HomeMy WebLinkAbout6.h. Change Order #3 - Akron Avenue Trunk Utility & Railroad Improvements, City Project #417ROSEM0UNTEXECUTIVE SUMMARY CITY COUNCIL Special City Council Meeting: February 1, 2010 AGENDA ITEM: Change Order #3 — Akron Avenue Trunk AGENDA SECTION: Utility & Railroad Improvements, City Consent Project #417 PREPARED BY: Andrew J. Brotzler, PE, Director of Pu i AGENDA NO. Vh. Works /City Engineer ATTACHMENTS: Change Order #3; Map APPROVED BY: RECOMMENDED ACTION: Motion to Approve Change Order #3 for the Akron Avenue Trunk Utility & Railroad Improvements, City Project #417. BACKGROUND: Attached for Council consideration is Change Order #3 for the Akron Avenue Trunk Utility & Railroad Improvements, City Project #417. This change order represents the addition of work previously deleted from the contract in Change Order No. 2, approved by City Council on May 15, 2009. At that time, permanent and temporary easements necessary to construct trunk watermain and sewer improvements on Akron Avenue north of Bonaire path had not been granted by the adjacent landowner west of Akron Avenue, and sewer and watermain improvements were ended at the Akron Avenue / Bonaire Path intersection for extension north in the future. Late in 2009, the aforementioned easements were dedicated to the City at no cost, and Change Order No. 3 reflects the addition back into City Project #417 the work north of Bonaire Path included in the original contract. Extension of trunk sewer and watermain improvements north of Bonaire Path will serve future development on the McMenomy property and others to the north and west of the project area, as well as the City -owned property previously considered for the future Outdoor Athletic Complex. Cost savings will be realized in the long term by completing the trunk utility improvements ahead of the CR 73 roadway improvements, City Project #399, since connection to the trunk utilities with future development will not require removal and replacement of the fully improved (bituminous pavement, concrete curb and gutter, and concrete median) roadway at Bonaire Path. This change results in a net increase of $684,641.55 to the contract for a revised contract amount of $3,170,380.03. All items affected by Change Order No. 3 are funded by the Core Sewer and Core Watermain funds. Unit bid prices will remain the same in Change Order No. 3 with no increases. Additionally, the project completion date has also been changed to June 5, 2010, to reflect the addition of work to the contract and coordination with the CR 73 roadway improvements schedule. SUMMARY: Staff recommends Council approval of Change Order No. 3 for the Akron Avenue Trunk Utility & Railroad Improvements, City Project #417. G: \ENGPROJ \417 \02012010 CC ChangeOrderldoc WSB & Associates, Inc. Infrastructure ■ Engineering ■ Planning ■ Construction 701 Xenia Avenue South Suite 300 Minneapolis, MN 55416 Tel: 763 5414800 January 26, 2010 Mr. Andy Brotzler, PE City Engineer City of Rosemount 2875 —145th Street West Rosemount, MN 55068 Re: Change Order No. 3 Akron Avenue Trunk Utility and Railroad Improvements City of Rosemount Project No. 417 WSB Project No. 1668 -30 Dear Mr. Brotzler: Please find enclosed Change Order No. 3 (four copies) for the above- referenced project. The change order reflects a net increase to the contract in the amount of $684,641.55 for a revised contract total of $3,170,380.03. This revised contract amount reflects the addition of work north of Bonaire Path previously deleted due to lack of adequate easement area to construct the improvements. At this time, all necessary easements have been obtained to move forward with the installation of sewer and water north of Bonaire Path. If the attached meets with your approval, please sign and process. If you have any questions or comments regarding the enclosed, please contact me at 651- 322 -2724. Thank you. Sincerely, WSB & Associates, Inc. Morg Da 1 , PE Proje ge Enclosures cc: Cindy Dorniden, City of Rosemount Joseph LaTour, LaTour Construction, Inc. tsf Minneapolis ■ St. Cloud Equal Opportunity Employer CHANGE ORDER NO.3 AKRON AVENUE TRUNK UTILITY AND 2/1/2010 RAILROAD IMPROVEMENTS CITY ROSEMOUNT PROJECT NO. 417 WSB PROJECT NO. 1866-30 OWNER: CITY OF ROSEMOUNT 2675 -145TH STREET WEST ROSEMOUNT, MN 55008 CONTRACTOR: LATOUR CONSTRUCTION, INC. 2134 CO. RD. 8 NW MAPLE LAKE, MN 55358 YOU ARE DIRECTED TO MAKE THE FOLLOWING CHANGES IN THE CONTRACT DOCUMENT DESCRIPTION: ADDITION OF ALL WORK NORTH OF BONAIRE PATH PREVIOUSLY DELETED IN CHANGE ORDER 2. ALL EASEMENTS NORTHWEST OF AKRON AVENUE AND BONAIRE PATH HAVE BEEN OBTAINED. IT IS UNDERSTOOD THAT THIS CHANGE ORDER INCLUDES ALL ADDITIONAL COSTS AND TIME EXTENSIONS WHICH ARE IN ANY WAY, SHAPE, OR FORM ASSOCIATED WITH THE WORK ELEMENTS DESCRIBED ABOVE. CHANGE IN CONTRACT PRICE: CHANGE IN CONTRACT TIME: ORIGINAL CONTRACT PRICE: $3,102,181.88 ORIGINAL CONTRACT TIME: 9/112009 PREVIOUS CHANGE ORDERS: CHANGE ORDER 1 $22,448.37 NET CHANGE FROM PREVIOUS CHANGE ORDERS: NONE PREVIOUS CHANGE ORDERS: CHANGE ORDER 2 ($638,891.55) CONTRACT TIME PRIOR TO THIS CHANGE ORDER: 8/1/2009 CONTRACT PRICE PRIOR TO THIS CHANGE ORDER, $2,485,738.48 NET INCREASE WITH CHANGE ORDER: 308 DAYS NET INCREASE OF THIS CHANGE ORDER: $684,641.55 CONTRACT TIME WITH APPROVED CHANGE ORDERS 6/5/2010 CONTRACT PRICE WITH ALL APPROVED CHANGE ORDERS: $3,170,380.03 RECOMMENDED BY: APPROVED BY: LATOUR CONSTRUCTION, INC. CONTRACTOR APPROVED BY: CITY ENGINEER CITY ADMINISTRATOR DATE OF COUNCIL ACTION K.. to loo"14dmfnlCons&wtionAdmIniftMe ordaralChangoOMar#M@68.40 Change Onfor 3.x/aC0.1 uosEMOUnT N 0 750 1,500 3,000 4,500 6,000 W�L Feet S December 20C TJGIS /City /Maps /Departmental Maps /Engineering /Chris /CR73 Utility Locate.mxd