised of 6 detached townhome lots surrounded by common open space, outlots for the adjacent failroad'spur and stormwater pond, and an additional lot for future development. On June 15, 2010 the City Council entered into a Subdivision Agreement for Rosewood Village 3`d Addition. The proposed`improvements include the construction of a private street and cul -de -sac that includes concrete curb and gutter. An additional private roadway is proposed to be extended west from the cul-de- sac to provide an emergency access for the property west of the Rosewood Village 3`d Addition. Utility improvements include the construction of water main, sanitary sewer, and storm - sewer. 1. Streets The street improvements include a private street and cul -de -sac that will be constructed to a width of 28- feet with modified `S' (surmountable) concrete curb and gutter.. The cul -de -sac will be located on the west side of the development and an additional 14 foot wide emergency access roadway -will extend to the ,. railroad tracks to provide an emergency access to the property west of Rosewood Village 3`d Addition. 2. Utility Improvements Utility improvements include the installation of water main, sanitary sewer, and storm sewer. Water main and sanitary sewer are proposed to extend to the west edge of the property to provide a future connection to the property west of Rosewood'Village 3`d Addition. 3. Cost and Funding The total preliminary estimated project cost is $156,000, which includes a 10% contingency and 30% indirect costs. The funding for the improvements will be collected from the developer, KJ Walk, Inc., who will be funding 100% of project cost. A cash deposit has been received from the developer to fund costs associated with preparation of plans and specifications for the project. G:AENGPROJ \429 \07062010 CC AuthPln &Spcc.doc 4. Schedule It is° anticipated that the public improvements for Rosewood Village 3rd Addition will be started and fully completed, including all restoration items except the bituminous wear course, by the end of the construction season. t SUMMARY: i Staff is requesting that the City Council adopt the attached resolution ordering the project and authorizing the preparation of plans and specifications for City Project #429. 2 G: \ENGPROJ \429 \07062010 CC AuthPln &Spec,doc E L CITY OF "ROSEMOUNT DAKOTA COUNTY, MINNESOTA RESOLUTION 2010 —' A,RESOLUTION AUTHORIZING THE PREPARATION OF PLANS AND SPECIFICATIONS FOR ROSEWOOD VILLAGE 3RD ADDITION STREET AND UTILITY, IMPROVEMENTS CITY PROJECT #429 x WHEREAS, KJ Walk, Inc. has requested the City of Rosemount prepare plans.and specifications for Rosewood Village 3rd Addition Street and Utility-Improvemetifs, City Project #429; and WHEREAS, KJ Walk, Inc. has deposited the necessary funds with the City for preparation of the plans fi and specifications for City Project #429; and WHEREAS, KJ Walk, Inc. acknowledges that this action does not imply or guarantee City Council approval of the final plat for Rosewood Village 3rd Addition. R NOW THEREFORE BE IT RESOLVED, the City Councitof the City of Rosemount orders the preparation of plans and specifications for said improvements of City Project #429. ADOPTED this 6th day of July, 2010. a- William H. Droste, Mayor ATTEST: - F Amy Domeier, City Clerk G 1 Erickson Park ROSEvIO 280 560 1,120 1,680 2,240 N T: /GIs /cit /Ma Feet y ps/Departmental Maps /Engineering /Chris /Rosewood Village 3rd Locate July 2010 w,